ASX Announcement Artemis Resources Limited ABN: 80 107 051 749 Email: info@artemisresources.com.au Level 2, 10 Ord Street, West Perth 6005 PO Box 86 West Perth WA 6872 www.artemisresources.com.au Page | 1 31 October 2025 Quarterly Activities Report For the period ending 30 September 2025 _______________________________________________________________________________ Excellent progress was made during the quarter by Artemis Resources Limited (‘Artemis’ or the ‘Company’) (ASX/AIM: ARV ) during the early stages of the exploration and drilling campaign planned for the Karratha Gold-Copper Project and Cassowary Exploration Project. Drilling started at the Karratha Project on 23 September 2025 with an 18- hole reverse circulation ( ‘RC’) drilling program intended to test two shallow gold targets at the Titan gold prospect located 2-3km northwest of the Carlow gold copper resource1. The RC drilling program consisted of widely spaced RC holes drilled across the Titan East target located within the structural zone which hosts Carlow , and the G1 gravity anomaly which includes small outcrops of brecciated and ferruginous chert with high grade gold occurrences from surface rock chip sampling, reported during 20242. The Titan RC drilling was very effective intersecting a range of favourable gold host rocks including chrome rich ultramafic units, chert, mafic volcanics and sediments with local zones of alteration, quartz veining and sulphides. No assay results were received before the end of the reporting period from drill samples sent for analysis from the Titan East and the G1 targets. Post the reporting period, assay results from one RC drill hole at Titan East were announced on 29 October 20253. This announcement highlighted an intersection of 5m @ 13.1g/t gold from 132m down hole in 25ARRC006 - the first hole to test an interpreted NE trending shear zone at Titan East. Based on the intersection in 25ARRC006, preparations are underway for diamond drilling in the December quarter to follow up these very encouraging early results. Diamond drilling will also be carried out along strike from an intersection of 7m @ 2.9g/t Au in 25ARDD001 600m east of the Carlow resource (refer to ARV announcement on 28 April 2025). Widely spaced drilling is planned to start in January 2026 to scope out potential for high- grade gold mineralisation between hole 25ARDD001 and the current limit of drilling at Carlow. Excellent progress was also made at the Cassowary Exploration Project during the quarter with the key 341km 2 tenement (E69/4266) covering the large , interpreted Cassowary Intrusion granted on 11 August 2025. This was followed by lengthy negotiation s for a Land Access Agreement covering all the Cassowary tenements (total area 1,129km2) which was executed by the Pila Nguru (Aboriginal Corporation) and announced on 13 October 2025. Artemis also completed a placement 4 for a total $4.925m from institutional and sophisticated investors in Australia and United Kingdom, announced on 21 July 2025 and 24 September 2025. Funds raised are being used for exploration drilling programs and for early development studies at Carlow and to progress exploration at the Cassowary Project. 1 Refer ARV ASX announcement on 13 October 2022 2 Refer ARV ASX announcement on 28 January 2025 3 Refer ARV ASX announcement on 29 October 2025 4 Refer ARV ASX announcement on 21 July 2025 and 24 September 2025
Page 2
ASX Announcement Page | 2 Karratha Gold-Copper Project Titan Gold Targets Titan is a large, structurally complex area along the northern side of the Regal Thrust which outcrops as a prominent chert ridge ( refer Figure 1). Titan is largely obscured by transported cover which limits the effectiveness of surface exploration, including soil geochemistry. Despite its proximity to Carlow and high-grade gold assays from surface samples of quartz veins and chert outcrops reported in 20245 only three diamond holes were drilled at Titan prior to the RC drilling program which commenced in September. All three diamond holes drilled by Artemis at Titan East in March 2025 (25ARDD003, 25ARDD004 and 25ARDD005) reported elevated gold values (to 0.5g/t Au) including a 1m assay of 16.4g/t Au6 (refer Figures 1 and 2). Following heritage clearance received in July 2025 , an 18-hole RC drilling program started in late September to test a 500m section of the Titan East target (10 holes) and the G1 gravity target (8 holes) – total meterage for the 18 holes drilled across both targets was 1,748m. Lithologies intersected at Titan East and at the G1 Target in the recent RC drilling program include strongly sheared and altered ultramafic and mafic units, metasediments and chert. A 50m wide porphyry dyke was also intersected in the three previous diamond drill holes6. Figure 1: Carlow tenement with location of Titan Prospect within Regal Thrust Zone - showing chert outcrops (brown), major thrusts (black), area of March Quarter drilling at Titan East, and four interpreted gravity-high anomalies (G1-G4). 5 Refer ARV ASX announcement on 28 January 2025 and 3 June 2025 6 Refer ARV ASX announcement on 28 April 2025
