Slides
Page 1
WITH A DOMINANT 100% OWNED PATERSON PROVINCE LANDHOLDING FEATURING THE STAND-ALONE MINYARI DOME GOLD-COPPER DEVELOPMENT PROJECT ASX: AZY | August 2026
Page 2
Nature of this document: The purpose of this document is to provide general information about Antipa Minerals Limited (the Company). Unless otherwise stated herein, the information in this document is based on the Company’s own information and estimates. In viewing this document, you agree to be bound by the following terms and conditions. Not an offer: This document is for information purposes only and does not constitute or form any part of any offer or invitation to sell or issue, or any solicitation of any offer to purchase or subscribe for, any securities in the Company in any jurisdiction, including the United States. This document and its contents must not be distributed, transmitted or viewed by any person in any jurisdiction where the distribution, transmission or viewing of this document would be unlawful under the securities or other laws of that or any other jurisdiction. In particular, this document is not for release to US newswire services or distribution in the United States. This document is not considered a recommendation by the Company or any of its affiliates, directors or officers that any recipient invest in the Company nor does it constitute investment, accounting, financial, legal or tax advice. Not f inancial product advice: This document does not take into account the individual investment objectives, financial situation and particular needs of each of the Company’s Shareholders. You may wish to seek independent financial and taxation advice before making any decision in respect of this document. Neither the Company nor any of its related bodies corporate is licensed to provide financial product advice in respect of the Company’s securities or any other financial products. Forward-looking statements: Certain statements contained in this document, including information as to the future financial or operating performance of the Company and its projects, are forward-looking statements. Such -looking statements: (a) are necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Company, are inherently subject to significant technical, business, economic, competitive, political and social uncertainties and contingencies; (b) involve known and unknown risks and uncertainties that could cause actual events or results to differ materially from estimated or anticipated events or results reflected in such forward-looking statements; and (c) may include, among other things, statements regarding estimates and assumptions in respect of prices, costs, results and capital expenditure, and are or may be based on assumptions and estimates related to future technical, economic, market, political, social and other conditions. The C ompany disclaims any intent or obligation to publicly update any forward-looking statements, whether as a result of new information, future events or results or otherwise. The words “believe”, “expect”, “anticipate”, “indicate”, “contemplate”, “target”, “plan”, “intends”, “continue”, “budget”, “estimate”, “may”, “will”, “schedule” and similar expressions identify forward-looking statements. All forward-looking statements contained in this document are qualified by the foregoing cautionary statements. Recipients are cautioned that forward-looking statements are not guarantees of future performance and accordingly recipients are cautioned not to put undue reliance on forward-looking statements due to the inherent uncertainty therein. Disclaimer: N o representation or warranty, express or implied, is made by the Company that the material contained in this document will be achieved or prove to be correct. Except for statutory liability which cannot be excluded, each of the Company, its directors, officers, employees, advisers and agents expressly disclaims any responsibility for the accuracy, fairness, sufficiency or completeness of the material contained in this document, or any opinions or beliefs contained in this document, and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this document or any error or omission there from. The Company is under no obligation to update or keep current the information contained in this document or to correct any inaccuracy or omission which may become apparent, or to furnish any person with any further information, unless required to do so by law. Any opinions expressed in the document are subject to change without notice. Recipients of this document should make their own, independent investigation and assessment of the Company, its business, assets and liabilities, prospects and profits and losses, as well as the matters covered in t his document. Independent expert advice should be sought before any decision based on an assessment of the Company is made. Unverified i nformation: This document may contain information (including information derived from publicly available sources) that has not been independently verified by the Company. Cautionary no te regarding reserves and resources: You should be aware that as an Australian company with securities listed on the ASX, the Company is required to report reserves and resources in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code, 2012 Edition). You should note that while the Company’s reserve and resource estimates comply with the JORC Code, they may not comply with the relevant guidelines in other countries and, in particular, do not comply with Industry Guide 7, which governs disclosures of mineral reserves in registration statements filed with the US Securities and Exchange Commission. Information contained in this document describing the Company’s mineral deposits may not be comparable to similar information made public by companies subject to the reporting and disclosure requirements of US securities laws. In particular, Industry Guide 7 does not recognise classifications other than proven and probable reserves and, as a result, the SEC generally does not permit mining companies to disclose their mineral resources in SEC filings. You should not assume that quantities reported as “resources” will be converted to reserves under the JORC Code or any other reporting regime or that the Company w ill be able to legally and economically extract them. Competent P ersons Statement - Exploration Results: Please refer to the detailed statement at the end of this document. Competent Persons Statement - Mineral Resource Estimations: for the Minyari Dome Deposits, Tim’s Dome Deposit, Chicken Ranch Deposit and RPS Deposit: Please refer to detailed statement at end of this document. Australian Dollars: All figures in Australian Dollars unless stated otherwise. Release Authorised by: Roger Mason - Managing Director and CEO. INVESTOR PRESENTATION | 2 Refer to Antipa Minerals ASX release 24 October 2024 “Minyari Scoping Study Update Confirms Development Potential ”, for full Scoping Study details. Antipa Minerals confirms that it is not aware of any new information or data that materially affects the information included in that release. All material assumptions and technical parameters underpinn ing that release continue to apply and have not materially changed. DISCLAIMER
Page 3
INVESTOR PRESENTATION | 3 ANTIPA MINERALS ACKNOWLEDGES THE TRADITIONAL CUSTODIANS OF COUNTRY THROUGHOUT AUSTRALIA AND THEIR CONNECTIONS TO LAND, SEA AND COMMUNITY WE PAY OUR RESPECTS TO THEIR ELDERS PAST AND PRESENT, EXTENDING THAT RESPECT TO ALL ABORIGINAL AND TORRES STRAIT ISLANDER PEOPLES TODAY
Page 4
MASSIVE 4,500 KM2 PACKAGE Tier One Province Scale Proximal to the Telfer mine and Havieron and Winu development projects A$1.8B GOLD DEVELOPMENT OPPORTUNITY 2024 Scoping Study NPV7% A$1.8B post-tax at A$ 5,000 /oz gold1 2.9 MOZ GOLD MINERAL RESOURCE Large growth potential Plus 91,000 t of copper, and 880 koz of silver 1. Refer M inyari Dome Scoping Study Update dated 24 October 2024 completed to ±35% level of accuracy. The Scoping Study ‘Base Case’ assumed a gold price of A$3,000/oz and detailed upside potential to a maximum gold price of A$5,000/oz – See slides 41 and 42. 2. Cash at b ank was A$39.1M at 30 June 2026. 3. Telfer, H avieron and O’Callaghans refer to Greatland Resources Ltd ASX release dated 30 March 2026, “December 2025 Group Mineral Resource Statement”. Winu refer to Rio Tinto Ltd ASX release dated 22 February 2023, “Changes to Ore Reserves and Mineral Resources”. Nifty refer to Cyprium Metals Ltd ASX release dated 14 March 2024, “Updated Nifty MRE Reaches 1M Tonnes Contained Copper”. Calibre refer to Antipa release dated 26 August 2024, “Calibre Gold Resource Increases 19% to 2.5 Moz - Citadel JV”. Magnum refer to Antipa release dated 23 February 2015, “Calibre and Magnum Deposit Mineral Resource JORC 2012 Updates”. MA JOR DRILLING PROGRAMME SET FOR CY2026 Minyari Dome and more Unlocking new mineral systems across Antipa’s wholly-owned land package A$39M CASH FOUNDATION Multifaceted Strategy Strong balance sheet enables rapid project growth and advancement2 LARGE-SCALE NEW DISCOVERY POTENTIAL Blue sky potential Greenfield and brownfield opportunities to grow Resource base 4
