Earnings release
Page 1
Quarterly Report For Period Ended December 31, 2024 ASX: LKE; OTC: LLKKF lakeresources.com.au For personal use only
Page 2
Executive Update Quarterly Highlights Closed the sale of three of Lake’s non-core lithium brine assets in Argentina for USD$9 million (approximately AUD$13.6 million) which provided Lake with additional, non-dilutive liquidity.1 Engaged with local officials and advanced (i) the Exploitation Environmental Impact Assessment (“EIA”) for the Kachi Project (“Kachi” or “Project”),2 and (ii) the Front-End Engineering Design (“FEED”) for the proposed power delivery system with YPF Luz.3 Maintained Kachi Strategic Partnership discussions with a select group of interested parties while also expanding outreach.4 Completed the Annual General Meeting including the renewal of Lake’s additional placement capacity under ASX Listing Rule 7.1A. 5 Cash expenditures for the quarter ending 31 December 2024 were better than projected, reaffirming 2025 expectations for materially lower cash outgoings compared to calendar year 2024. 5 Lake is continuing it evaluation of Kachi’s project cost estimates released to the market on 19 December 2023 in the Kachi Phase One Definitive Feasibility Study (“DFS”). 6 1Refer to ASX announcement dated 27 November 2024 2Refer to ASX announcement 26 March 2024 3Refer to ASX announcement 6 May 2024 4Refer to ASX announcement dated 1 July 2024 5 Refer to ASX announcement dated 21 November 2024 6 Refer to ASX announcement dated 19 July 2024 For personal use only
Page 3
Kachi During the prior quarter, the Company continued to worked diligently through the Exploitation EIA approval process with the Catamarca Mining Authority: In the quarter ending 31 December 2024, following the Exploitation EIA review process, the mining authority hosted a technical review with an independent subject matter expert sourced by the Catamarca mining authority focusing on ground water modelling. The technical review process continues as planned with a third review session planned for mid February and an additional onsite visit planned for mid March. Exploitation EIA approvals are on schedule to be issued in the first half of calendar year 2025. In accordance with the planned transition from Exploration EIA into Exploitation EIA, Lake has completed 90% of the required remediation of the temporary camp. Operational Update For personal use only
Page 4
Kachi The Company continued to engage with YPF Luz in its evaluation and negotiation of agreements relating to the construction of the high voltage line by YPF Luz for power capacity and delivery of the power supply for Kachi. 1 YPF Luz continues to work to on the FEED document for the proposed power delivery and is on schedule to deliver as planned for the end of April 2025. YPF Luz and Central Puerto S.A. (“CEPU”) announced a strategic agreement to jointly advance the study and development of a major interconnection project to supply clean and efficient electric power to the Puna region (which includes Catamarca Province) of Argentina. The aim of this agreement is to provide a comprehensive energy supply solution with a particular focus on the development of the mining industry including Kachi. 