Page 1
Rare Earths. Critical Minerals. High-tech Metals. Diggers & Dealers Mining Forum Rowena Smith, Managing Director & CEO 4 August 2025 For personal use only
Page 2
© ASM 2025 | Disclaimer & Competent Person’s Statement Summary Information This Presentation contains summary information about ASM and its subsidiaries (together, the ASM Group) and the activities of the ASM Group that is current as at the date of this Presentation, unless otherwise indicated. This Presentation does not comprise a ll of the information that a shareholder or potential investor in ASM may require in evaluating an investment in ASM. The information in this Presentation should be read in conjunction with ASM’s other periodic and continuous disclosure announcements lodged with the ASX, which are available on the ASX website (at www.asx.com.au) or ASM’s website (at asm -au.com). This Presentation has been prepared based on information available to ASM as at the date of this Presentation, including information from third parties that has not been independently verified. No representation or warranty, express or implied, is made as to the fairness, accuracy, correctness, adequacy, reliability o r completeness of the information or opinions contained in this Presentation. Except for any statutory liability which cannot b e excluded, each member of the ASM Group and their respective directors, officers, employees, agents and advisers expressly dis claim all liability for any direct or indirect loss or damage that may be suffered by any person in relation to, and take no respon sibility for, any information in this Presentation or any error, misstatement or omission from it. Forward Looking Statements This Presentation contains certain statements which constitute “forward looking statements”. Often, but not always, forward look ing statements can generally be identified by the use of forward looking words such as “may”, “will”, “expect”, “plan”, “believes”, “estimate”, “anticipate”, “outlook” and “guidance”, or similar expressions, and may include, without limitation, statements regarding pla ns; strategies and objectives of management; anticipated production and production potential; estimates of future capital expendi ture or construction commencement dates; expected costs or production outputs; estimates of future product supply, demand and consumption; statements regarding future product prices; and statements regarding the expectation of future Mineral Resources and Ore Reserves. Indications of, and guidance on, future earnings and financial position and performance are also forward -looking statements. While these forward-looking statements reflect the Company’s expectations at the date of this Presentation, they are not guarant ees or predictions of future performance or statements of fact. The information is based on the Company forecasts and as such is subject to variation related to, but not restricted to, economic , market demand/supply and competitive factors. A number of important factors could cause actual results or performance to differ materially from the forward -looking statements, including known and unknown risks (such as, for example, those contained in the ‘Key risks’ section of this Presentation). Th ese factors may include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic factors, increased capital costs and operating costs, the speculative nature of exploration and project development, general mining an d development risks, closure and rehabilitation risks, changes to the regulatory framework within which the ASM Group operates or may in the future operate, environmental conditions and environmental issues, and the recruitment and retention of key person nel, industrial relations issues and litigation. Forward looking statements are only predictions and are subject to known and unknown risks, uncertainties, assumptions, and other important factors that could cause the actual results, performances or achieveme nts of the Company to differ materially from future results, performances or achievements expressed, projected or implied by such fo rward looking statements. Forward-looking statements, opinions and estimates provided in this document are based on assumptions and contingencies that are subject to change without notice. There can be no assurance that actual outcomes will not differ materiality from these forwa rd- looking statements. Readers are cautioned not to place undue reliance on these forward -looking statements, which speak only as o f the date thereof. Except as required by applicable laws or regulations, the Company does not undertake to publicly update or review any forward-looking statements, whether as a result of new information or future events. The Company cautions against reliance o n any forward-looking statements or guidance, particularly in light of the current economic climate. Information on likely developments in the ASM Group’s business strategies, prospects and operations for future financial years a nd the expected results that could result in unreasonable prejudice to the ASM Group (for example, information that is commercia lly sensitive, confidential or could give a third