ORABANDAMINING.COM.AU Investor Presentation Diggers and Dealers, Kalgoorlie ASX: OBM ORABANDAMINING.COM.AU Luke Creagh Managing Director 5 August 2025For personal use only
Page 2
ORABANDAMINING.COM.AU Forward looking statements IMPORTANT NOTICE AND DISCLAIMER This Presentation dated 5 August 2025 contains summary information about Ora Banda Mining Ltd ABN 69 100 038 266 (Ora Banda Mining or the Company) and its activities based on information available at the time of preparing the Presentation. The information contained in this Presentation is of a general nature and does not purport to be complete nor does it contain all the information which a prospective investor may require in evaluating a possible investment in the Company or that would be required in a prospectus or product disclosure statement prepared in accordance with the requirements of the Corporations Act 2001 (Cth). The information contained in this Presentation is a summary only and should be read in conjunction with the Company's other periodic and continuous disclosure announcements lodged with the Australian Securities Exchange (“ASX”), which are available at www.asx.com.au. The historical information in this Presentation is, or is based upon, information that has been released to the ASX. This Presentation is authorised for release by the Ora Banda Mining Board. Forward-looking Statements and Forecasts This Presentation contains certain “forward-looking statements” and comments about future matters. Forward-looking statements can generally be identified by the use of forward-looking words such as, “expect”, “anticipate”, “likely”, “intend”, “should”, “could”, “may”, “predict”, “plan”, “propose”, “will”, “believe”, “forecast”, “estimate”, “target” “outlook”, “guidance” and other similar expressions within the meaning of securities laws of applicable jurisdictions. Indications of, and guidance or outlook on, production or financial position or performance are also forward-looking statements. You are cautioned not to place undue reliance on forward-looking statements. Any such statements, opinions and estimates in this Presentation speak only as of the date hereof (unless otherwise stated) and are based on assumptions and contingencies subject to change without notice, as are statements about market and industry trends, projections, guidance and estimates. Forward-looking statements are provided as a general guide only. The forward-looking statements contained in this Presentation are not indications, guarantees or predictions of future performance and involve known and unknown risks and uncertainties and other factors, many of which are beyond the control of the Company, and may involve significant elements of subjective judgement and assumptions as to future events which may or may not be correct. When forecasting or providing guidance on costs and production the Company has taken into account current operating costs, cost escalation, required personnel numbers, inputs into the technical document of the Sand King Underground FID including capital estimates, submitted tender rates from contractors and suppliers, and average industry productivity and mining specification metrics and the non-binding Memorandum of Understanding dated 10 July 2025 with Norton Gold Fields (which is expected to result in a full form binding ore sale agreement, but there is no guarantee that such binding agreement will be entered into). There can be no assurance that actual outcomes will not differ materially from these forward-looking statements. A number of important factors could cause actual results or performance to differ materially from the forward-looking statements. The forward-looking statements are based on information available to the Company as at the date of this Presentation. Except as required by law or regulation (including the ASX Listing Rules), the Company undertakes no obligation to supplement, revise or update forward-looking statements or to publish prospective financial information in the future, regardless of whether new information, future events or results or other factors affect the information contained in this Presentation (unless otherwise stated). This Presentation is not financial product, investment advice or a recommendation to acquire the Company securities and has been prepared without taking into account the objectives, financial situation or needs of individuals. Before making an investment decision prospective investors should consider the appropriateness of the information having regard to their own objectives, financial situation and needs, and seek legal, taxation and financial advice appropriate to their jurisdiction and