Page 5
INVESTOR PRESENTATION | 5 APPROXIMATELY 40% OF ANTIPA TENEMENTS ARE UNDER LESS THAN 20 METRES OF COVER APPROXIMATELY 75% OF ANTIPA TENEMENTS ARE UNDER LESS THAN 80 METRES OF COVER 1. Telfer, Havieron and O’Callaghans refer to Greatland Resources Ltd ASX release dated 30 March 2026, “December 2 025 Group Mineral Resource Statement”. Winu refer to Rio Tinto Ltd ASX release dated 22 February 2023, “Changes to Ore Reserves and Mineral Resources”. Nifty refer to Cyprium Metals Ltd ASX release dated 14 March 2024, “Updated Nifty MRE Reaches 1M Tonnes Contained Copper”. Calibre refer to Antipa release dated 26 August 2024, “Calibre Gold Resource Increases 19% to 2.5 Moz - Citadel JV”. Magnum refer to Antipa release dated 23 February 2015, “Calibre and Magnum Deposit Mineral Resource JORC 2012 Updates ”. SHALLOW YOUNG COVER ACROSS A LARGE 4,500km2 PORTFOLIO1
Page 6
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 INVESTOR PRESENTATION | 6 1. For full Mineral Resource Estimate details, including gold equivalent calculations, refer to Antipa release dated 2 April 2026, “Minyari Development Resource Grows to 3.6 Moz Gold Equivalent”. Antipa Minerals confirms that it is not aware of any new information or data that materially affects the information included in that release. All material assumptions and technical parameters underpinning that release continue to apply and have not materially changed. CURRENT RESOURCE 2.9 MOZ GOLD 3.6 MOZ GOLD EQUIV.NOVEMBER 2017 723 koz Au 903 koz AuEq MAY 2019 827 koz Au 1,007 koz AuEq MAY 2022 1,853 koz Au 2,298 koz AuEq SEPTEMBER 2024 2,424 koz Au 3,040 koz AuEq MAY 2025 2,520 koz Au 3,083 koz AuEq TOTAL RESOURCE GROWTH OVER TIME Gold-only Resource AuEq Resource DECEMBER 2025 2,700 koz Au 3,336 koz AuEq Minyari Dome MRE, the basis of the ongoing Pre-Feasibility Study: 51Mt at 1.54 g/t gold containing 2.5 Moz of gold or 3.2 Moz AuEq
Page 7
5.6 5.1 3.3 2.6 2.0 1.9 1.8 1.6 1.5 1.3 1.3 1.1 1.1 1.0 1.0 Youanmi Dalgaranga Ravensthorpe Havieron Kal East Gum Creek Lady Julie Roe Yandal Minyari Rebecca Katanning Mt York Mandilla Bullabulling 7.0 6.2 2.9 2.6 2.6 2.4 2.3 2.2 2.2 2.1 1.8 1.7 1.4 1.4 1.1 0.4 Havieron Bullabulling Minyari Central Tanami Dalgaranga Katanning Gum Creek Lady Julie Youanmi Mt York Roe Mandilla Kal East Rebecca Ravensthorpe Yandal INVESTOR PRESENTATION | 7 A GROWING, NEAR SURFACE MINERAL RESOURCE BASE IN COMBINATION WITH COMPELLING GOLD GRADE STAND-ALONE MINYARI DOME GOLD-COPPER DEVELOPMENT PROJECT RESOURCE BASE RESOURCE GRADE (g/t GOLD)GOLD-ONLY CONTAINED RESOURCE (Moz GOLD) * Note that the gold-only resource shown for Central Tanami is inclusive of a 1 Moz historical (JORC 2004) Mineral Resource estimate. 3 SUBJECT OF RECENT CORPORATE ACTIVITY 4 5 7 * Refer to slide 40 for full gold project Resource details and all footnotes (1 to 7) which include references to highlighted recent corporate activity. 6
Page 8
CY2025 results delivered both extensional success a cross multiple zones and multiple new discoveries CY2026 targeting expansion of the existing near- su rface Minyari Dome Mineral Resource to further enhance the development opportunity Focus on extending the resources down dip and/or alo ng strike at Fiama, Minella, Rizzo, GEO-01 Main Zone, WACA and satellite deposits including Tim’s Dome Maiden resource opportunities include a new di scovery 65m north of Fiama and Judes
Page 10
1. Refer M inyari Dome Scoping Study Update dated 24 October 2024 completed to ±35% level of accuracy. The Scoping Study ‘Base Case’ assumed a gold price of A$3,000/oz and detailed upside potential to a maximum gold price of A$5,000/oz – See slides 41 and 42. 2. Antipa’s M inyari Project MRE, i.e. includes Antipa’s Satellite Deposits 380koz gold Mineral Resources Estimate (April 2026). See Appendix for MRE statement and full references. EXCEPTIONAL DEVELOPMENT POTENTIAL CONFIRMED1 COPPER UPSIDE INVESTOR PRESENTATION | 10 STAND-ALONE MINYARI DOME GOLD DEVELOPMENT PROJECT A$1.8 B NPV7% Post-tax at A$ 5,000 / oz gold 110% IRR Post-tax at A$ 5,000 / oz gold 130 KOZ Annual Production 1.3Moz Au for the first 10 years 1.3 MOZ Gold output 30.2 Mt at 1.5 g/t Au open pit and underground mine 3 MTPA Throughput For 10+ years initial processing life A$306 M Capital Cost Including A$ 90M pre-production mining 2.2 MOZ Gold at 1.6 g/t Indicated Resource2 2.9 MOZ Contained gold only resource2
Page 11
INVESTOR PRESENTATION | 11 MINYARI DOME DEVELOPMENT FREE CASH FLOW 139 151 170 110 132 126 117 127 106 78 18 250 226 228 191 230 222 210 224 198 156 30 362 270 318 271 328 318 304 321 289 234 41 1 2 3 4 5 6 7 8 9 10 11 PROJECTED ANNUAL FREE CASH FLOWS AT VARIOUS GOLD PRICE FORECASTS (POST-TAX, A$M)1 1. Refer Minyari Dome Scoping Study Update dated 24 October 2024 completed to ±35% level of accuracy. The Scoping Study ‘Base Case’ assumed a gold price of A$3,000/oz and detailed upside potential to a ma ximum gold price of A$5,000/oz – See slides 41 and 42. LOM FREE CASH FLOW (POST-TAX) Gold price (per oz) LoM FCF (million) A$3,000 A$972 A$4,000 A$1,860 A$5,000 A$2,760 Year
Page 12
Highly experienced Study, Geology and Environment team Completion of multiple 2025 drilling programmes s upported PFS Mineral Resource Estimate, sterilisation drilling, geotechnical design Leading industry consultants completing P FS workstreams Metallurgical test-wo rk completed with probable flowsheet involving CIL gold doré production followed by cyanide leach residue flotation to produce a separate copper concentrate Mine planning, process plant engineering, and non-p rocessing infrastructure development Detailed definition of Project approval pathway a nd development of a structured approvals strategy and schedule Environmental and water studies t o support permitting Active engagement with Traditional Owners t o establish a clear pathway for Native Title Mining Agreement and heritage approvals Early engagement of debt advisor t o ensure PFS outputs align with debt market requirements INVESTOR PRESENTATION | 12 ADVANCING THE STAND-ALONE MINYARI DOME GOLD-COPPER DEVELOPMENT PROJECT TOWARD FID PRE-FEASIBILITY STUDY1 CRITICAL WORKSTREAMS MATERIALLY ADVANCED2 PFSPFS 1. Refer to Antipa release dated 7 July 2026, “PFS Test-work Confirms Gold-Copper Processing”. 2. Exploration programmes and development studies are subject to changes which may be made consequent upon results, field condit ions and ongoing review.
Page 13
INVESTOR PRESENTATION | 13 1. This schedule should be regarded as conceptual in nature, as it is subject to future events and risks, including factors beyond the Company’s control that may affect target timelines. CY26 CY27 CY28 CY29 CY30 Technical Deliverables1 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Pre-Feasibility Study Definitive Feasibility Study (incl. Supporting Works) FEED/Long Lead Items Construction/ Commissioning Key Approval Workstreams Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Heritage Negotiations Environmental and Heritage Surveys EPA Part IV EPBC Target First Gold FID FIRST GOLD ± COPPER
Page 15
INVESTOR PRESENTATION | 15 Phase 1 Drilling Programme focused on testing priority resource growth and greenfield targets and existing prospects proximate to Minyari Dome commenced - 41,000m of RC, diamond core and air core drilling – 201 drill holes for 22,440m completed1 New shallow high-grade lode discovered 65m north of Fiama: 24.7m at 1.4 g/t gold and 0.07% copper open in all directions New gold-copper discovery south of Rizzo and Fiama: Discovery plus broader target covers a 1km x 700m area Tims Dome extended to a strike length of 3.5km and 300 to 600m across strike, with multiple new gold-targets identified: Potential for new discoveries and gold resource growth AL01 multiple large gold-copper air core anomalies 17km north of Minyari: Combined strike of four kilometres which remain open in most directions, potential for new discoveries Mollie large-scale base and precious metal skarn geophysical target: Conceptual analogue the nearby O’Callaghan’s skarn tungsten and base metal deposit 1. Exploration p rogrammes and development studies are subject to changes which may be made consequent upon results, field conditions and ongoing review. 2. Telfer and Havieron refer to Greatland Resources Ltd ASX release dated 30 March 2026, “December 2025 Group Mineral Resource Statement”.