party a commercial advantage) has not been included below in this Presentation. The categories of information omitted include forward looking estimates and projections prepared for internal management purposes, information regarding the Company’s operations and projects, which are developing and susceptible to change, and information relating to commercial contracts. Readers should consider the forward-looking statements contained in this Presentation in light of those risks and disclosures. Neither the ASM Group, nor any of its directors, officers, employees, agents or advisers makes any representation or warranty, express or implied as to the accuracy, likelihood of achievement or reasonableness of any forward -looking statement contained in this Presentation. Except as required by law or regulation (including the ASX Listing Rules), none of the ASM Group, nor any of its directors, officers, employees, agents or advisers undertakes any obligation to supplement, revise or update forward -looking statements or to publish prospective financial information in the future, regardless of whether new information, future events, results or oth er factors affect the information contained in this Presentation. Competent Person The information in this Presentation that relates to ASM’s Mineral Resources is extracted from ASM’s Information Memorandum released to ASX on 29 July 2020 and is available at www.asx.com.au. ASM confirms that it is not aware of any new information or data that materially affects the information included in that original market announcement and that all material assumptions and t echnical parameters underpinning the estimates in that announcement continue to apply and have not materially changed. ASM confirms that the form and context in which the findings of the Competent Person are presented have not been materially modified from the original market announcement. The Competent Person for that announcement was Mr D I Chalmers. Dubbo Project production targets and financial forecasts The information in this Presentation that relates to ASM's production targets and financial forecasts for the Dubbo Project is extracted from ASM's ASX announcement titled “Heap Leach Option delivers major cost reductions for Dubbo Project" released to ASX on 11 July 2025 and is available at www.asx.com.au. ASM confirms that all the material assumptions underpinning the production targets, and the forecast financial information derived from the production targets, in that announcement continue to apply and have not materially changed. Previously reported information Optimization prepared and disclosed under the JORC Code has not materially changed since last reported in Company’s ASX announcements available to view on the Company’s website. The Company is not aware of any new information or data that materially affects the information included in this Presentation and confirms that the material assumptions and technical parame ters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. Non-IFRS financial measures This announcement contains certain financial measures (such as IRR) that are not recognised under International Financial Rep orting Standards (IFRS). Although the Company believes these measures provide useful information about the Company's financial forec asts, they should not be considered in isolation or as a substitute for measures of performance or cash flow prepared in accordance with IFRS. As these measures are not based on IFRS, they do not have standardised definitions and the way the Company calculates t hese measures may not be comparable to similarly titled measures used by other companies. Consequently, undue reliance should not be placed on these measures. JORC CODE It is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral resources in Australia comply wit h the Joint Ore Reserves Committee’s Australasian Code for Reporting of Mineral Resources and Ore Reserves (JORC Code). Investors outside Australia should note that while the estimates in this document comply with the JORC Code, they may not comply with the relev ant guidelines in other countries. Registered office and principal place of business Level 4, 66 Kings Park Road West Perth WA 6005 Telephone: +61 8 9200 1681 2 For personal use only
Page 3
© ASM 2025 | Australian Strategic Materials (ASM) is building a global rare earths and critical minerals business to provide the high-tech metals needed to solve the challenges of today and the future. 3 For personal use only
Page 4
© ASM 2025 | Geopolitical uncertainty driving opportunity 4 Geopolitical tensions creating supply chain urgency Heavy rare earths the strategic bottleneck ASM uniquely positioned for the new paradigm “I brought with me a permanent magnet. Not just any magnet – this is a rare earth permanent magnet. It was manufactured in Estonia, by a Canadian company using raw materials sourced from Australia, and supported by the EU’s Just Transition Fund…” President Ursula Von Der Leyen Statement from the G7 2025 For personal use only
Page 5
© ASM 2025 | Mine to metals strategy 5The strategy includes aspirational statements which are not intended to be forecasts, as ASM does not yet have reasonable grounds to expect that they will be achieved. For personal use only