circumstances. The Company is not licensed to provide financial product advice in respect of its securities or any other financial products. Cooling off rights do not apply to the acquisition of the Company securities. Disclaimer The Company and its related bodies corporate and each of their respective directors, agents, officers, employees and advisers expressly disclaim, to the maximum extent permitted by law, all liabilities (however caused, including negligence) in respect of, make no representations regarding, and take no responsibility for, any part of this Presentation and make no representation or warranty as to the currency, accuracy, reliability or completeness of any information, statements, opinions, conclusions or representations contained in this Presentation. In particular, this Presentation does not constitute, and shall not be relied upon as, a promise, representation, warranty or guarantee as to the past, present or the future performance of the Company. Endnotes All footnote references in this Presentation have been presented as endnotes in the Appendix. 2 For personal use only
Page 3
ORABANDAMINING.COM.AU 3 We are Ora Banda Mining Sustainably growing gold production to unlock long- term value for all stakeholders PERTH DAVYHURST GOLD PROJECT (100% ORA BANDA MINING) ► Large land holding with 67 granted tenements over 1,135km2 ► Belt-scale exploration potential with more than 140km of highly prospective greenstone strike ► Tenement area covers the convergence of two regionally significant structures ► Established 1.2Mt pa conventional CIP processing facility & 2 camps totalling over 500 rooms and large water bore field ► Strong exploration success over past 3 years since Ora Banda commenced substantial exploration programs WESTERN AUSTRALIA PERTH Menzies Kalgoorlie MASSIVE TENEMENT PACKAGE STRETCHES OVER 140km OF STRIKE LESS THAN 5% OF DRILL HOLES BELOW 100 VERTICAL METRES RESOURCES AND RESERVES1 Total kt g/t Au koz Au Mineral Resource Estimate 23,300 2.6 1,950 Ore Reserves 2,217 2.7 190 WAIHI For personal use only
Page 4
ORABANDAMINING.COM.AU 25.9% 38.5% 9.7% 4.2% 21.8% Hawke's Point Institutions Paradice Board and Management Other 4 Corporate overview ASX: OBM BOARD OF DIRECTORS Peter Mansell Non-executive Chairman (Corporate Lawyer) Luke Creagh Managing Director (Mining Engineer) Alan Rule Non-executive Director (Chartered Accountant) Jo-Anne Dudley Non-executive Director (Mining Engineer) Kathryn Cutler Non-executive Director (Geologist) SENIOR MANAGEMENT Doug Warden Chief Financial Officer Andrew Czerw Chief Development Officer Rhianna Farrell Chief Geologist Katherine Blacklock General Manager People and Culture Mick Horrigan General Manager Operations Kale Ross General Manager HSET Julie Athanasoff General Counsel and Joint Company Secretary CAPITAL STRUCTURE Share Price* A$/share 0.735 Shares on issue* million 1,883.8 Performance rights on issue* million 151.3 Market Capitalisation* A$ million 1,384.6 Cash** A$ million 84.2 Debt** A$ million 4.0 Enterprise Value A$ million 1,304.4 Undrawn revolving credit facility2,12 A$ million 50.0 * As of market close on 30 July 2025. **As at 30 June 2025. Note that the remaining $4 million in debt to Hawke’s Point will be offset against consideration subject to completion of the full form WesCEF documentation as per ASX announcement dated 29 July 2025. REGISTER COMPOSITION For personal use only
Page 5
ORABANDAMINING.COM.AU 26.8 48.7 57.8 80.7 84.2 50 0 20 40 60 80 100 120 140 Jun-24 Sep-24 Dec-24 Mar-25 Jun-25 Revolving Credit Facility Closing Cash 5 Strengthening Balance Sheet underpins Growth Closing FY25 cash of $84.2 million, representing $57.4 million increase during the year Execution of $50 million Syndicated Facility Agreement provides over $130 million in liquidity2 BALANCE SHEET RECENT EXPLORATION SUCCESS ► $57.4 million cash build after investing over $124 million in capital projects, resource development and exploration12 ► SFA executed with ANZ and CBA for $50 million2 with a 2-year revolving credit facility with option for one-year extension ► Outstanding conditions to financial close continue to be progressed12 ► SFA has no mandatory hedging; however, OBM purchased 100koz of Put options at A$4,400/oz spread evenly over FY26 as insurance on gold price, with premium payments deferred to ~$1.2 million per month over FY26 1 2 $50M RCF, plus improved cash position provides +$130M in liquidity IMPROVED LIQUIDITY POSITION ► ~$28 million invested in FY25 exploration and resource development has delivered significant outcomes including: ► Identification of Little Gem as Greenfields discovery4,10,11,13 ► High grade intercepts at Riverina 300m below current mine plan and 700m below current decline face, confirming a robust and continuous system expanding 1,000 vertical metres 13 ► Expanded Sand King mineralisation to the south8 ► Drilling at Waihi intersected two wide, high-grade lodes 400 meters below surface13 For personal use only