Page 16
INVESTOR PRESENTATION | 16 TIMS DOME HIGH-GRADE GOLD±COPPER REEF TARGETS LARGE-SCALE HIGH-GRADE GOLD ± COPPER TARGET1 2. Historical production from the Telfer gold -copper system, as set out in Newcrest Mining Limited’s Telfer Technical Report (20 13), totals approximately 5Moz of gold from the oxidised and leached cap mined by open -pit methods, plus ~1Moz from sulphide ore mined underground. Tim’s Dome 110koz gold resource with growth and discovery potential located just 11km from Telfer Northwest strike continuation of Telfer host rocks and Telfer domal fold structure Shallow cover between 1 to 10m Gold ± copper mineralisation along 4.7km of strike along the domal fold axis and fold limbs Aerial electromagnetic bedding parallel conductivity anomaly along 1km of strike within Telfer Middle Vale Reef (MVR) host rock: Telfer Reefs +5Moz gold production 2 Gold anomalies generated by 2025 air core drilling being tested by Phase 1 CY2026 RC drilling Resource growth along strike and down dip to be tested by Phase 1 CY2026 RC drilling Satellite open pit opportunity 30km southwest of standalone Minyari gold-copper development project 1. Exploration programmes and development studies are subject to changes which may be made consequent u pon results, field conditions and ongoing review.
Page 17
INVESTOR PRESENTATION | 17 TIMS DOME HIGH-GRADE GOLD±COPPER REEF TARGETS TIM’S DOME FIRMED-UP AS A PRIORITY TELFER-STYLE REEF TARGET1 Thick gold-copper-lead-silver mineralisation intersected in the two deepest Phase 1 CY2026 RC holes drilled to date over approximately 500m of strike and remains open Maximum 1m RC grades returned from Phase 1 CY2026 drilling include 6.31 g/t gold, 1.33% copper, 1.84% lead and 2.27 g/t silver Mineralisation directly above large, untested reef style, bedding parallel AEM conductor measuring approximately 1.2km long and between 200m and 470m wide AEM Conductor lies 50m to 100m beneath current drilling and recent results firm this as a priority target for immediate follow-up Presence of lead mineralisation represents an important distal signature for an intrusion-related, Telfer-style mineral system RC programme expanded Testing with diamond tails of RC holes is scheduled to commence by mid-August WA Government $180k EIS grant to co-fund drilling 1. Exploration programmes and development studies are subject to changes which may be made consequent upon results, field condit i ons and ongoing review. 26XTDC0051 = 22m at 0.9 g/t gold and 0.14% copper from 157m, including 3m at 4.4 g/t gold and 0.05% copper from 171m, in quartz-sulphide veined silicified and sericite altered meta-sediments
Page 18
INVESTOR PRESENTATION | 18 TIMS DOME HIGH-GRADE GOLD±COPPER REEF TARGETS TIM’S DOME FIRMED-UP AS A PRIORITY TELFER-STYLE REEF TARGET – SW-NE CROSS SECTION LOCAL 28,315 NORTH AEM Conductivity Target
Page 19
A VERY LARGE-SCALE AIR CORE GOLD TARGET1 INVESTOR PRESENTATION | 19 Located 17km north of Minyari Multiple large AL01 gold-copper anomalies, with a combined strike of 4km – Anomalies remain open in most directions Meta-sediment and dolerite hosted gold and pathfinder anomaly: Extensive mineral system pathfinder anomalism, including Cu, Co, Bi, Te, Mo, Pb and Zn Cover ranging from 1 to 65m Magnetics folded dolerite sill and meta-sediments Pre-2026 AL01 air core drill testing is broad spaced due to limited heritage survey lines: New heritage survey completed July 2025 Follow-up air core drilling completed as part of the Phase 1 CY2026 programme: 70 air core holes completed Assays received for 35 holes define 2km long gold ± copper anomaly - Including shallow low-grade gold mineralisation Follow-up RC drilling planned 1. Exploration programmes and development studies are subject to changes which may be made consequent upon results, field conditions and ongoing review. MINYARI DEPOSIT AREA: AL01 TARGET
Page 20
INVESTOR PRESENTATION | 20 MINYARI DOME RESOURCE AREA MINYARI DOME LONG SECTION LOOKING WEST SIGNIFICANT DEPOSITS WITH MULTIPLE RESOURCE EXTENSION TARGETS
Page 21
INVESTOR PRESENTATION | 21 IDENTIFIED AT MINYARI DOME AND THE BROADER SATELLITE DEPOSITS TIMS DOME – 25KM TO MINYARI CHICKEN RANCH – 30KM TO MINYARI MULTIPLE RESOURCE EXTENSION TARGETS ZOOMED OUT MINYARI AND GEO-01 VIEW
Page 22
MRE: 1.9 MOZ GOLD, 69 KT COPPER, 579 KOZ SILVER AND 11 KT COBALT INVESTOR PRESENTATION | 22 Outstanding high-grade gold + copper-silver-cobalt mineralisation: 154 metres at 2.1 g/t gold and 0.1% copper from 9m in 16MYC0045 142 metres at 1.9 g/t gold and 0.2% copper from 294m in 21MYCD0200 35 metres at 3.5 g/t gold and 0.5% copper from 20m in 21MYC0272 230m at 1.5 g/t gold and 0.19% copper from 230m in 21MYCD0216W1, including: 25m at 4.4 g/t gold and 0.35% copper from 272m 86m at 1.7 g/t gold and 0.41% copper from 121m in 24MYD0533, including: 28m at 4.0 g/t gold, 1.0% copper, 3.0 g/t silver and 0.10% cobalt from 124m 51m at 2.7 g/t gold, 0.39% copper and 1.0 g/t silver from 396m in 24MYD0533, including: 22m at 4.9 g/t gold, 0.75% copper and 2.1 g/t silver from 418m 75.6m at 1.6 g/t gold and 0.10% copper from surface to EoH in 24MYD0534, including: 14m at 6.8 g/t gold, 0.40% copper and 1.2 g/t silver from 15m Orebody begins at surface with a max 15 metres of sand cover MINYARI DEPOSIT AREA: MINYARI 300 metres
Page 23
INVESTOR PRESENTATION | 23 Large 1km by 800m gold-copper footprint Gold ± copper mineralisation remains open in several directions and at multiple deposits CY2025 drilling in this area returned: Shallow, bonanza-grade gold at Fiama High-grade gold extensions down dip ± along strike at Fiama, Minella and GEO-01 Main Zone A discovery of extensive shallow high-grade gold- copper mineralisation south of Rizzo-Fiama Large areas being followed-up for extensions to strike and depth as part of the CY2026 drill programme Resource growth expected from CY2026 follow- up drilling1 GEO-01 DEPOSIT AREA: KEY TARGET AREAS FEATURING DEPOSITS AT THE GEO-01 MAIN ZONE, CENTRAL, MINELLA, FIAMA, RIZZO, AND SURROUNDS CURRENT MRE STAND AT 295KOZ OF GOLD WITH SUBSTANTIAL RESOURCE GROWTH UPSIDE1 1. Exploration programmes and development studies are subject to changes which may be made consequent upon results, field condit i ons and ongoing review. 1km
Page 24
INVESTOR PRESENTATION | 24 Bonanza gold drill intersections up to 520 gram-metres in extremely high- grade zones. Mineralisation remains open in multiple directions, with significant intercepts including: 33m at 15.8 g/t gold and 0.28% copper from 96m in 25MYC0798, including: 1m at 41.6 g/t gold from 114m 3m at 150.0 g/t gold from 123m, also including: 1m at 395.0 g/t gold from 124m 23m at 7.1 g/t gold and 0.07% copper from 125m in 25MYC0799, including: 2m at 62.0 g/t gold and 0.08% copper from 128m, also including: 1m at 97.5 g/t gold and 0.09% copper from 128m 53m at 1.9 g/t gold and 0.08% copper from 233m in 25MYC0873, including: 7m at 6.5 g/t gold and 0.17% copper from 274 32m at 2.4 g/t gold from 140m in 24MYC0470, including: 4m at 8.9 g/t gold from 140m 16m at 3.8 g/t gold and 0.09% copper from 113m in 24MYC0632, including: 2m at 25.4 g/t gold and 0.21% copper from 120m 10m at 3.1 g/t gold and 0.06% copper from 149m in 25MYC0707, including: 1m at 23.4 g/t gold and 0.06% copper from 151m GEO-01 DEPOSIT AREA: FIAMA CURRENT MRE OF 130 KOZ OF GOLD WITH MA JOR UPSIDE1 1. Exploration programmes and development studies are subject to changes which may be made consequent upon results, field condit i ons and ongoing review.