Page 6
© ASM 2025 | Latest news Increased rare earth metals sales and customer base at Korean Metals Plant (KMP)1 Delivery of first heavy rare earth metals (terbium and dysprosium) from KMP2 Expansion plans for US Metals Plant in progress – awaiting US DoD funding decision Dubbo Project Heap Leach Option delivers low cost, low capital, accelerated pathway to rare earth production3 A$24.9M raised via SPP & institutional placement to accelerate growth initiatives4 6 1 Refer ASX Announcement, 6 June 2025: Growing momentum in metal and alloy sales 2 Refer ASX Announcement, 15 July 2025: Heavy rare earth metals sale & MOU with Neo Performance 3 Refer ASX Announcement, 11 July 2025: Heap Leach Option delivers major cost reductions for Dubbo Project 4 Refer ASX Announcement, 28 July 2025: Successful completion of Institutional Placement to raise A$13M For personal use only
Page 7
© ASM 2025 | Korean Metals Plant Providing an alternative integrated supply chain for high-tech metals. 7© ASM 2025 | For personal use only
Page 8
© ASM 2025 | Growth through sales and partnerships 8 5-year binding sales & tolling framework agreed 3 – samples delivered for magnet plant commissioning 1 7.2t multi-specification order 1 – deliveries commenced in July 2025 15t delivery across H2 2025 1 – part of 100t agreement 2 – deliveries commenced in July 2025 29t NdPr metal ordered (19t delivered), delivered first heavy rare earth sale, MoU in place 4 Working with third party oxide providers in Australia, the US, and the European Union 1 Refer ASX Announcement, 6 June 2025: Growing momentum in metal and alloy sales 2 Refer ASX Announcement, 16 May 2023: ASM signs agreement for sale of NdFeB alloy 3 Refer ASX Announcement, 3 August 2023: ASM signs long-term metal sales and tolling framework agreement with USA Rare Earth 4 Refer ASX Announcement, 15 July 2025: Heavy rare earth metals sale & MOU with Neo Performance For personal use only
Page 9
© ASM 2025 | KMP ramp-up 9 Installed capacity: 1,300tpa NdFeB ~US$60M invested to date Product suite: Neodymium & praseodymium metals NdFeB alloy Designed capacity: 3,600tpa NdFeB Capex investment ~US$8M1 Time ~18-months1 Heavy rare earth metals Product expansion of terbium and dysprosium Furnaces 3 Strip Caster 1 Furnaces 15 Strip Casters 2 Tb Dy Terbium Dysprosium Current Phase 2 ramp-up Product expansion 1The capex and time assumptions are based on current information from key vendors and may be subject to change. Commencement is subject to a range of matters such as assumptions about alignment with customer demand and the ability to fund and other economic assumptions. See Appendix A for complete assumptions and risks. For personal use only
Page 10
© ASM 2025 | KMP targeted financials 10 Based on estimated Phase 2 maximum production 3,600tpa NdFeB alloy 1 USD ~$204M annual revenue USD ~$26M annual EBITDA 1 Current installed capacity plus planned Phase 2 ramp-up 2 The estimated lead time for Phase 2 implementation is 18 months and will commence upon customer demand, with commencement being earlier or later than indicated. See Appendix A for complete assumptions and risks. Targeted Timeline 2025 2026 2027 Continue qualification processes and ramp-up sales with Western magnet makers Implement Phase 2, subject to Western magnet demand2 3,600tpa NdFeB alloy capacity achieved For personal use only
Page 11
© ASM 2025 | US Strategic Expansion Leveraging existing capability and relationships to target the emerging US market 11© ASM 2025 | For personal use only
Page 12
© ASM 2025 | Incentives for US expansion 12 Supporting America’s Mineral Future - Executive Order Increasing US Mineral Production - MP Materials & DoD Public-Private partnership1 Critical Minerals Funding Request - DoD whitepaper submitted seeking capex funding2 Supportive business environment - 45X tax credit, state-based grants and incentives Made in America mandate - Noveon Magnetics, USA Rare Earth 3 Competitive cost base - Supply and logistics costs, e.g. power 1 MP Materials announcement: MP Materials Announces Transformational Public-Private Partnership with the Department of Defense to Accelerate U.S. Rare Earth Magnet Independence 2 For recent example of DoD funding see: https://www.defense.gov/News/Releases/Release/Article/3573402/dod-awards-127-million-to-increase-titanium-powder-production-for-defense-suppl/ 3 Recent customer developments: https://www.defense.gov/News/News-Stories/Article/Article/3700059/dod-looks-to-establish-mine-to-magnet-supply-chain-for-rare-earth-materials/; https://noveon.co/nidec-and-noveon- magnetics-enter-agreement; https://www.usare.com/article?i=144487 For personal use only
Page 13