2 As previously announced on 19 July 2024, Lake’s technical team is continuing its evaluation of the DFS project cost estimates to integrate technological advancements, an increase in the brine lithium grade, the potential positive impact of the RIGI framework in Argentina and review Kachi’s design basis. The goal of this review is to achieve a material reduction in Kachi’s cost estimates, including total project capital costs (“CAPEX”) and operating costs (“OPEX”). 3 Operational Update (cont’d) 1 Refer to ASX announcement 6 May 2024 2 See www.centralpuerto.com/en/noticias/central-puerto-and-ypf-luz-sign-a-strategic-agreement-to-develop-an-electrical-interconnection-project-and-boost-mining-growth-in-the-noa-region/ 3 Refer to ASX announcement 19 July 2024 For personal use only
Page 5
Kachi is a Strategically Significant and Large Lithium Carbonate Asset in the Lithium Triangle1 Asset Centenario Ratones (Phase 1 Only) Pozuelos-Pastos Grandes Kachi2 Hombre Muerto West Cauchari Pastos Grandes Maricunga Laguna Verde Owner Annual Production Target Capacity (ktpa) 24 50 25+ 21 25 24 20 20 Mine Life (years) 40 NA 25 4 40 30 40 20 30 Capex ($ M) 870 NA 1,377 429 659 448 1,200 384 Grade (mg/L) 407 NA 205 2 879 475 427 953 200 Cash Operating Cost ($ / tonne) 4,500 – 5,000 NA 6,047 3 6,305 7,879 3,388 6,674 3,875 Extraction DLE Evaporation DLE Evaporation Pond Evaporation Pond Evaporation Pond Evaporation Pond DLE Development Stage In early production Pilot Plant Definitive Feasibility Study (DFS) In Construction Pre-Feasibility Study (PFS) Feasibility (FS) Definitive Feasibility Study (DFS) Scoping (SS) Sources: Wood Mackenzie, company presentations and technical reports. The company does not verify the accuracy of information derived from Wood Mackenzie or from other company presentations and reports Notes: Resource based on M&I and Inferred Resources. 1 See Appendix slides regarding the Reserve Statement and the Project Comparison Information – Resources for additional information. 2 Basis of design lithium grade is based on information in Lake’s DFS. Refer to ASX announcement on 19 December 2023. 3 Cash Costs include facility wide costs, direct extraction package, reagents, lithium chemical plant, general and administrati ve expenses, transportation, and power. 4 See ASX announcement dated 19 December 2023. All dollar figures in USD. Total Resources (Mt LCE) 15.1 11.1 10.6 6.6 6.0 4.9 1.9 1.8 For personal use only
Page 6
Cash Position and Finance Lake held cash of AUD$22.56 million (USD$14.06 million) at 31 December 2024 (including currencies in AUD, USD and Argentine Pesos) with no debt. The Company successfully extended its liquidity runway in the quarter: Lake completed the sale of three of Lake’s non-core lithium brine assets in Argentina for USD$9.0 million (approximately AUD$13.6 million).1 Quarterly payments to related parties of the entity and their associates: Amounts paid to related parties of Lake and their associates during the quarter were AUD$0.57 million. These amounts relate to fees / salaries (including superannuation) paid to directors during the quarter. Corporate 1 Refer to ASX announcement dated 27 November 2024 For personal use only