Page 25
INVESTOR PRESENTATION | 25 GEO-1 DEPOSIT AREA: FIAMA NORTH DISCOVERY MAIDEN RESOURCE OPPORTUNITY IDENTIFIED IN PFS DRILLING1 1. Exploration programmes and development studies are subject to changes which may be made consequent upon results, field condit ions and ongoing review. Recent new gold ± co pper discovery, located just 65m north of Fiama Mineralisation exists beneath shallow cover of less than 5m Mineralisation remains open in multiple directions, with significant intercepts including: 24.7m at 1.4 g/t gold and 0.07% copper from 39.3m in 25MYDG033, including: 2.3m at 6.8 g/t gold and 0.18% copper from 39.3m 22m at 0.9 g/t gold and 0.23% copper from 135m in 26XMDC0961 10m at 1.3 g/t gold and 0.22% copper from 147m in 26XMDC0963, including: 6m at 1.8 g/t gold and 0.24% copper from 150m 31m at 0.6 g/t gold and 0.04% copper from 69m in 26XMDC0958, including: 16m at 1.0 g/t gold and 0.06% copper from 84m 17m at 0.5 g/t gold and 0.07% copper from 80m in 25MYDG033 Recent follow up drilling confirms further growth opportunity adjacent to the Fiama resource
Page 26
INVESTOR PRESENTATION | 26 NEW GOLD ± COPPER DISCOVERY SOUTH OF RIZZO AND FIAMA1 1. Exploration programmes and development studies are subject to changes which may be made consequent upon results, field condit ions and ongoing review. GEO-01 DEPOSIT AREA: NEW RIZZO-FIAMA EXTENSION Located 1.7km south of Minyari Open s a large 1km metre by 700m target area hosting three ore horizons under less than 5m of cover To date, limited, broad spaced CY2025 drilling has been completed Drill intersections include: 31m at 1.4 g/t gold and 0.04% copper from 32m in 25MYC0715, including: 1m at 39.8 g/t gold, 0.04% copper and 1.1 g/t silver from 46m 6m at 4.1 g/t gold from 174m in 25MYC0854, including: 2m at 11.6 g/t gold and 1.1 g/t silver from 174m 5m at 2.1 g/t gold from 109m in 26XMDC0975, including: 1m at 9.4 g/t gold from 109m 12m at 1.3 g/t gold and 0.08% copper from 141m in 26XMDC0979, including: 5m at 2.9 g/t gold 0.14% copper from 142m 49m at 0.4 g/t gold and 0.17% copper from 14m in 25MYC0750, including: 4m at 2.0 g/t gold and 0.21% copper from 45m 4m at 2.1 g/t gold and 0.09% copper from 90m in 25MYC0859 Multiple untested targets receiving follow-up drill testing in CY2026
Page 27
INVESTOR PRESENTATION | 27 GEO-01 DEPOSIT AREA: MINELLA CURRENT MRE: 29 KOZ OF GOLD WITH GROWTH EXPECTED1 1. Exploration programmes and development studies are subject to changes which may be made consequent upon results, field condit ions and ongoing review. CY2025 drilling extended gold-copper mineralisation from 100 to 240 vertical metres below the surface and 130m along strike to the west Significant near-surface gold mineralisation: 67m at 1.1 g/t gold and 0.33% copper from 159m in 25MYC0805, including: 23m at 2.4 g/t gold and 0.65% copper from 200m 40m at 1.0 g/t gold and 0.13% copper from 26m in 24MYC0622, including: 17m at 2.2 g/t gold and 0.25% copper from 140m 27m at 1.0 g/t gold and 0.16% copper from 51m in 24MYC0623 72m at 0.5 g/t gold and 0.08% copper from 120m in 25MYC0809, including: 13m at 1.3 g/t gold and 0.18% copper from 173m 13m at 0.4 g/t gold and 0.06% copper from 210m down hole in 24MYC0478 (extension), including: 1m at 2.9 g/t gold and 0.23% copper from 216m down hole 44m at 0.4 g/t gold and 0.06% copper from 82m in 25MYC0745 Multiple zones of high-grade mineralisation under just 3 to 16m of cover remain open in several directions at both Fiama and Minella
Page 28
INVESTOR PRESENTATION | 28 GEO-01 DEPOSIT AREA: MAIN ZONE MRE: 120 KOZ OF GOLD – GROWTH EXPECTED1 Multiple si gnificant zones of high -grade gold mineralisation under 3 to 6m of sand cover: 35m at 3.0 g/t gold from 20m in 24MYC0610, including: 16m at 5.6 g/t gold from 33m 50m at 2.3 g/t gold from 72m in 23MYC0383, including: 19m at 5.0 g/t gold from 89m 20m at 2.4 g/t gold from 114m in 24MYC0442, including: 83.6m at 1.0 g/t gold from 4m in 24MYD0535 68m at 1.4 g/t gold from 68m in 23MYC0383, including: 36m at 2.6 g/t gold from 72m 77.6m at 1.3 g/t gold from 87m in 24MYD0536, including: 11m at 3.3 g/t gold from 93m Open down plunge, step out drill hole 25MYD0554 extended mineralisation 450m down dip: 24m at 1.1 g/t gold and 0.05% copper from 804m, including: 3m at 2.8 g/t gold and 0.14% copper from 810m 30m at 0.7 g/t gold and 0.07% copper from 677m, including: 3.2m at 3.9 g/t gold and 0.50% copper from 699m Follow-up drill testing aimed at delivering resource growth in CY2026 1. Exploration programmes and development studies are subject to changes which may be made consequent upon results, field condit ions and ongoing review.
Page 29
INVESTOR PRESENTATION | 29 MOLLIE LARGE-SCALE BASE METAL AND GOLD TARGET NEW VERY LARGE-SCALE BASE METAL (INCLUDING TUNGSTEN + COPPER ) AND GOLD SKARN TARGET1 1. Exploration programmes and development studies are subject to changes which may be made consequent upon results, field conditions and ongoing review. Mollie base ± tungsten and precious metal skarn target located 30km from Telfer Shallow cover between 3 to 60m Large-scale strong co-incident magnetic- gravity high anomaly: 1.2km by 1.8km in size Modelled depth 400m below surface Intersection of ENE fault and NW anticlinal fold axis in favourable Malu and/or Isdell Formation calcareous meta-sediments Grace gold-copper breccia deposit and 200koz gold resource 6km NW along strike 25km from the O’Callaghan’s skarn deposit one of the largest high-grade tungsten deposits globally and Australia's largest tungsten resource Limited historic drilling failed to reach magnetic source (max depth 130m) returning 4m at 0.12 g/t and 3m at 0.14 g/t gold above the magnetic target WA Government $220k EIS grant to co-fund diamond core drilling
Page 30
INVESTOR PRESENTATION | 30 NEW YOLANDA COPPER DISCOVERY A VERY LARGE-SCALE COPPER TARGET1 1. Exploration programmes and development studies are subject to changes which may be made consequent upon results, field conditions and ongoing review. New copper discovery just 1km west of WACA Aerial electromagnetic conductivity anomaly Shallow cover between 4 to 10m Nine very broad spaced RC drill holes defined a 1.2km long by 220m wide copper anomaly, with several holes ending in +0.10% copper Discovery drill hole intersections included: 44m at 0.07% copper from 40m to EOH in 25MYC0948, including: 12m at 0.13% copper from 72m to EOH 8m at 0.10% copper from 76m to EOH (25MYC0946) Copper anomaly remains open along strike and to the east and is being evaluated by Phase 1 CY2026 drilling: 7 RC holes returned anomalous copper 33 air core holes completed along 5km of Yolanda structural trend – Assays Pending
Page 31
INVESTOR PRESENTATION | 31 Jezabeel: Surface geochemical and RAB / air core gold anomaly Located just 4km northeast of Greatland Resources’ Telfer 22 Mtpa plant Very large 3km long by up to 1.3km wide: Peak lag result 0.21 g/t gold, with the anomaly open in several directions Limited historic RAB / air core drilling, previous intersections up to 4m at 0.13 g/t gold Favourable gold mineralisation anticlinal trap site situated on NE trending structure intersecting Telfer and Parklands NW trend hosts the Thomson’s Dome and Thomson’s Dome East gold deposits Shallow cover of less than 30m Planned for testing during the CY2026 drilling programme 2 Parklands: Surface geochemical gold anomaly Very large 3km long by up to 1.5km wide - Peak lag result 1.52 g/t gold 10km northeast Telfer Extensive Chicken Ranch-Triangle NW-SE gold trend Phase 1 RC drilling (20 holes for 3,361m) returned limited low-grade gold ± copper mineralisation, including: 4m at 0.11 g/t gold and 8m at 0.05% copper Shallow cover average depth 23m Any further drilling contingent on further integrated interpretation2 1. Telfer gold and copper metal values are pre-mining totals based on historical production data (i.e. these values are not current JORC Mineral Resource). 2. Exploration programmes and development studies are subject to changes which may be made consequent upon results, field condit ions and ongoing review. TELFER AREA: JEZABEEL AND PARKLANDS TWO VERY-LARGE GREENFIELD SURFACE GEOCHEMICAL GOLD ANOMALIES LESS THAN 10KM FROM TELFER1