© ASM 2025 | American Metals Plant (AMP) project hurdles 1 13 Targeted Timeline Capacity of 2,000 tpa of alloy Initial production capacity, ability to expand to 4,000 tpa aligned to demand Up to 150 skilled jobs Created at full capacity, supporting local employment and economic growth Non-China REE feedstock Fully independent and diversified supply chain Accelerated delivery Established expertise and operational knowledge will reduce time to bring facility online 2025 2026 2027 Selection of the preferred US state for AMP Finalise AMP funding and permitting Construction commences targeted completion within 2 years 1 These are aspirational statements and are not intended to be forecasts as the Company does not yet have reasonable grounds to expect that the matters on this slide will be achieved. In the determination on proceeding with the AMP , ASM will consider whether the following project hurdles can be achieved. AMP targeting financials broadly aligned with KMP target financials For personal use only
Page 14
© ASM 2025 | Dubbo Project A unique ore body positioned to meet growing global demand. 14 NdPr Neodymium/ Praseodymium Tb Terbium Dy Dysprosium Hf Hafnium Zr Zirconium Nb Niobium © ASM 2025 | For personal use only
Page 15
© ASM 2025 | Prioritising rare earth production 15 Unique, long life ore body Major approvals in place Advanced process flowsheet & engineering Environment, Social & Governance credentials Tier 1 jurisdiction Lower cost pathway to rare earth production 15 Dubbo Project Rare Earth Options Assessment Heap Leach Option2 A$5M International Partnerships in Critical Minerals Funding1 1. Simplified Flowsheet 4. Robust Financials 3. Low Operating Costs 2. Reduced Up-front Capital 1 Refer ASX Announcement, 15 October 2024: ASM awarded A$5M Federal Government grant for Dubbo Project 2 Refer ASX Announcement, 11 July 2025: Heap Leach Option delivers major cost reductions for Dubbo Project For personal use only
Page 16
© ASM 2025 | Heap Leach Option - a transformational approach 1 16 1. Simplified Flowsheet NdPr oxide 1,157tpa A$740M2. Reduced Up-front Capital Capital forecast cost reduced by ~56% from A$1.67B estimate 2021 Optimisation Feasibility Study3 3. Low Operating Costs 4. Robust Financials IRR 22.9% Financials forecast across multiple pricing scenarios, including pre-tax NPV 8% of A$1,468 million5 1 Refer ASX Announcement, 11 July 2025: Heap Leach Option delivers major cost reductions for Dubbo Project 2 Average production targets for years 3-15 of mine life. 3 Refer to ASX Announcement, 7 December 2021: Dubbo Project Optimisation Delivers Strong Financials 4 Operating C1 Cast Cost over years 3-15 of mine life 5 Based on pricing upside, based solely on the pricing forecast from Adamas Intelligence, Refer ASX Announcement, 11 July 2025: Heap Leach Option delivers major cost reductions for Dubbo Project for further details and financials forecast across the various pricing scenarios. Dubbo Project forecast to break even at an NdPr price of USD 87/kg, Tb price of USD 1,160/kg and Dy price of USD 258/kg. Q1 costs Operating forecast expenses in lowest quartile of ex-China rare earth producers4 Leverages proven heap leach technology and extensive in-house purification, separation and refining work 2 Tb oxide 13 tpa Dy oxide 72 tpa For personal use only
Page 17
© ASM 2025 | Support for our pathway to production 17 Targeted Timeline 2026 2027 2029 Commence Dubbo Project construction Complete Dubbo Project construction Complete PFS - Q1 Commence pre-execution engineering & secure funding 923 1 400 200 0 100 200 300 400 500 600 700 800 900 1000 Export-Import Bank of the United States Export Development Canada Export Finance Australia Millions AUD Conditional debt funding support for construction of the Dubbo Project >A$1.5B ~A$49M Simplified offtake discussions conditional Export Credit Agency support 2 US EXIM Engineering Multiplier Program 3 1 Exchange rate (A$ : US$) – 0.65 2 Refer ASX Release, 1 April 2025: Extension of Letter of Interest from Export Development Canada and see also the previous ASM announcements referred to in that announcement. Funding support is conditional and non-binding. 3 Refer ASX Release, 25 March 2024: Bechtel contract to support ASM with engineering at the Dubbo Project For personal use only
Page 18
© ASM 2025 | Outlook An alternative supply chain for the global permanent magnet market 18© ASM 2025 | For personal use only
Page 19
© ASM 2025 | Magnet Manufacturers Delivering security across value chain 19 Metals, Alloys & PowdersSeparation & RefiningMining & Extraction ARAFURA LYNAS ILUKA HASTINGS NORTHERN MINERALS METEORIC ASX-listed companies with strategy to take REEs through to a concentrate / carbonate1 ASM’s strategy will take REEs all the way from mining through to metal and alloy production ASX-listed companies with strategy to take REEs through to an oxide1 1Information on peers obtained from publicly disclosed strategies and plans For personal use only
Page 20
© ASM 2025 | Expansion of KMP customer base H2 2025 Dubbo Project flowsheet optimisation H2 2025 US DoD funding decision for US Metals Plant H2 2025 Site selection for US Metals Plant Q1 2026 Deliver Dubbo Project Heap Leach PFS Q1 2026 What’s to come 1 20 1 These are aspirational statements and are not intended to be forecasts as the Company does not yet have reasonable grounds to expect that the matters on this slide will be achieved For personal use only
Page 21