Page 6
ORABANDAMINING.COM.AU 0 20 40 60 80 100 120 140 160 180 FY23 (Actual) FY24 (Actual) FY25 (Actual) FY26 (Guidance, mid) 3rd Party Milling Davyhurst Plant AISC/oz (A$) $2,850/oz 6 FY26 Guidance12 FY26 guidance to deliver record production, cashflow and investment PRODUCTION OPTIMISE PERFORMANCE AND GROW THE BUSINESS ► Production up ~60% on FY25 targeting 140 -155koz* ► Includes ~21koz attributable equivalent production from proposed ore sale agreement with Norton Gold Fields* ► Full year contribution from Sand King Underground PRODUCTION AND COST GUIDANCE12 ► $86 million in FY26 for on-going mine development, process plant improvements and new infrastructure (including on-site airstrips, upgraded camps and haul roads) ► $73 million in FY26 for exploration and resource development targeting Riverina and Sand King Underground mine life extensions and rapidly advancing key prospects such as Little Gem, Waihi and Round Dam ► Feasibility study underway to expand Davyhurst throughput to ~3mtpa, addressing current milling constraints 48 koz 70 koz 92 koz 140- 155 koz* $2,693/oz$2,767/oz $3,065/oz ► AISC/oz includes additional costs associated with third party crushing and processing of ore sold by OBM ► Increased mining and sustaining development costs for Sand King Underground ► Higher royalties on stronger gold prices COSTS * ~21koz of attributable equivalent production from proposed ore sale agreement with Norton Gold Fields (NGF) for the sale and processing of up to 400kt of ore in FY26 (200kt – 400kt anticipated). Ora Banda entered into a non-binding Memorandum of Understanding (MOU) with NGF on 10 July 2025, which is expected to result in a full form binding ore sale agreement. There is no guarantee that the parties will execute a full form binding ore sale agreement. For personal use only
Page 7
ORABANDAMINING.COM.AU 7 Sustainability at Ora Banda Sets the foundation on which our future production growth will be built IDENTIFY ASSESS MONITOR REVIEW ► 12-month TRIFR: 10.9 and 12-month LTIFR: 0.7 ► Dedicated Sustainability Committee ► Preparing for Sustainability Reporting ► Climate Readiness Assessment and Climate Change Analysis completed ► Environmental management system including progressive rehabilitation embedded into operations ► Highly motivated and engaged employees, with retention at record highs ► 50% reduction in turnover from 34.4% to 16.7% over past 12 months ► Female participation 24% of employees ► Highly engaged workforce for with greater than 80% employees positively engaged ► Active engagement with community and traditional owners as key stakeholders For personal use only
Page 8
ORABANDAMINING.COM.AU 8 Leveraging our organic opportunities Riverina and Sand King Underground mines set to fill the Davyhurst mill with high-grade ore For personal use only
Page 9
ORABANDAMINING.COM.AU 9 FY25 – Delivering on underground strategy Strategy change to focus to underground delivered record revenues and strong cash flows FY25 KEY ACHIEVEMENTS ► $57.4 million in cash build from revenues of $406 million and despite investing over $124 million in capital, resource development and exploration ► Riverina UG achieved capital payback only 18 months after commencement7 ► Sand King UG ramped up for significant contribution in FY26 ► Ounces sold from Davyhurst of 91.7koz represents a 36% (24.4koz) increase from FY24 ► FY25 set a strong platform for record ounces forecast to be mined in FY26 ► With Sand King and Riverina undergrounds both producing, the operation is now mill constrained and a feasibility study has commenced to expand the processing capacity to ~3.0Mtpa * Unaudited CLOSING CASH A$84.2 million $57.4 million increase from FY24 2.0 2.3 3.7 3.5 - 20 40 60 80 100 120 140 160 FY23 FY24 FY25 FY26 (Guidance) Sand King UG Riverina UG Open Pits Low Grade UG Grade (g/t) ANNUAL MINED OUNCES & GRADE 78 koz 91 koz 165-170 koz REVENUES A$406.0 million12* 90% ($192M) increase from FY24 18-month ramp up with UG strategy, which included commencing two new UG’s 49 koz For personal use only
Page 10