Page 32
MRE: 230 KOZ OF GOLD – GROWTH EXPECTED1 INVESTOR PRESENTATION | 32 Located 35km north of Minyari, with mineralisation under shallow cover (10 to 23m) Drilling has defined a 2km long by up to 250-metre-wide corridor hosting significant gold-copper-silver-tungsten mineralisation including high-grade: Possible plunging fold nose / breccia pipe target areas e.g. Poblano Broad spaced drilling with holes 200m to 800m apart Key intersections include: 88m at 0.7 g/t gold and 0.09% copper from 52m in 25EPC0036, including: 32m at 1.5 g/t gold, 0.18% copper and 1.2 g/t silver 4m at 8.1 g/t gold and 0.23% copper from 194m in 19EPC0020, including: 1m at 27.4 g/t gold, 0.51% copper and 2.35 g/t silver 15m at 0.90 g/t gold from 112m in 25EPC0050 12m at 0.90 g/t gold, 0.24% copper from 165m in 19EPC0028, including: 6m at 1.40 g/t gold, 0.31% copper and 1.66 g/t silver 36m at 0.5 g/t gold from 68m in 25MYA0449 24m at 0.6 g/t gold and 0.07% copper from 208m in 25EPC0037, including: 8m at 1.6 g/t gold Mineralisation remains open in most directions, providing resource growth potential through future follow-up drilling 1. Exploration programmes and development studies are subject to changes which may be made consequent upon results, field condit ions and ongoing review. REAPER-POBLANO-SERRANO (RPS) TARGET
Page 33
INVESTOR PRESENTATION | 33 TIER-ONE GROUND PACKAGE PROXIMAL TO THE TELFER MINE AND HAVIERON AND WINU DEVELOPMENT PROJECTS OUTSTANDING GOLD MINING LOCATION Province scale 4,500km2 portfolio Paterson region activity has heated up ~20 Moz of gold and 3.4 Mt of copper discovered in last nine years Western Australia is a low-risk, mining- friendly jurisdiction EXPLORATION PRESENTING SIZEABLE POTENTIAL FOR FURTHER RESOURCE EXPANSION AND DISCOVERY MULTIPLE GROWTH TARGETS Minyari is a proven development o pportunity with exceptional economics and further upside potential 3.6 Moz gold equivalent Mineral Resource Aggressive CY2026 drill programme t argeting resource growth and major discoveries Multi-la yered value pathways for growing shareholder value Strong balance sheet enables rapid p roject growth and advancement Fully funded for aggressive growth and discovery drill programmes Support of WA Government via multiple EIS drilling grants Steady flow of exploration news as drilling results become available ROBUST CASH POSITION FUNDING RESOURCE GROWTH, DISCOVERY AND DEVELOPMENT STRATEGY EXCELLENT FINANCIAL FOUNDATION PLAYING A MA JOR ROLE IN THE REGIONS RESURGENCE .
Page 35
INVESTOR PRESENTATION | 35 Share price1 A$0.55 Shares on issue1 664M Market capitalisation1 A$362M Cash2 A$39M Debt Nil EV A$323M Options3 40M SHARE REGISTER AND RESEARCH COVERAGE4CAPITAL STRUCTURE | ASX: AZY 16.3% 6.2% 5.4% 3.6% 2.2% 2.4%22.7% 41.2% Chester Asset Management Greatland Resources Jupiter Asset Management Lion Selection Group IGO Board and Management Institutions and Funds Other 1. At 29 July 2026. 2. C ash at bank was A$39.1M at 30 June 2026. 3. At 29 July 2026, 40.4M options with a weighted average exercise price of A$0.44. 4. As at 15 July 2026, shareholdings may be held directly or through nominees. EXCELLENT FINANCIAL FOUNDATION AND CLEAN CAPITAL STRUCTURE
Page 36
INVESTOR PRESENTATION | 36 Roger Mason Managing Director and CEO Geologist More than 35 years exploration, project development, production and project acquisition experience Director of Caprice Former General Manager Geology for LionOre Australia and Norilsk Nickel Australia Former resources sector consultant Stephen Power Non-Executive Director Corporate Lawyer More than 35 years legal, commercial and corporate management experience Former advisor to LionOre Mining International Peter Buck Non-Executive Director Geologist More than 40 years international exploration, acquisition and production experience Former Director of IGO, PMI Gold, Gallery Gold, LionOre Australia and Breakaway Resources Gary Johnson Non-Executive Director Metallurgist More than 40 years p lant design, project development and operations experience Director of Strategic Me tallurgy Former Director of L ionOre’s Tati Nickel Luke Watson CFO and Company Secretary Chartered Accountant More than 25 years r esources sector senior corporate and finance experience Former CFO and C ompany Secretary of Mantra Resources Mark Rodda Executive Chairperson Lawyer and Corporate Consultant More than 30 years legal, commercial and corporate management experience Former Chairperson of Coalspur Mines, and former General Counsel of LionOre Mining International HIGHLY EXPERIENCED AND MOTIVATED EXECUTIVE TEAM Neil Warburton Non-Executive Director Mining Engineer More than 45 years op erational, senior leadership, and Board experience Led underground m ining services company Barminco Limited for 6 years Chairperson of Nimy R esources and Belararox
Page 37
MEANINGFUL VALUE CREATION FOR ALL STAKEHOLDERS LOCAL COMMUNITY PARTNERSHIPS ENGAGING LOCAL PEOPLE AND BUSINESSES FOR WIDE-RANGING SOCIAL BENEFIT SOCIALLY INCLUSIVE WORKPLACE COMMITTED TO WORKPLACE DIVERSITY AND EQUAL OPPORTUNITY EMPLOYMENT REGIONAL ECONOMIC DEVELOPMENT EXPLORATION INVESTMENT FOR LONG-TERM REGIONAL ECONOMIC PROSPERITY CULTURAL HERITAGE PROTECTION COLLABORATING WITH TRADITIONAL OWNERS TO PROTECT CULTURAL LANDSCAPES AND HERITAGE INVESTOR PRESENTATION | 37 COMMITTED TO SOCIAL AND ENVIRONMENTAL RESPONSIBILITY
Page 38
APPENDIX
Page 39
INVESTOR PRESENTATION | 39 TIMS DOME HIGH-GRADE GOLD±COPPER REEF TARGETS LARGE-SCALE HIGH-GRADE GOLD ± COPPER TARGET – TIM’S DOME IS TELFER HOST ROCKS AND DOMAL FOLD AXIS
Page 40
INVESTOR PRESENTATION | 40 TIMS DOME HIGH-GRADE GOLD±COPPER REEF TARGETS LARGE-SCALE HIGH-GRADE GOLD ± COPPER TARGET - CONCEPTUAL STRUCTURAL MODEL CROSS-SECTION
Page 41
INVESTOR PRESENTATION | 41 TIMS DOME HIGH-GRADE GOLD±COPPER REEF TARGETS TIM’S DOME FIRMED-UP AS A PRIORITY TELFER-STYLE REEF TARGET – SW-NE CROSS SECTION LOCAL 28,315 NORTH AEM Conductivity Target
Page 42
INVESTOR PRESENTATION | 42 1. Rounding of numbers may cause apparent discrepancies in totals. 2. For full details of the Minyari Project Mineral Resources Estimate, please refer to ASX announcement dated 2 April 2026, “Minyari Project Resource Grows to 3.6 Moz Gold Equivalent ”. 3. The Minyari Dome MRE has been reported within optimised open pit shells at a cut -off grade of 0.3 g/t gold and within optimised (MSO) underground stopes with a Net Smelter Return (NSR) ≥ A$100, using metal prices of US$5,000/oz gold, A$65 silver and AUD/USD of 0.65 and cost and revenue assumptions. 4. The satellite deposits Tim’s Dome, Chicken Ranch and RPS MREs have been reported at cut -off grades above 0.3 g/t gold which assumes open pit mining. 5. The Minyari Project and its Mineral Resource are 100% owned by Antipa Minerals Ltd. MINYARI PROJECT MINERAL RESOURCE ESTIMATE
Page 43