Page 7
Cash Position and Finance The Company exceeded expectations reducing second half calendar year 2024 total cash expenditures (including the recent quarter’s actual results) as compared to first half calendar year 2024: The quarterly performance reflected the continuing benefit of aggressive cost take-out and the ongoing financial benefit of the Company’s active working capital management. The Company is revising its total expected cash expenditures for the 2025 calendar year, with an expected reduction of an additional 25% - 30% compared to the 2024 calendar year.1 The Company continues to closely monitor its available cash balance and actively minimize, to the extent possible, total relevant outgoings. During the quarter, at Lake’s AGM, shareholders approved the resolution relating to the renewal of Lake’s placement capacity under Listing Rule 7.1A. This 7.1A placement capacity is in addition to the existing Listing Rule 7.1 capacity and the 65 million shares issued to Acuity Capital Pty Ltd. pursuant to its ATM.2 This placement capacity is an important potential source of capital to further improve our liquidity runway. Corporate (cont’d) 1 Excluding impact of foreign exchange 2 Refer to ASX announcement dated 16 September 2024 For personal use only
Page 8
ASX: LKE; OTC: LLKKF lakeresources.com.au Appendix For personal use only
Page 9
Mineral Resource Estimate Table Note: This table has been directly extracted from the JORC update announced on 22 November 2023. Lake Resources N.L. confirms that it Is not aware of any information that materially affects the information included in Lake's JORC update announced on ASX on 22 November 2023 and all material assumptions contained in that announcement continue to apply and have not materially changed. Measured November 2023 (to 400 m depth) Unit Sediment Volume m 3 Specific Yield % Brine Volume m 3 Liters Li mg/l Li grams Li Tonnes Tonnes LCE A 11,001,000,000 0.078 858,078,000 858,078,000,000 210 179,783,644,000 180,000 956,000 B 4,366,100,000 0.081 352,090000 352,090,162,000 229 80,628,647,000 81,000 429,000 C 8,007,400,000 0.068 544,503,000 544,503,200,000 230 125,427,401,000 125,000 667,000 Fan West 8,833,000,000 0.095 839,135,000 839,135,000,000 220 184,609,700,000 185,000 982,000 Total 32,207,500,000 - 2,593,806,000 2,593,806,362,000 - 570,449,393,000 570,000 3,035,000 Unit Sediment Volume m 3 Specific Yield % Brine Volume m 3 Liters Li mg/l Li grams Li Tonnes Tonnes LCE A (South) 3,694,300,000 0.076 278,924,000 278,924,452,000 181 50,485,326,000 50,000 269,000 B (South) 1,489,000,000 0.075 111,543,000 111,543,670,000 179 19,959,624,000 20,000 106,000 C (South) 4,382,400,000 0.067 294,407,000 294,407,879,000 182 53,582,234,000 54,000 285,000 A (North) 3,075,200,000 0.095 292,144,000 292,144,000,000 232 67,891,052,000 68,000 361,000 B (North) 4,294,400,000 0.095 407,968,000 407,968,000,000 