Page 3
ASX Announcement Page | 3 Figure 2: Satellite image of Titan area showing location of RC drill holes completed at Titan East and G1 targets during the September 2025 quarter. Figure 3: Titan G1 Target - outcrop of brecciated and banded chert (~ 5m wide) with thin stockwork iron oxide veins. A surface rock chip sample of brecciated chert 24AR28-002 (above) from this outcrop assayed 51.8g/t Au. 3,11
Page 4
ASX Announcement Page | 4 Carlow Resource Extension Drilling The 2022 Carlow Mineral Resource estimate contains 374koz gold and 66,000t copper 7 and remains open to the east and below approximately 380m vertical depth. A previous review of the Carlow resource by Artemis focused on the potential of the high-grade gold and copper lodes within the wider resource . The review identified more than 190 assays >10.0 g/t gold in 80 historic holes and more than 500 assays >2.0% copper in 162 historic holes8. Diamond drilling is planned to commence in January 2026 to scope out the potential for extensions to the Carlow gold-copper lode system, beyond the current limit of drilling in three stages9 (refer Figure 1 and 4). The focus of the program includes: 1. Widely spaced holes within a 600m gap extending east from the existing resource up to an isolated intersection of: 7m @ 2.9g/t Au, including 1m @ 15.3g/t Au 2. Widely spaced holes to follow up an isolated historic intersection of: 4m @ 11.1 g/t Au and 2.0% Cu 120m below the Carlow resource, which is open below 380m depth 3. Drilling at the Chapman/Thorpe prospect to test potential for repetitions of the gold and copper lodes south of Carlow below the flat lying Andover Intrusion Figure 4: Schematic longitudinal section extending 2.7km from recent drilling at Titan to a 7m @ 2.9g/t Au intersection 600m east of the Carlow Mineral Resource10 - showing geological interpretation, resource outline including pierce points of drill holes with >10g/t Au and >2.0% Cu assays 11 and proposed drill holes (red diamonds) 7 Refer ARV ASX announcement on 13 October 2022 8 Refer ARV ASX announcement on 3 June 2025 9 Refer ARV ASX announcement on 28 April 2025 10 Refer ARV ASX announcement on 13 October 2022 11 Refer to Tables 1-4 in ARV ASX announcement on 28 April 2025
Page 5
ASX Announcement Page | 5 Cassowary Exploration Project Excellent progress was also made at the Cassowary Project during the September 2025 quarter with the key Exploration Licence E69/4266 (341km2) covering the large, interpreted Cassowary Intrusion granted on 11 August 202512. This was followed by execution of a Land Access Agreement for Exploration and Prospecting with the Pila Nguru (Aboriginal Corporation) RNTBC, the registered Native Title Body Corporate on 10 October 2025. The Land Access Agreement applies to E69/4266 and four additional tenements applied for by Artemis subsidiary, KML No 2 Pty Ltd, at the Cassowary Project. Post the reporting period, Artemis lodged a work program with Pila Nguru to conduct diamond drilling at four proposed sites across the Cassowary Intrusion, subject to heritage clearance. Figure 5: Location map showing three major crustal boundaries, Cassowary tenements and main access roads Cassowary is located 440km east of Kalgoorlie and is accessible via the Trans Australian rail line access road, the Connie Sue ‘Highway’ and station tracks (refer Figure 1). The Cassowary Intrusion is a rare opportunity to test a large, undrilled exploration target in a very favourable geological setting for potential IOCG type copper/gold, and other types of intrusion related mineralization. The p otential of the Cassowary Project area has been given added credibility with adjacent EL applicant WA1 Resources Ltd (ASX: WA1) also announcing it is targeting IOCG13 Four magnetic and structural targets (T1 –T4) have been identified within E69/4266 (refer to Figure 6). The core of the Cassowary Intrusion (T1) is the first priority for planned drilling. E69/4266 covers the northern part of an interpreted 30-40km wide rift zone bounded by the Madura Crustal Boundary to the west and an un -named geological domain to the east. A 12 Refer ARV ASX announcement 18 August 2025 13 Refer WA1 ASX announcement 28 April 2025