A gold equivalent grade (Aueq) has been calculated from individual gold, copper, silver and cobalt grades. This equivalent grade has been calculated and decl ared in accordance with Clause 50 of the JORC Code (2012) that it is the Company’s opinion that all metals included in this m etal equivalent calculation have reasonable potential to be recovered and sold, using the following parameters: The m etal prices used for the calculation are as follows: − US$ 2,030 per oz gold − US$ 4.06 per lb copper − US$ 24.50 per oz silver − US$ 49,701 per tonne cobalt An e xchange rate (A$:US$) of 0.7000 was assumed. Metallurgical re coveries for by-product metals, based upon Antipa test-work in 2017 and 2018, are assumed as follows: − Gold = 88.0% Copper = 85.0%, Silver = 85%, Cobalt = 68% The g old equivalent formula, based upon the above commodity prices, exchange rate and recoveries, is thus: Aueq = (Au g/t) + (Ag g/t * 0.012) + (Cu % * 1.32) + (Co % * 5.88) INVESTOR PRESENTATION | 43 Competent Persons Statement – Exploration Results The information in this document that relates to Exploration Results is based on and fairly represents information and supporting documentation compiled by Mr Roger Mason, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Mason is a full-time employee of the Company. Mr Mason is the Managing Director of Antipa Minerals Limited, is a substantial shareholder of the Company and is an option holder of the Company. Mr Mason has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements, all of which are available to view on www.antipaminerals.com.au and www.asx.com.au. Mr Mason, whose details are set out above, was the Competent Person in respect of the Exploration Results in these original market announcements. Competent Persons Statement – Mineral Resource Estimations for Minyari, WACA, WACA West and Sundown The information in this document that relates to the estimation and reporting of the Minyari, WACA, WACA West and Sundown deposit Mineral Resources is extracted from the report entitled “Minyari Project Resource Grows to 3.6 Moz Gold Equivalent” created on 2 April 2026 with Competent Person Jane Levett, which is available to view on www.antipaminerals.com.au and www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant original market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements. Competent Persons Statement – Mineral Resource Estimations for Minyari South, Minyari North, GEO-01 Main Zone, Fiama, Minella, GEO-01 Central, Rizzo, GEO-01 South, Tim’s Dome, Chicken Ranch and RPS Deposits The information in this document that relates to the estimation and reporting of the: (1) GEO-01 Main Zone, Fiama, Minella, GEO-01 Central, Rizzo, GEO-01 South and RPS deposit Mineral Resources is extracted from the report entitled “Minyari Project Resource Grows to 3.6 Moz Gold Equivalent” created on 2 April 2026; (2) Minyari South deposit Mineral Resource is extracted from the report entitled “Minyari Development Resource Grows to 3.3Moz Gold Equivalent” created on 18 December 2025; (3) Tim’s Dome and Chicken Ranch deposits Mineral Resources are extracted from the report entitled “Minyari Project Resource Grows by 100 koz to 2.5 Moz of Gold” created on 21 May 2025; and (4) Minyari North deposit Mineral Resource is extracted from the report entitled “100% Owned Minyari Dome Project Grows by 573,000 Oz of Gold” created on 17 September 2024; with Competent Person Victoria Lawns, which are available to view on www.antipaminerals.com.au and www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material a ssumptions and technical parameters underpinning the estimates in the relevant original market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements. Scoping Study for the Minyari Dome The information in this document that relates to the Scoping Study for the Minyari Dome is extracted from the report entitled “Minyari Scoping Study Update Confirms Development Potential” reported on 24 October 2024, which is available to view on www.antipaminerals.com.au and www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the study in the relevant original market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement. GOLD METAL EQUIVALENT: MINYARI DOME MINERAL RESOURCE GOLD EQUIVALENT COMPETENT PERSONS STATEMENTS MINYARI PROJECT MINERAL RESOURCE ESTIMATE
Page 44
INVESTOR PRESENTATION | 44 Various information in this report which relates to Exploration Results have been extracted from the following announcements lodged on the ASX, where further details, including JORC Code reporting tables, can also be found: • North Telfer Project Update on Former NCM Mining Leases 3 December 2015 • High Grade Gold Mineralisation at Minyari Dome 8 February 2016 • Minyari Deposit Drilling to Commence May 2016 2 May 2016 • Minyari Phase 1 Drilling Commences 2 June 2016 • Further Historical High-grade Gold Intersections at Minyari 14 June 2016 • Minyari Phase 1 Drilling Update No. 1 20 July 2016 • Completion of Phase 1 Minyari Deposit RC Drilling Programme 9 August 2016 • Minyari Drilling Update No. 3 17 August 2016 • Minyari Drilling Update No. 4 29 September 2016 • North Telfer and Citadel Exploration Programme Update 16 November 2016 • Minyari Dome Drilling Update No. 1 16 December 2016 • Minyari Dome and Citadel – Phase 2 Update 9 February 2017 • Minyari Dome Positive Metallurgical Test Work Results 13 June 2017 • High-Grade Gold Intersected at North Telfer Project Revised 21 June 2017 • Drilling Extends High-Grade Gold Mineralisation at WACA 25 July 2017 • High-Grade Gold Mineralisation Strike Extension at Minyari Deposit 4 August 2017 • Minyari Dome Phase 1 Final Assay Results 31 August 2017 • Air Core Programme Highlights Minyari and WACA Deposit 5 December 2017 • Minyari Dome 2017 Air Core Drilling Results 29 January 2018 • Minyari Dome – Initial Drill Results August 2018 • Thick High-grade Copper Mineralisation Intersected 2 October 2018 • Chicken Ranch and Minyari Dome Drilling Update 15 November 2018 • Chicken Ranch and Tims Dome Maiden Mineral Resources Boost Antipa 100% Resource to 827000 oz 12 May 2019 • 2019 exploration programme update ‐ 100% Owned Paterson Province Tenure 22 August 2019 • High-grade gold & multiple zones of copper-gold mineralisation identified at 100% owned ground 18 October 2019 • Antipa delivers strong results from multiple prospects on 100% owned ground 22 November 2019 • Multiple New Gold-Copper Targets on 100% Owned Ground 23 December 2019 • Drilling of New Targets Deliver Significant Au Intersections 16 February 2021 • Target Generation Air Core programme extends Poblano mineralised gold zone by 500 metres 5 March 2021 • Wilki JV Project Update – New Targets and 2020 Drill Results 11 March 2021 • High-Grade Gold Intersected at Minyari & WACA Deposits 7 April 2021 • Discovery of Significant Zones of High-Grade Gold at Minyari 15 July 2021 • Further High-Grade Gold Mineralisation at Minyari Deposit 20 July 2021 • Further High-Grade Gold Results at 100% Minyari Deposit 12 August 2021 • Outstanding Gold Intersections at 100% Owned Minyari Deposit 6 September 2021 • Further High-Grade Gold Results at 100% Minyari Deposit 5 October 2021 • Significant Gold-Copper Discovery at 100% Minyari Project 19 October 2021 • F urther Significant Gold- Copper Discoveries at Minyari 29 November 2021 • Further High-Grade Gold Results at 100% Minyari Deposit 6 December 2021 • Wilki and Paterson Farm-in Projects Exploration Update 20 December 2021 • Further Outstanding High-Grade Gold Results at Minyari 3 February 2022 • Results Confirm High-Grade Gold-Copper at Depth at Minyari 3 March 2022 • High-Priority Soil and AC Gold-Copper Targets Identified 27 May 2022 • Drill Results Confirm High-Grade Gold at Minyari North 21 July 2022 • Minyari Drilling Identifies Resource Growth Opportunities 10 November 2022 • Resource Drilling Increases Minyari Deposit Confidence 2 March 2023 • Two New Discoveries at 100% Owned Minyari Dome Project 6 March 2023 • Paterson Project and Citadel JV Exploration Results 11 May 2023 • Paterson and Wilki Projects - FY2024 Exploration Programme Update 24 July 2023 • Near-Surface High-Grade Gold Discovery at GEO-01 Target 2 August 2023 • Final CY2023 Phase 1 Drill Results - Minyari Gold Project 15 August 2023 COMPETENT PERSONS STATEMENT EXPLORATION RESULTS COMPETENT PERSONS STATEMENT • High-G rade Gold Zones at GEO- 01 Discovery 12 October 2023 • New gold target identified close to Telfer 20 D ecember 2023 • Minyari Project - P hase 2 2023 Exploration Drilling 21 December 2023 • Minyari Dome Project – Final Assay Results from Phase 2 CY2023 Diamond Drilling 6 February 2024 • Minyari Project - R esults from CY2023 Air Core Drilling 8 March 2024 • Large gold target identified close to Minyari 28 M arch 2024 • High Grade Gold Intersections at GEO-01 – Minyari Dome Project 14 May 2024 • GEO-0 1 Gold Mineralisation Strike Doubled – Minyari Dome Project 4 June 2024 • GEO-0 1 Returns Near- Surface High-Grade Gold - Including 35m at 3.0 g/t Gold from 20m 10 July 2024 • Gold Mineralisation Confirmed at Pacman 30 A ugust 2024 • 100% Owned Minyari Dome Project Grows by 573,000 Oz of Gold 17 S eptember 2024 • Minyari Scoping Study Update Confirms Development Potential 