241 98,166,484,000 98,000 522,000 C (North) 9,188,400,000 0.092 845,333,000 845,332,800,000 182 206,021,447,000 206,000 1,096,000 400 – 600m Under Salar 12,230,170,000 0.066 806,922,000 806,922,156,000 242 195,275,162,000 195,000 1,039,000 400 – 600m West Fan Deep 4,858,200,000 0.092 446,954,000 446,954,400,000 244 109,056,874,000 109,000 580,000 Total 43,212,070,000 3,484,197,000 3,484,197,358,000 800,438,203,000 800,000 4,258,000 Combined Measured + Indicated 75,419,570,000 6,078,004,000 6,078,003,721,000 1,370,887,596,000 1,370,000 7,293,000 Unit Sediment Volume m 3 Specific Yield % Brine Volume m 3 Liters Li mg/l Li grams Li Tonnes Tonnes LCE A 4,756,500,000 0.080 378,325,000 378,325,351,000 185 69,975,435,000 70,000 372,000 B 1,671,300,000 0.079 131,198,000 131,197,886,000 191 25,101,960,000 25,000 134,000 C 5,287,600,000 0.074 393,746,000 393,746,422,000 218 85,950,119,000 86,000 457,000 Fan North 8,895,490,000 0.081 716,324,000 716,324,455,000 232 166,081,974,000 166,000 884,000 Fan South 12,248,490,000 0.064 781,249,000 781,249,112,000 239 186,718,538,000 187,000 993,000 Under volcano 6,718,700,000 0.074 500,471,000 500,471,260,000 192 96,334,211,000 96,000 512,000 Total 39,578,080,000 2,901,314,000 2,901,314,485,000 630,162,237,000 630,000 3,352,000 Indicated November 2023 to 600 m Inferred November 2023 9 For personal use only
Page 10
Reserve Statement 10 Note: This table has been directly extracted from the maiden Ore Reserve statement announced on 19 December 2023. Lake Resources N.L. confirms that it is not aware of any information that materially affects the information included in the maiden Ore Reserve statement announced on ASX on 19 December 2023 and all material assumptions contained in that announcement continue to apply and have not materially changed. For personal use only
Page 11
Project Comparison Information - Resources Company Project Ownership (%) Status Source Measured / Indicated M&I Inferred LCE (Mt) Eramet Centenario Ratones (Phase 1 Only) 100% Early Production Investor Presentation 7 January 2025 www.eramet.com/wp-content/uploads/2025/01/2025-01-07-Eramet-Investor- Presentation.pdf *reserves information also provided by Wood MacKenzie, and sourced to Eramet , 01 Jan 2024 M: 6.2 I: 6.3 12.5 2.6 15.1 Ganfeng Lithium Pozuelos - Pastos Grandes 100% Construction PPG Project Pilot Plant in Argentina Successfully Started Production 12 December 2023 https://www.ganfenglithium.com/new_detail_en/id/53.html https://www1.hkexnews.hk/listedco/listconews/sehk/2022/0711/2022071100892.pdf M: 0.80 I: 2.67 3.47 7.59 11.06 Lake Resources Kachi 80% DFS Completed JORC Update 22 November 2023 https://lakeresources.com.au/wp-content/uploads/2023/12/lke_kachi-dfs_19-dec-23.pdf M: 3.0 I: 4.3 7.3 3.3 10.65 Galan Lithium Hombre Muerto West 100% In Construction Investor Presentations 30 November 2023 and September 2024 https://galanlithium.com.au/resources/ https://galanlithium.com.au/wp-content/uploads/2024/09/GLN_Presentation_Sept2024.pdf M: 4.7 I: 1.0 5.7 0.9 6.58 Arcadium Lithium Cauchari 100% Study ASX Cauchari Mineral Resource and Ore