Page 6
ASX Announcement Page | 6 separate application has been made for an exploration licence, EL69/4330 (447km2) to cover additional interpreted intrusions in the southern part of the rift zone14 Figure 6: Regional magnetic image of Cassowary Exploration Project showing Artemis tenements (granted and application) as at September quarter, WA1 tenement applications, and boundaries of interpreted rift zone. Source of magnetic data: GSWA- Geoview image 14 Refer to Figure 6 in this announcement
Page 7
ASX Announcement Page | 7 Corporate Capital Raising On 21 July 2025 and 24 September 2025, the Company announced completion of a placement to raise A$4. 925 million from institutional and sophisticated investors. The placement was oversubscribed and strongly supported by new and existing institutional investors and existing investors both in Australia and United Kingdom. Funding will enable advancement of go ld and copper exploration and drilling programs at the Carlow, Titan and Cassowary projects. Appendix 5B Disclosures ASX LR 5.3.1: Exploration expenditure during the September 2025 quarter totalled $483,000, primarily relating to the Carlow tenement. ASX LR 5.3.2: The Company confirms that there were no mining production and development activities during the quarter by the Company or its subsidiaries. ASX LR 5.3.3: • No mining tenements were acquired or disposed of during the quarter. • No farm-in or farm-out agreements were entered into during the quarter. • A tenement schedule, including the percentage interests held, is provided in Appendix 1. ASX LR 5.3.5: Payments to related parties totalled $230,000, comprising Directors’ salaries, superannuation and fees ($98,000), and Company Secretarial and Management fees paid to Director related entities ($132,000). Board Changes On 29 September 2025, the Company announced several planned board and management changes designed to support the Company’s next phase of growth and development. These are: • Mr Jozsef Patarica transitioned from Non-Executive Director to Executive Director • Mr Julian Hanna transitioned from Managing Director to Technical Director • Mr Guy Robertson to resign from his roles as Director and Company Secretary (note: this resignation became effective on 30 September 2025) • Ms Vivienne Powe will step down from the board at the Company’s AGM in November 2025 (note: the AGM is due to be held on 27 November 2025, following which Ms Powe will no longer be a Director of the Company) • Mr Henko Vos and Ms Jennifer Voon were appointed as Joint Company Secretaries
Page 8
ASX Announcement Page | 8 Chief Geologist Oliver Hirst and Technical Director Julian Hanna introducing Cassowary at Diggers and Dealers Conference in August 2025 This announcement was approved for release by the Board For further information: Mr Jozsef Patarica Executive Director Artemis Resources Limited +61 8 6261 5463 info@artemisresources.com.au Mr Julian Hanna Technical Director Artemis Resources Limited +61 8 6261 5463 info@artemisresources.com.au
Page 9
ASX Announcement Page | 9 Appendix 1 Schedule of tenement holdings at end of Q1 2026. All are in Western Australia Tenement Project Holder Holding Status E47/1797 Carlow KML No 2 Pty Ltd 100%* Live E47/1746 Cherratta KML No 2 Pty Ltd 100%* Live E47/3719 Osborne KML No 2 Pty Ltd 100%*# Live P47/1972 Cherratta KML No 2 Pty Ltd 100%* Live M47/337 Radio Hill Fox Radio Hill Pty Ltd 100% Live M47/161 Radio Hill Fox Radio Hill Pty Ltd 100% Live E47/3361 Radio Hill Fox Radio Hill Pty Ltd 100% Live L47/93 Radio Hill Fox Radio Hill Pty Ltd 100% Live E45/5276 Central Paterson Elysian Resources Pty Ltd 100% Live E69/4266 Cassowary KML No 2 Pty Ltd 100% Live E69/4317 Cassowary KML No 2 Pty Ltd 100% Pending E69/4318 Cassowary KML No 2 Pty Ltd 100% Pending E69/4330 Cassowary KML No 2 Pty Ltd 100% Pending E69/4334 Cassowary KML No 2 Pty Ltd 100% Pending *Beneficial interest under the Andover Lithium Pty Ltd joint venture with GreenTech Metals Limited is 50% for lithium exploration. Beneficial interest held by Artemis is 100% for all other commodities. #Beneficial interest under the Osborne joint venture with GreenTech Metals Limited is 49% for commodities, excluding lithium (refer * above) and excluding gold. Carlow mineral resource estimate - Refer to Artemis ASX announcement 13 October 2022.