24 October 2024 • GEO-0 1 South Returns Multiple New Zones of Near -Surface Gold, including 23m at 2.8 g/t gold from 77m 25 November 2024 • Second surface geochemical gold target identified close to Telfer 13 D ecember 2024 • Multiple New Zones of Near-S urface, High-Grade Gold Discovered – Minyari Dome Project 16 December 2024 • Multiple High-G rade Gold and Copper Intersections at Minyari 29 January 2025 • Antipa to Retain 100% Ownership of Wilki Project 4 M arch 2025 • Antipa Retains 100% Ownership of Paterson Project (Amended) 9 April 2025 • Resource Growth and Discovery Drilling Commences at Minyari 16 April 2025 • Minyari Project Resource Grows by 100 Koz to 2.5 Moz of Gold 21 M ay 2025 • Significant New Gold-Co pper Discovery at Minyari Dome 30 June 2025 • Expanded Gold-Co pper Discovery and Resource Extensions at Minyari Dome 1 August 2025 • Bonanza New Gold Intersections Returned from Fiama 25 A ugust 2025 • Exceptional Gold Intersections from the Minyari Deposit 30 S eptember 2025 • High-G rade gold results support Resource growth at Minyari 13 October 2025 • High-G rade Gold Intersections at Fiama Further Strengthen the Resource Growth Opportunity at Minyari Dome 10 November 2025 • Minyari Development Resource Grows to 3.3Moz Gold Equivalent 18 D ecember 2025 • Antipa Delivers Multiple New Gold and Copper Discoveries 5 Fe bruary 2026 • Minyari Project Resource Grows to 3.6 Moz Gold Equivalent 2 April 2026 • Commencement of Major Drilling Campaign across Minyari 20 April 2026 • Commencement of Major Drilling Campaign across Minyari 20 April 2026 • PFS Test-w ork Confirms Gold- Copper Processing 7 July 2026 • Phase 1 Drill Results Extend Gold Mineralisation at Fiama 13 J uly 2026 • Phase 1 Drilling Strengthens Telfer-S tyle Reef Target 3 August 2026
Page 45
1. Excludes Antipa’s M ineral Resources Estimate non-gold metals: 90kt of copper, 700koz of silver and 13kt of cobalt. See slide 38 for gold equivalent (AuEq) calculation parameters and full references. 2. Includes Antipa’s Satellite Deposits 150koz gold Mineral Resources Estimate. See Appendix for MRE statement and full references . 3. Havieron the subject of a recent corporate transaction, with 70% of Havieron acquired by Greatland Gold plc from Newmont Corporatio n, for full details please refer to AIM announcement dated 4 December 2024, “Completion of Acquisition of Havieron & Telfer”. 4. Dalgaranga the subject of a recent corporate transaction, with owners Spartan Resources Ltd acquired by Ramelius Resources Ltd, f or full details please refer to ASX announcement dated 31 July 2025, “Ramelius completes acquisition of Spartan”. 5. Mount Gibson Iron Ltd. (ASX: MGX) recently acquired Northern Star Resources’ Ltd (ASX: NST) 50% interest in the Central Tanami Pr oject, for full details refer to MGX’s ASX announcement dated 6 February 2026, “MGX completes its acquisition of 50% of the Central Tanami Gold Project Joint Venture”. Note that the gold-only resource shown for Central Tanami includes a 1 Moz historical (JORC 2004) Mineral Resource estimate. 6. Lady Julie the subject of a recent corporate transaction, with owners Magnetic Resources (ASX: MAU) acquired by Genesis Mineral s Limited (ASX: GMD), refer to ASX announcement dated 22 June 2026, “Implementation of the Scheme”. 7. Yandal Gold Project acquired by Gateway Mining (ASX: GML) from Strickland Metals. For full details refer to GML ASX announceme nt dated 30 June 2025, “Acquisition of Yandal Gold Project from Strickland Metals Ltd”. INVESTOR PRESENTATION | 45 TOP AUSTRALIAN GOLD PROJECTS: REFERENCE INFORMATION Project Company Contained Au (Moz) Resource Grade (g/t Au) Measured Resources (Mt) Indicated Resources (Mt) Inferred Resources (Mt) Stage Study Level (completed) Source Havieron3 Greatland Resources 7.0 2.6 0.0 50.0 81.0 Exploration Feasibility Study Greatland Resources presentation July 2026 Available: https://www.greatland.com.au/wp -content/uploads/2026/07/Corporate -Presentation-July-2026.pdf Dalgaranga4 Ramelius Resources 2.6 5.1 0.0 9.8 6.3 Exploration Pre-Feasibility Study Ramelius Resources presentation dated 2 February 2026 Available: https://www.rameliusresources.com.au/wp -content/uploads/bsk-pdf-manager/2026/02/Investor -Presentation.pdf Minyari1,2 Antipa 2.9 1.33 0.0 42.0 27.0 Exploration Scoping Study Antipa Minerals ASX announcement dated 2 April 2026 Available: https://antipaminerals.com.au/upload/documents/investors/asx- announcements/260401212515_2026- 04-02-MinyariProject-MREUpdate.pdf Central Tanami5 Mount Gibson Iron 2.6 3.0 4.0 13.0 8.4 Exploration Scoping Study Mt Gibson ASX announcement dated 11 November 2025 Available: https://www.mgx.com.au/wp-content/uploads/2025/11/MGX-CTPJV-Resource-Update.pdf Katanning Ausgold 2.4 1.1 41.6 21.2 5.9 Exploration Definitive Feasibility Study Ausgold ASX announcement dated 30 June 2025 Available: https://ausgoldlimited.com/wp-content/uploads/AusgoldDefinitiveFeasibilityStudyKatanningGoldProject30Jun25.pdf Lady Julie6 Genesis Minerals 2.2 1.8 0.0 31.2 7.9 Exploration Feasibility Study Magnetic Resources ASX announcement dated 20 January 2026 Available: https://wcsecure.weblink.com.au/pdf/MAU/03049082.pdf Bullabulling Minerals 260 6.2 1.0 0.0 140.0 51.0 Exploration Pre-Feasibility Study Minerals 260 ASX announcement dated 8 July 2026 Available: https://api.investi.com.au/api/announcements/mi6/fa15b192 -8d8.pdf Youanmi ROX Resources 2.2 5.6 0.0 7.9 4.1 Exploration Definitive Feasibility Study Rox Resources presentation dated 13 May 2026 Available: https://api.investi.com.au/api/announcements/rxl/3610ae2a- c17.pdf Gum Creek Horizon Gold 2.3 1.9 0.0 26.7 11.2 Exploration Scoping Study Horizon Gold presentation dated 29 January 2026 Available: https://wcsecure.weblink.com.au/pdf/HRN/03050124.pdf Roe Ramelius 1.8 1.6 0.0 23.0 11.0 Exploration Definitive Feasibility Study Ramelius Resources presentation dated 2 February 2026 Available: https://www.rameliusresources.com.au/wp -content/uploads/bsk-pdf-manager/2026/02/Investor -Presentation.pdf Mandilla Astral Resources 1.7 1.0 1.3 32.6 19.6 Exploration Pre-Feasibility Study Astral Resources ASX announcement dated 21 April 2026 Available: https://astralresources.com.au/announcements/7499997 Rebecca Ramelius 1.4 1.3 0.0 27.0 6.5 Exploration Definitive Feasibility Study Ramelius Resources presentation dated 2 February 2026 Available: https://www.rameliusresources.com.au/wp -content/uploads/bsk-pdf-manager/2026/02/Investor -Presentation.pdf Mt York Pilbara Gold 2.1 1.1 0.0 42.1 19.7 Exploration Scoping Study Pilbara Gold ASX announcement dated 13 April 2026 Available: https://wcsecure.weblink.com.au/pdf/KAI/03077881.pdf Ravensthorpe Medallion Metals 1.1 3.3 0.0 6.4 3.8 Exploration Feasibility Study Medallion Metals presentation dated 14 October 2025 Available: https://wcsecure.weblink.com.au/pdf/MM8/03007527.pdf Kal East Black Cat Syndicate 1.4 2.0 13.0 10.2 12.2 Exploration Pre-Feasibility Study Black Cat Syndicate ASX announcement dated 29 June 2026 Available: https://api.investi.com.au/api/announcements/bc8/c5e4995b -577.pdf Yandal7 Gateway Mining 0.4 1.5 0.0 0.0 8.2 Exploration MRE only – no completed study Gateway Mining presentation dated 7 May 2026 Available: https://www.gatewaymining.com.au/site/pdf/409dba2e -2a2a-4d4f-b7c0-30ce573b1604/Platform/ListPage/RIU-Sydney-Resources-RoundUp-Presentation.pdf TOP AUSTRALIAN GOLD PROJECTS
Page 47
INVESTOR PRESENTATION | 47 PROJECT SUMMARY: BASE CASE HIGHLIGHTS1 MINE SCHEDULE 30.2 Mt at 1.5 g/t Au Initial open pit and underground mine INITIAL GOLD OUTPUT 1.3 Moz Initial open pit and underground mine NPV7% A$834M Pre-tax at A$3,000 /oz gold STANDARD CIL PLANT 90% gold recovery Simple non-refractory metallurgy CAPITAL COST A$306M Including pre-production mining of A$90M PAYBACK 2 years Pre-tax from first production MINING PHYSICALS 3 Mtpa throughput For 10+ years initial processing life FORECAST AISC A$1,721/oz gold US$1,205 /oz gold IRR 52% Pre-tax at A$3,000 /oz gold 1. Minyari Dome Project Scoping Study Update dated 24 October 2024 completed to ±35% level of accuracy.