Reserve Update and Project Update 25 September 2023 https://minedocs.com/24/Cauchari_PR_09252023.pdf Arcadium Lithium Investor Day 2024 Presentation https://s203.q4cdn.com/709125885/files/doc_downloads/2024/09/Arcadium-Lithium- Investor-Day-Presentation-Draft-v_Master-Q4.pdf M: 1.85 I: 2.6 4.45 1.5 5.95 Lithium Argentina Pastos Grandes 100% Feasibility stage, permitted Technical Report 30 April 2023 https://www.resource- capital.ch/fileadmin/news/Millennial_Lithium_Corp/2019_EN/June_2019_Millennial_Lithium_ Initiation_BUY_TP_C_2_20_New_brines_entering_the_lith_1_1__1.pdf M: 2.3 I: 1.8 4.1 0.8 4.20 Lithium Power Maricunga 100% DFS ASX Release 29 September 2021 https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-02427478- 2A1326464?access_token=83ff96335c2d45a094df02a206a39ff4 M: 0.8 I: 1.1 *based on conversion factor of 5.32 1.9 - 1.9 CleanTech Lithium Laguna Verde 100% Scoping Study https://ctlithium.com/projects/laguna-verde/ Investor Presentation October 16 2023 https://wp-ctlithium-rebuild-2022.s3.eu-west-2.amazonaws.com/media/2023/10/CTL- Company-Presentation-October-2023-Final-16.10.23.pdf M: 0.5 I: 0.6 1.1 0.7 1.8 Source: Publicly available company announcements, presentations and technical reports Note: In choosing the peer comparison assets, the Company’s material assumption was that each asset had to be a lithium carbonate asset in the ‘Lithium Triangle’ in Argentina and Chile, similar in resource and jurisdiction to Lake’s own Kachi Project. Each of these assets are either at scoping, DFS, pre-development, construction stage or in early production – i.e. they are not operating assets at full production. For personal use only
Page 12
ASX: LKE; OTC: LLKKF lakeresources.com.au For personal use only
Page 13
SCHEDULE OF TENEMENTS - CATAMARCA - JUJUY TOTAL NUMBER OF RESOURCES: 78 KACHI - ANTOFAGASTA DE LA SIERRA.- CATAMARCA TENEMENT NA NUMBER - GDE AREA H INTEREST PROVINCE STATUS MINING CONCESSION MARIA I EX - 2021 - 00362285 - CAT (140/2018) 1260.0736 100 CATAMARCA GRANTED 15/11/2018 MARIA II EX - 2021 - 00373528 - CAT (14/2016) 546.9333 100 CATAMARCA GRANTED 24/8/2017 MARIA III EX - 2021 - 00293511 – CAT (15/2016) 834.7969 100 CATAMARCA GRANTED 24/8/2017 KACHI INCA EX - 2021 - 00361579 - CAT (13/2016) 857.7131 100 CATAMARCA GRANTED 24/8/2017 KACHI INCA I EX - 2021 - 00432837 – CAT (16/2016) 2880.4365 100 CATAMARCA GRANTED 24/8/2017 KACHI INCA II EX - 2021 - 00221521 – CAT (17/2016) 2822.7403 100 CATAMARCA GRANTED 24/8/2017 KACHI INCA III EX - 2121 - 00321200 – CAT (47/2016) 3355.3649 100 CATAMARCA GRANTED 24/8/2016 KACHI INCA V EX - 2021 - 00208240 – CAT (45/2016) 305.1754 100 CATAMARCA GRANTED 10/10/2017 KACHI INCA VI EX - 2021 - 00294250 – CAT (44/2016) 109.787 100 CATAMARCA GRANTED 24/8/2016 DANIEL ARMANDO EX - 2021 - 00208733 - CAT (23/2016) 3121.876 100 CATAMARCA GRANTED 24/8/2017 DANIEL ARMANDO II EX - 2021 - 00331263 – CAT (97/2016) 1589.664 100 CATAMARCA GRANTED 7/10/2016 MORENA 1 EX - 2021 - 00328638 – CAT (72/2016) 3024.4662 100 CATAMARCA GRANTED 7/10/2016 MORENA 2 EX - 2021 - 00390312 – CAT (73/2016) 2989.429 100 CATAMARCA GRANTED 