Page 10
ASX Announcement Page | 10 Competent/ Qualified Person Statement The information in this report that relates to Exploration Results was compiled by Mr Julian Hanna, a Competent Person who is a member of the Australasian Institute of Mining and Metallurgy (MAusIMM). Mr Hanna is Managing Director of Artemis Resources Ltd and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Cod e for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Hanna consents to the inclusion in this report of the matters based on his information in the form and context in which it appears. Mr Hanna is also considered a qualified person for the purposes of the Aim Rules. No New Information To the extent that this announcement contains references to prior exploration results which have been cross referenced to previous market announcements made by the Company, unless explicitly stated, no new information is contained. The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. About Artemis Resources Artemis Resources (ASX/AIM:ARV) is a gold and copper focused resources company with a highly attractive suite of projects including projects in Western Australia’s underexplored North Pilbara Gold Province and at the Cassowary Exploration Project located 440km east of Kalgoorlie in Western Australia. • Attractive projects: o Gold/Copper – Karratha Gold Project (100%) multiple prospects incl: Carlow, Titan, Thorpe o Copper/Gold – Cassowary Exploration Project – large IOCG type and intrusion related targets o Paterson Gold/Copper Project – adjacent to Havieron Mine (owned Greatland Gold) o Lithium – Artemis/Greentech Lithium JV: Mt Marie, Kobe, Osborne • Highly strategic location: Tier 1 jurisdiction, close proximity to major hub at Karratha including regional rail and road infrastructure, administrative centre and Dampier Port • Significant exploration upside: highly prospective tenure package in the Pilbara Region of Western Australia which is rapidly emerging gold province dominated by >12Moz Au Hemi Project • Mineral Resource with growth potential: existing high-grade gold-copper Mineral Resource at Carlow • Established processing site at Radio Hill: strategically located, fully permitted • Cassowary Exploration Project: Artemis holds a granted 341km 2 exploration licence covering the large, interpreted Cassowary Intrusion prospective for IOCG type copper/gold and has four other exploration licence applications to cover other interpreted intrusions within a 30-40km wide interpreted rift zone Figure 7: Satellite image showing outline of Artemis tenement holdings south and east of Karratha (Carlow Resource - refer to ARV ASX announcement on 13 October 2022 and its Appendix)
Page 11
Rule 5.5 ASX Listing Rules Appendix 5B (17/07/20) Page 1 + See chapter 19 of the ASX Listing Rules for defined terms. Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report Name of entity Artemis Resources Limited ABN Quarter ended (“current quarter”) 80 107 051 749 30 September 2025 Consolidated statement of cash flows Current quarter $A’000 Year to date (3 months) $A’000 1. Cash flows from operating activities - - 1.1 Receipts from customers 1.2 Payments for (10) (10) (a) exploration & evaluation (b) development - - (c) production - - (d) staff costs (210) (210) (e) administration and corporate costs (501) (501) 1.3 Dividends received (see note 3) - - 1.4 Interest received 2 2 1.5 Interest and other costs of finance paid (2) (2) 1.6 Income taxes paid - - 1.7 Government grants and tax incentives - - 1.8 Other – JV Receipts 75 75 1.9 Net cash from / (used in) operating activities (646) (646) 2. Cash flows from investing activities - - 2.1 Payments to acquire or for: (a) entities (b) tenements - - (c) property, plant and equipment (d) exploration & evaluation (483) (483) (e) investments - - (f) other non-current assets - -
Page 12
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report ASX Listing Rules Appendix 5B (17/07/20) Page 2 + See chapter 19 of the ASX Listing Rules for defined terms. Consolidated statement of cash flows Current quarter $A’000 Year to date (3 months) $A’000 2.2 Proceeds from the disposal of: - - - - (a) entities (b) tenements - - (c) property, plant and equipment - - (d) investments - - (e) other non-current assets - - 2.3 Cash flows from loans to other entities - - 2.4 Dividends received (see note 3) - - 2.5 Other (provide details if material) - - 2.6 Net cash from / (used in) investing activities (483) (483) 3. Cash flows from financing activities 4,875 4,875 3.1 Proceeds from issues of equity securities (excluding convertible debt securities) 3.2 Proceeds from issue of convertible debt securities - - 3.3 Proceeds from exercise of options - - 3.4 Transaction costs related to issues of equity securities or convertible debt securities (328) (328) 3.5 Proceeds from borrowings - - 3.6 Repayment of borrowings - - 3.7 Transaction costs related to loans and borrowings - - 3.8 Dividends paid - - 3.9 Other – right-of-use lease liabilities (28) (28) 3.10 Net cash from / (used in) financing activities 4,519 4,519 4. Net increase / (decrease) in cash and cash equivalents for the period 4.1 Cash and cash equivalents at beginning of period 1,154 1,154 4.2 Net cash from / (used in) operating activities (item 1.9 above) (646) (646) 4.3 Net cash from / (used in) investing activities (item 2.6 above) (483) (483) 4.4 Net cash from / (used in) financing activities (item 3.10 above) 4,519 4,519