Page 48
59 317 576 543 689 777 806 776 778 1610 1351 1093 1125 980 891 863 892 895 Gold Price ± 30% Gold Price ± 20% Gold Price ± 10% OPEX ± 20% OPEX ± 10% CAPEX ± 20% CAPEX ± 10% Recovery ± 2% (Abs.) Discount Rate ± 15% INVESTOR PRESENTATION | 48 PROJECT SUMMARY: BASE CASE SENSITIVITY ANALYSIS PROJECT PROVIDES TREMENDOUS GOLD PRICE UPSIDE1 UoM Base Mid-2025 Feb-2026 Gold price assumption A$/oz 3,000 4,0002 5,000 NPV7% (pre-tax) A$M 834 1,696 2,557 IRR (pre-tax) % 52 91 128 Payback period (pre-tax) years 2.0 1.25 0.75 LoM free cash flow (pre-tax) A$M 1,348 2,621 3,895 NPV7% (post-tax) A$M 598 1,205 1,810 IRR (post-tax) % 46 79 110 Payback period (post-tax) years 2.0 1.25 0.75 LoM free cash flow (post-tax) A$M 972 1,864 2,755 NPV SENSITIVITY ANALYSIS (PRE-TAX, A$3,000/oz AU)1 A$5,000/oz NPV7% A$834M Extreme upside leverage to rising gold price environment D emonstrates economic resilience to variations in upfront capital expense Modestly sensitive to changes in operating costs 1.Minyari Dome Project Scoping Study Update dated 24 October 2024 completed to ±35% level of accuracy. 2.Spot gold price 1 July 2025 +A$5,069/oz. 3.Spot gold price 10 February 2026 A$7,178/oz. NPV7% A$2,557M3
Page 49
INVESTOR PRESENTATION | 49 PROJECT SUMMARY: OPTIMAL PROCESSING CASE OPEN PIT ORE 17.5 Mt UNDERGROUND ORE 12.8 Mt 13.5 M tonnes open pit oreAu GOLD OUTPUT 1.3 Moz SILVER OUTPUT 415 koz Ag 3 Mtpa CIL PROCESSING PLANT AVERAGE GOLD RECOVERY 90% MINYARI DOME STAND ALONE DEVELOPMENT OPPORTUNITY1 OPTIMAL CASE 1. Minyari Dome Project Scoping Study Update dated 24 October 2024 completed to ±35% level of accuracy. Two standard processing facility options e valuated: a gravity and CIL plant for a Gold- Focused case producing doré gold; and a flotation and gravity facility for the Polymetallic Development scenario, producing separate copper-gold and cobalt concentrates alongside some doré gold Each processing facility type was assessed at throughput rates of 1 Mtpa, 2 Mtpa and 3 Mtpa The 3 Mtpa CIL Gold-Focused processing option currently identified as optimal
Page 50
INVESTOR PRESENTATION | 50 PROJECT SUMMARY: BASE CASE PROJECT PARAMETERS: BASE CASE (± 35%)1 Tonnes Mt 30.2 Gold grade g/t 1.5 Contained ounces of gold Moz 1.5 Plant throughput Mtpa 3.0 Processing life (including pre-production) years 10+ Strip ratio open pit waste:ore 4.5:1 Average annual gold production (first 10 years) koz p.a. 130 Total development capital (including pre-production mining) A$M 306 Average Life-of-Mine (LOM) operating cost A$/t milled 77.70 Gold price A$/oz 3,000 All in Sustaining Cost (AISC) LOM average US$/oz 1,205 Net cash flow (undiscounted, pre-tax) A$M 1,348 NPV7% (pre-tax) A$M 834 IRR (pre-tax) % 52 Payback period (pre-tax) years 2.0 Net cash flow (undiscounted, post-tax) A$M 972 NPV7% (post-tax) A$M 598 IRR (post-tax) % 46 NEXT STEPS KEY POTENTIAL UPSIDE DRIVERS Mine schedule and operating life extension to be enabled by: Min eral Resource extensions at multiple deposits Incorporation of existing satellite resources Delineation and incorporation of satellite maiden resources New discoveries across the broader Minyari Dome Project area Additional enhancement potential, including from copper and cobalt by- product contributions Aggressive CY2025 resource extension drilling programmes at Minyari D ome commenced April 2025 Multiple further growth and discovery focused drilling programmes are in planning for CY2025 Continued advancement in parallel of various technical work streams designed to further de-risk and refine the development opportunity 1. Minyari Dome Project Scoping Study Update dated 24 October 2024 completed to ±35% level of accuracy.
Page 51
INVESTOR PRESENTATION | 51 PROJECT SUMMARY: COST ANALYSIS OPERATING COST ESTIMATE1 Area A$ Mining – Open pit 26.50/t ore Mining – Underground 80.00/t ore Infrastructure - Process 20.58/t ore G&A 1.49/t ore CAPITAL COST ESTIMATE (DEVELOPMENT+ SUSTAINING)1 Area A$M Processing Plant (3 Mtpa CIL) 96.2 Contingency 9.6 Infrastructure - Process 36.0 EPCM 14.5 Process Plant Other (incl. Spares) 3.5 Reagents 2.6 Tailings Storage Facility (TSF) 16.6 Infrastructure – General/Other (incl. Camp) 29.3 Open Pit CAPEX 23.6 Underground CAPEX 45.1 Total 276.9 Pre-production Open Pit Mining 90.5 Snowden Optiro independently estimated operating costs based on a contractor mining strategy developed considering the appropriate equipment sizing for both open pit and underground operations, tailored to each deposit and the necessary mining rates (± 35%) Haulage costs to the ROM and waste rock dump were included in the overall operating cost assumptions Strategic Metallurgy conducted an independent assessment of the processing operating cost estimate for a 3 Mtpa throughput rate, which also included relevant administrative costs Prepared by independent consultants Snowden Optiro and Strategic Metallurgy, covering mining, processing and administration Estimates were derived using a desktop approach (± 35%) 1. Minyari Dome Project Scoping Study Update dated 24 October 2024 completed to ±35% level of accuracy.
Page 52
INVESTOR PRESENTATION | 52 PROJECT SUMMARY: MINING APPROACH CONCEPTUAL CONFIGURATION – OPEN PIT and UNDERGROUND MINE DESIGN1 1. Minyari Dome Project Scoping Study Update dated 24 October 2024 completed to ±35% level of accuracy. View bearing -16° to 098° View bearing 0° to 317° Mining Method / Approach: Contractor mining Five open pits and one underground mine Minyari deposit accounts for 95% of the gold production Economic gold cut-off grades: Open pit = 0.30 g/t gold Underground = 1.20 g/t gold
Page 53
INVESTOR PRESENTATION | 53 PROJECT SUMMARY: PRODUCTION PROFILE PRODUCTION PROFILE PROJECTION1 PRODUCTION DETAIL1 115 114 134 120 145 142 139 144 136 116 17 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Recovered gold (koz) 1.32 Moz total gold produced: for ecast annual output of up to 145,000 ounces of gold in Year 5 average of 130,000 ounces of gold per annum over the first ten years 120,000 ounces of gold per annum over the entire +10 year evaluation period 415 koz total silver produced 1. Minyari Dome Project Scoping Study Update dated 24 October 2024 completed to ±35% level of accuracy.
Page 54
INVESTOR PRESENTATION | 54 PROJECT SUMMARY: MINING SCHEDULE MINING SCHEDULE: OPEN PIT AND UNDERGROUND1MINING SCHEDULE: BY RESOURCE CLASSIFICATION1 1. Minyari Dome Project Scoping Study Update dated 24 October 2024 completed to ±35% level of accuracy.
Page 55
INVESTOR PRESENTATION | 55 PROJECT SUMMARY: CONFIGURATION AND PROCESSING 2,250 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 992 1.77 1.31 1.53 1.39 1.69 1.65 1.61 1.67 1.58 1.34 0.59 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 - 500 1,000 1,500 2,000 2,500 3,000 3,500 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Y11 Mill feed (kt) Gold grade (g/t) CONCEPTUAL CONFIGURATION1 PROJECT PROCESSING SCHEDULE1 500 m Mining Method / Approach: Contractor mining Five open pits and one underground mine Minyari deposit accounts for 95% of the gold production Economic gold cut-off grades: Open pit = 0.30 g/t gold Underground = 1.20 g/t gold 1. Minyari Dome Project Scoping Study Update dated 24 October 2024 completed to ±35% level of accuracy.