7/10/2016 MORENA 3 EX - 2021 - 00361695 – CAT (74/2016) 3007.1366 100 CATAMARCA GRANTED 7/10/2016 MORENA 4 EX - 2021 - 00293790 – CAT (29/2019) 2967.6745 100 CATAMARCA GRANTED 18/9/2019 MORENA 5 EX - 2021 - 00221381 – CAT (97/2017) 1415.8752 100 CATAMARCA GRANTED 29/11/2019 MORENA 6 EX - 2021 - 00208283 – CAT (75/2016) 1606.1445 100 CATAMARCA GRANTED 7/10/2016 MORENA 7 EX - 2021 - 00259078 – CAT (76/2016) 2804.9561 100 CATAMARCA GRANTED 7/10/2016 MORENA 8 EX - 2021 - 00294310 - CAT (77/2016) 2961.0131 100 CATAMARCA GRANTED 7/10/2016 MORENA 9 EX - 2021 - 00368898 – CAT (30/2019) 2821.5762 100 CATAMARCA GRANTED 29/11/2019 MORENA 10 EX - 2022 - 00508476 - CAT 2712.9283 100 CATAMARCA APPLICATION MORENA 12 EX - 2021 - 00259022 – CAT (78/2016) 2703.6817 100 CATAMARCA GRANTED 7/10/2016 MORENA 13 EX - 2021 - 00258895 – CAT (79/2016) 3024.4662 100 CATAMARCA GRANTED 7/10/2016 For personal use only
Page 14
LAKE RESOURCES TENEMENT NA NUMBER - GDE AREA H INTEREST PROVINCE STATUS MINING CONCESSION MORENA 15 EX - 2021 - 00360876 – CAT (162/2017) 2559.0852 100 CATAMARCA GRANTED 30/8/2018 PAMPA I EX - 2021 - 00233741 – CAT (129/2013) 690 100 CATAMARCA GRANTED 24/11/2016 PAMPA II EX - 2021 - 00430058 - CAT (128/2013) 1053.15 100 CATAMARCA GRANTED 8/2/2016 PAMPA III EX - 2021 - 00429001 - CAT (130/2013) 477.32 100 CATAMARCA GRANTED 12/12/222 PAMPA 11 EX - 2021 - 00372498 – CAT (201/2018) 815 100 CATAMARCA GRANTED 7/2/2020 PAMPA IV EX - 2021 - 00322433 – CAT (78/2017) 2569.3125 100 CATAMARCA GRANTED 22/3/2018 IRENE EX - 2021 - 00212993 – CAT (28/2018) 2052.2562 100 CATAMARCA GRANTED 6/9/2018 PARAPETO 1 EX - 2021 - 01648141 – CAT (133/2018) 2280.5717 100 CATAMARCA GRANTED 24/9/2018 PARAPETO 2 EX - 2021 - 00235750 – CAT (134/2018) 1729.716 100 CATAMARCA GRANTED 24/9/2018 PARAPETO 3 EX - 2121 - 00261195 – CAT (132/2018) 1891.5621 100 CATAMARCA GRANTED 28/11/2018 PARAPETO III EX - 2021 - 00854749 – CAT 1949.1255 100 CATAMARCA GRANTED 23/8/2022 PARAPETO 4 EX - 2021 - 01651926 – CAT 1948.9079 100 CATAMARCA GRANTED 23/8/2022 GOLD SAND I EX - 2021 - 00376209 – CAT (238/2018) 853.602 100 CATAMARCA GRANTED 24/4/2019 TORNADO VII EX - 2021 - 00208328 – CAT (48/2016) 6628.842 100 CATAMARCA GRANTED 24/11/2016 DEBBIE I EX - 2021 - 00196977 – CAT (21/2016) 1742.85 100 CATAMARCA GRANTED 24/8/2017 DOÑA CARMEN EX - 2021 - 00321876 – CAT (24/2016) 873.1146 100 CATAMARCA GRANTED 24/8/2017 DIVINA VICTORIA I EX - 2021 - 00368383 – CAT (25/2016) 2420.1 100 CATAMARCA GRANTED 24/8/2017 DOÑA AMPARO I EX - 2021 - 00294138 – CAT (22/2016) 2695.2986 100 CATAMARCA GRANTED 24/8/2017 ESCONDIDITA EX - 2021 - 00143141 – CAT (131/2018) 373.4346 100 CATAMARCA GRANTED 24/9/2018 GALAN OESTE EX - 2021 - 00153718 – CAT (43/2016) 3166.9356 100 CATAMARCA GRANTED 14/10/2016 MARIA LUZ EX - 2021 - 00153678 – CAT (34/2017) 2424.9638 100 CATAMARCA GRANTED 27/3/2018 NINA EX - 2021 - 00360751 – CAT (106/2020) 3125.0644 100 CATAMARCA GRANTED 26/10/2021 PADRE JOSE MARIA I EX - 2021 - 00432843 – CAT (95/2012) 650.0094 100 CATAMARCA GRANTED 29/1/2021 PADRE JOSE MARIA II EX - 2021 - 00432950 - CAT (96/2012) 1523.1476 100 CATAMARCA GRANTED 29/1/2021 PADRE JOSE MARIA III EX - 2021 - 00433095 – CAT (94/2012) 1523.1476 100 CATAMARCA GRANTED 29/1/2021 PADRE JOSE MARIA IV EX - 2021 - 00433149 – CAT (93/2012) 1528.6905 100 CATAMARCA GRANTED 29/1/2021 PADRE JOSE MARIA V EX - 2021 - 00647090 – CAT (92/2012) 1584.3384 100 CATAMARCA GRANTED 29/1/2021 For personal use only