© ASM 2025 | Corporate profile 21 Ordinary Shares 223.5M Share Price A$0.545 Market Capitalisation A$110.3M 52 week low/high A$0.32 – A$0.83 Cash (at 30 June 2025) A$19.0M Except where stated, all data is as 1 August 2025 Ian Gandel Non-Executive Chair Gavin Smith Non-Executive Director Dominic Heaton Non-Executive Director Kerry Gleeson Non-Executive Director Rowena Smith Managing Director Board of Directors Annaliese Eames Chief Legal & External Affairs Officer Stephen Motteram Chief Financial Officer Rowena Smith Chief Executive Officer Agata Carrabs VP Risk & Corporate Services Peter Finnimore VP Sales & Marketing Chris Jordaan Chief Operating Officer Executive Management 24% 19% 8% 49% Share Register Private Stakeholders/ Investors Directors & management Institutions Other As at 30 June 2025 For personal use only
Page 22
© ASM 2025 | Rare Earths. Critical Minerals. High-tech Metals. Thank you asm-au.com 22 For personal use only
Page 23
© ASM 2025 | Appendix A – KMP targeted financials assumptions and risks • Final product mix, revenue and EBITDA are estimates only and will be subject to customer demand • Reliable published benchmark data for KMP end products are not available. Raw materials and sales price assumptions and based on key raw material inputs from Argus (May 2025) and Adamas (August 2024) and ASM’s assessment of achievable sales pricing • The Company’s ability to successfully commercialise the Korean Metals Plant and achieve these targets may be affected by numerous risk factors including but not limited to: its ability to secure funding for the expansion, raw materials and customer offtakes, the plant not performing in accordance with expectations, fluctuations in market prices and cost overruns. If the Company is unable to manage these factors, this could result in the Company being unable to realise the Korean Metals Plant’s full potential. 23 Parameter Assumption Raw material sources NdPr oxides: Offtake from non-Chinese suppliers (currently in advanced negotiations), augmented by moving to Dubbo in long term Other rare earth oxides: Acquired on market initially, moving to Dubbo in long term and other non-Chinese offtakes Other raw materials (eg iron, boron): Acquired on market Raw material costs Rare earth oxides based on average of Adamas real long term forecasts (Q4 2024) for 2027 and 2028 NdPr: US$85/kg Dy: US$366/kg Tb: US$1,130/kg Other raw materials at December 2024 market rates All raw material costs inflated at 3% per annum from FY26 Currency rates Production costs are denominated in KRW and converted at a forward rate of 1,328 KRW / USD based on the average of analyst forecasts for December 2027 from Factset Alloy sales price Management estimates based on Adamas’ rare earth oxide forecasts, calculated by adding the historical difference between the raw material cost and the actual sales price (ie other materials, production costs and profit margin), which averages an additional 27% over the REE raw material cost. This results in NdFeB alloy sales prices of US$48/kg in 2025, US$57/kg in 2026 and US$64/kg in 2027 in the Base case Operating cash costs US$4/kg based on currently budgeted cash costs, expansion forecasts and 1,328 KRW / USD currency rate. Excludes raw materials Capital expansion costs US$6m – US$8m based on supplier and engineering quotes received in mid-2024 For personal use only
Page 24
© ASM 2025 | Appendix A – KMP targeted financials assumptions and risks 24 Risk Description Commercialisation impacts and supply chain risk The KMP is currently undergoing production ramp up and technical product validation with its initial customers. Commercialisation of the KMP may be affected by supply chain constraints such as: • supply of critical minerals. Until the Dubbo Project is operational, ASM is required to explore alternative feedstock options to provide security of supply to the KMP. Compounding this risk is the fact that the supply chain for many of ASM’s key raw materials (particularly rare earth oxides) is still in development stage ex-China; • metallurgical performance; • processing, loading, and heavy equipment failures and unexpected maintenance problems; and • limited availability or increased costs of processing, loading, heavy equipment and parts and other materials from suppliers. For the above reasons, ASM may encounter difficulties in meeting and consistently fulfilling customer requirements which will impact on its ramp up schedule and technical product validation. These supply chain risks may also affect ASM’s ability to meet product specifications under relevant offtake agreements. Accordingly, ASM may not be able to sell its products, or sell the same quantity of products as if relevant specifications have been satisfied. If any of the above risks materialise, there may be a material adverse impact on ASM’s operations, financial performance and financial position, including ASM’s capacity to meet its profitability goals. Counterparty risk ASM currently has agreements with: • Noveon Magnetics Inc, Vacuumschmelze and USA Rare Earth LLC in relation to the supply of neodymium iron boron (NdFeB) alloy; and • KCM and Magnequench in relation to the supply of neodymium praseodymium (NdPr) metal. Both products are developed at the KMP. There is a risk that the above counterparties or counterparties to future offtake contracts