Page 13
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report ASX Listing Rules Appendix 5B (17/07/20) Page 3 + See chapter 19 of the ASX Listing Rules for defined terms. Consolidated statement of cash flows Current quarter $A’000 Year to date (3 months) $A’000 4.5 Effect of movement in exchange rates on cash held - - 4.6 Cash and cash equivalents at end of period 4,544 4,544 5. Reconciliation of cash and cash equivalents at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts Current quarter $A’000 Previous quarter $A’000 5.1 Bank balances 1,044 1,154 5.2 Call deposits 3,500 - 5.3 Bank overdrafts - - 5.4 Other (provide details) - - 5.5 Cash and cash equivalents at end of quarter (should equal item 4.6 above) 4,544 1,154 6. Payments to related parties of the entity and their associates Current quarter $A'000 6.1 Aggregate amount of payments to related parties and their associates included in item 1 230 6.2 Aggregate amount of payments to related parties and their associates included in item 2 - Note: Items in 6.1 include payments for directors fees, company secretarial and consulting fees paid to the directors or their associated entities for services provided to the company.
Page 14
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report ASX Listing Rules Appendix 5B (17/07/20) Page 4 + See chapter 19 of the ASX Listing Rules for defined terms. 7. Financing facilities Note: the term “facility’ includes all forms of financing arrangements available to the entity. Add notes as necessary for an understanding of the sources of finance available to the entity. Total facility amount at quarter end $A’000 Amount drawn at quarter end $A’000 7.1 Loan facilities - - 7.2 Credit standby arrangements - - 7.3 Other (please specify) - - 7.4 Total financing facilities - - 7.5 Unused financing facilities available at quarter end - 7.6 Include in the box below a description of each facility above, including the lender, interest rate, maturity date and whether it is secured or unsecured. If any additional financing facilities have been entered into or are proposed to be entered into after quarter end, include a note providing details of those facilities as well. 8. Estimated cash available for future operating activities $A’000 8.1 Net cash from / (used in) operating activities (item 1.9) (646) 8.2 (Payments for exploration & evaluation classified as investing activities) (item 2.1(d)) (483) 8.3 Total relevant outgoings (item 8.1 + item 8.2) (1,129) 8.4 Cash and cash equivalents at quarter end (item 4.6) 4,544 8.5 Unused finance facilities available at quarter end (item 7.5) - 8.6 Total available funding (item 8.4 + item 8.5) 4,544 8.7 Estimated quarters of funding available (item 8.6 divided by item 8.3) 4.02 Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”. Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7. 8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions: 8.8.1 Does the entity expect that it will continue to have the current level of net operating cash flows for the time being and, if not, why not? Answer: N/A 8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further cash to fund its operations and, if so, what are those steps and how likely does it believe that they will be successful? Answer: N/A 8.8.3 Does the entity expect to be able to continue its operations and to meet its business objectives and, if so, on what basis? Answer: N/A Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Page 15
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report ASX Listing Rules Appendix 5B (17/07/20) Page 5 + See chapter 19 of the ASX Listing Rules for defined terms. Compliance statement 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A. 2 This statement gives a true and fair view of the matters disclosed. Date: 31 October 2025 Authorised by: The Board ............................................... (Name of body or officer authorising release – see note 4) Notes 1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the past quarter , how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so. 2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report. 3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity. 4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [name of board committee – eg Audit and Risk Committee] ”. If it has been authorised for release to the market by a disclosure committee, you can insert here: “By the Disclosure Committee”. 5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.