Page 15
TENEMENT NA NUMBER - GDE AREA H INTEREST PROVINCE STATUS MINING CONCESSION PADRE JOSE MARIA VI EX - 2021 - 00647273 – CAT (91/2012) 1507.3002 100 CATAMARCA GRANTED 29/1/2021 PADRE JOSE MARIA VII EX - 2021 - 00647377 – CAT (90/2012) 1499.7985 100 CATAMARCA GRANTED 29/1/2021 PADRE JOSE MARIA VIII EX - 2021 - 00647631 – CAT (89/2012) 515.0332 100 CATAMARCA GRANTED 29/1/2021 TOTAL HECTAREAS: 105953.06 ANCASTI - CATAMARCA TENEMENT NA NUMBER - GDE AREA H INTEREST PROVINCE STATUS MINING CONCESSION PETRA II EX - 2021 - 00145689 - CAT (51/2016) 9499.45 100 CATAMARCA CATEO GRANTED 31/03/2017 PETRA III EX - 2021 - 00145810 - CAT (49/2016) 9528.04 100 CATAMARCA CATEO GRANTED 17/08/2017 CATEO 2 EX - 2021 - 00145782 - CAT (94/2016) 7699.22 100 CATAMARCA CATEO GRANTED 17/05/2017 CATEO 4 EX - 2021 - 00145516 - CAT (98/2016) 9849.57 100 CATAMARCA CATEO GRANTED 17/05/2017 LA AGUADA 1 EX - 2021 - 00145356 - CAT (116/2016) 2498.51 100 CATAMARCA MINE GRANTED 17/04/2017 LA AGUADA 2 EX - 2021 - 00145468 - CAT (117/2016) 2949.66 100 CATAMARCA MINE GRANTED 17/04/2017 LA AGUADA 4 EX - 2021 - 00145863 - CAT (173/2016) 2928.54 100 CATAMARCA MINE GRANTED 9/11/2017 LA AGUADA 5 EX - 2021 - 00145839 - CAT (172/2016) 2866.15 100 CATAMARCA MINE GRANTED 9/11/2017 LA AGUADA 6 EX - 2021 - 00145928 - CAT (174/2016) 2999.15 100 CATAMARCA MINE GRANTED 9/11/2017 LA AGUADA 7 EX - 2021 - 00169048 - CAT (137/2016) 2919.48 100 CATAMARCA MINE GRANTED 14/06/2018 LA AGUADA 8 EX - 2021 - 00168791 - CAT (139/2016) 1731.72 100 CATAMARCA MINE GRANTED 14/06/2018 LA HERENCIA 1 EX - 2024 - 00624962 – CAT 3000.00 100 CATAMARCA APPLICATION LA HERENCIA 2 EX - 2024 - 00625035 – CAT 3000.00 100 CATAMARCA APPLICATION LA HERENCIA 3 EX - 2024 - 00624819 – CAT 3000.00 100 CATAMARCA APPLICATION LA HERENCIA 4 EX - 2024 - 00624890 – CAT 502.00 100 CATAMARCA APPLICATION LA HERENCIA 5 EX - 2024 - 00885309 – CAT 3036.73 100 CATAMARCA APPLICATION LA HERENCIA 6 EX - 2024 - 00885613 – CAT 3107.11 100 CATAMARCA APPLICATION LA HERENCIA 7 EX - 2024 - 00885954 – CAT 2929.76 100 CATAMARCA APPLICATION LA HERENCIA 8 EX - 2024 - 01031333 – CAT 3000.00 100 CATAMARCA APPLICATION LA HERENCIA 9 EX - 2024 - 01031427 – CAT 3000.00 100 CATAMARCA APPLICATION LA HERENCIA 10 EX - 2024 - 01031713 – CAT 3000.00 100 CATAMARCA APPLICATION For personal use only
Page 16
LAKE RESOURCES TENEMENT NA NUMBER - GDE AREA H INTEREST PROVINCE STATUS MINING CONCESSION LA HERENCIA 11 EX - 2024 - 01031820 - CAT 838.00 100 CATAMARCA APPLICATION LA HERENCIA 12 EX -2024 - 01399303 – CAT 3000.00 100 CATAMARCA APPLICATION LA HERENCIA 13 EX - 2024- 01399436 – CAT 2938.64 100 CATAMARCA APPLICATION LA HERENCIA 14 EX - 2024 - 01399570 - CAT 3000.00 100 CATAMARCA APPLICATION TOTAL HECTAREAS 92821.72 For personal use only