do not take their obligated quantities of product or seek to renegotiate the price or quantity of product. In addition, there are risks that: • Counterparties may suffer from insolvency, financial or managerial failure, capacity constraints, mobilisation issues, plant, equipment and staff shortages, labour disputes or any other reason that leads them to default in the performance of their obligations; • ASM will not be able to find replacement counterparties on acceptable terms in the event that counterparties do not perform as ASM expects; • Agreements with counterparties are terminated in accordance with their terms; and • Legal disputes may arise between ASM and counterparties, and ASM may not be able to seek legal redress that it could expect under Australian law against a particular defaulting counterparty. These circumstances may adversely impact ASM’s operations, financial performance and financial position. Metallurgical process risk The production of metals and alloys are dependent on the metallurgical process that is required to produce a saleable product and by nature contain elements of significant risk such as: • identifying a metallurgical process to produce a saleable metal; • developing an economic process route to produce a metal; and • Equipment failures and production delays. These factors may affect the goal of commercialisation of the KMP which could adversely impact financial performance and financial position. Access to services and infrastructure The goal of commercialisation of the KMP requires (and will require in the future) consistent access to: • required services and products (such as power, water and chemical products to process the critical minerals); and • access to road and rail infrastructure to transport consumables, equipment, ore or concentrate between its operations and to customers. Delays in the supplies, or increase in the costs, of the required services and products could have a material adverse effect on ASM’s business. Any event that restricts access to road and rail infrastructure may delay the sale of products to ASM’s customers which could adversely impact ASM’s operations, financial performance and financial position. For personal use only
Page 25
© ASM 2025 | Appendix A – KMP targeted financials assumptions and risks 25 Risk Description Commodity prices The financial performance of the KMP will be influenced by the prices obtained for the rare earth and critical mineral products consumed and produced by the KMP. Prices for rare earth and critical mineral products are volatile, fluctuate and are impacted by factors including the relationship between global supply and demand for minerals, forward selling by producers, costs of production, geopolitical factors (including trade tensions) and general global economic conditions. Prices for rare earth and critical mineral products are also affected by changing consumer trends (see ‘Changing consumer trends’ risk factor below). These factors may have an adverse effect on ASM’s commercialisation of the KMP, as well as its ability to fund its future activities. Legislative changes ASM is subject to various laws and regulations in South Korea including, but not limited to, development, permit and licence requirements, industrial relations, taxation, environment, land use, royalties, water, occupational health and safety and the COVID 19 pandemic. Changes in any of these or other laws or government policies (including, but not limited to, monetary policies) in South Korea or internationally may impact ASM’s operations, financial performance and financial position. Changing consumer trends Critical minerals technology and consumer trends are evolving rapidly. Products to be produced from the KMP include rare earth metals and alloys that are used in electric vehicles and consumer electronics. Prices for rare earth products have been volatile and have been impacted by geopolitical events. Sales agreements in relation to NdFeB and NdPr metal produced at the KMP have been signed with customers from South Korea, Canada and the United States. ASM is seeking to ramp up production levels to align with demand. However, if there is: • changing demand for the applications for which metals and alloys may be used and/or the advancement of alternative technologies for use in such applications and which do not require the use of metals and alloys or a lesser quantity of metals and alloys; and/or • changes in the sentiment or conditions in the countries and sectors in which ASM and its business / commercial partners sell or intend to sell their products, the current conditions in relation to the KMP may change rapidly, create revenue uncertainty and adversely impact on ASM’s financial performance and growth. Funding The Company’s plans for the KMP are contingent upon securing adequate funding. There is no certainty that the required funding will be obtained on favourable terms, or at all. The inability to secure sufficient funding may result in the delay, reduction, or suspension of the KMP expansion. This could adversely affect the Company’s financial position, operational performance, and overall business strategy. For personal use only