ORABANDAMINING.COM.AU 10 Riverina Underground mine Capital payback achieved only 18 months after commencement7 22,591 57,207 27,132 32,498 28,229 31,895 1,705 37,103 94,960 83,748 98,455 110,887 3,271 14,250 21,458 19,802 18,763 14,787 0.0 10,000. 0 20,000.0 30,000.0 40,000.0 50,000.0 60,000.0 - 1,00 0 2,00 0 3,00 0 4,00 0 5,00 0 6,00 0 7,00 0 8,00 0 9,00 0 10,0 00 11,0 00 12,0 00 13,0 00 14,0 00 15,0 00 16,0 00 17,0 00 18,0 00 19,0 00 20,0 00 21,0 00 22,0 00 23,0 00 24,0 00 25,0 00 26,0 00 27,0 00 28,0 00 29,0 00 30,0 00 31,0 00 32,0 00 33,0 00 34,0 00 35,0 00 36,0 00 37,0 00 38,0 00 39,0 00 40,0 00 41,0 00 42,0 00 43,0 00 44,0 00 45,0 00 46,0 00 47,0 00 48,0 00 49,0 00 50,0 00 51,0 00 52,0 00 53,0 00 54,0 00 55,0 00 56,0 00 57,0 00 58,0 00 59,0 00 60,0 00 61,0 00 62,0 00 63,0 00 64,0 00 65,0 00 66,0 00 67,0 00 68,0 00 69,0 00 70,0 00 71,0 00 72,0 00 73,0 00 74,0 00 75,0 00 76,0 00 77,0 00 78,0 00 79,0 00 80,0 00 81,0 00 82,0 00 83,0 00 84,0 00 85,0 00 86,0 00 87,0 00 88,0 00 89,0 00 90,0 00 91,0 00 92,0 00 93,0 00 94,0 00 95,0 00 96,0 00 97,0 00 98,0 00 99,0 00 100 ,000 101 ,000 102 ,000 103 ,000 104 ,000 105 ,000 106 ,000 107 ,000 108 ,000 109 ,000 110 ,000 111 ,000 112 ,000 113 ,000 114 ,000 115 ,000 116 ,000 117 ,000 118 ,000 119 ,000 120 ,000 121 ,000 122 ,000 123 ,000 124 ,000 125 ,000 126 ,000 127 ,000 128 ,000 129 ,000 130 ,000 131 ,000 132 ,000 133 ,000 134 ,000 135 ,000 136 ,000 137 ,000 138 ,000 139 ,000 140 ,000 141 ,000 142 ,000 143 ,000 144 ,000 145 ,000 146 ,000 147 ,000 148 ,000 149 ,000 150 ,000 151 ,000 152 ,000 153 ,000 154 ,000 155 ,000 156 ,000 157 ,000 158 ,000 159 ,000 160 ,000 161 ,000 162 ,000 163 ,000 164 ,000 165 ,000 166 ,000 167 ,000 168 ,000 169 ,000 170 ,000 171 ,000 172 ,000 173 ,000 174 ,000 175 ,000 176 ,000 177 ,000 178 ,000 179 ,000 180 ,000 Mar-24 Jun-24 Sep24 Dec-24 Mar-25 Jun-25 Stope (t) Development (t) Ounces Mined QTLY ORE MINED AND OUNCESSTEADY STATE MINING WITH CONTINUOUS HIGH-GRADE MINERALISATION ► FY25 total mining*: 508kt mined at 4.6g/t, above reserve grade of 4.2g/t ► Level plans demonstrate main lodes are continuous and high-grade ► FY25 Q4 impacted by mining delays (availability of raisebore rig) resulting in ~3koz of high-grade stopes being deferred to July 202512 COMMERCIAL PRODUCTION AUG-24 FY25 MINED GRADE > FORECAST & RESERVE GRADE 2275 LEVEL FACE ODS_10 4.6m at 9.0 g/t 2295 N2 510 STOPE * Excluding LG ore mined – 181kt mined at 1.6g/t. For personal use only
Page 11
ORABANDAMINING.COM.AU 11 Riverina Underground mine ► Deeper drilling confirms continuity of high-grade gold mineralisation over 1,000m below surface and over 700m below current decline face ► 3 x underground diamond drill rigs are now operating at Riverina to continue infilling and expanding mineralisation envelope ► Underground drill platforms planned in FY26 to increase drill density and focus on reserve conversion ► System remains open at depth and to the north and south Successful drilling paves way for multi-year mine extension4 Current decline face 300 metres below surface Current mine design 540 metres below surface High grade mineralisation to 1000 metres below surface For personal use only
Page 12
ORABANDAMINING.COM.AU Sand King Underground mine Mine ramped up as second ore source 12 SAND KING TO ENABLE 150 KOZ PA PRODUCTION OUTLOOK ► Modest capital investment of A$39 million, funded by operating cashflows 5 ► Sand King UG ramped up for significant contribution in FY26 ► Capital infrastructure projects now completed ► Existing Resource is open in all directions, with initial underground drilling focusing on the wider “blow-out” zones identified in surface drilling ► Mining rates continue to improve with 1,633 development metres advanced in Jun- 25 quarter, including 981 metres of operating development ► Early grade control drilling indicates 19% uplift in gold endowment SAND KING UNDERGROUND ORE RESERVE ESTIMATE1 DEPOSIT PROVED PROBABLE TOTAL MATERIAL Sand King UG (kt) (g/t Au) (kt) (g/t Au) (kt) (g/t Au) (koz) Total - - 537 3.2 537 3.2 55 PORTAL COMMENCED Q1 FY25 1 FIRST DEVELOPMENT ORE Q2 FY25 2 STOPING COMMENCED Q3 FY25 3 For personal use only
Page 13
Sand King Underground Mine ramped up Deeper drilling planned in FY26 targeting depth extensions of mineralised system SW SAND KING LONG SECTION LOOKING NORTHWEST (TOP SECTION OF FID CASE; LOWER SECTION OF UPDATED FY26 MINE PLAN) ► Mineralisation consists of multiple lodes per level demonstrating both higher grade and “blow-out” zones at structural intersections ► Drilling in FY25 has already extended mineralisation to the south, with a second decline incorporated into the mine plan ► System remains open in all directions, with deeper drilling planed early in FY26 to test mineralisation at depth ► Currently have 2 underground diamond drill rigs on site, increasing to 4 diamond rigs over next 3 months For personal use only
Page 14
Sand King – Large scale and multi-lode system Mineralised system remains open to the North and South as well as at depth N SAND KING PLAN VIEW OF 4270-4291 LEVEL ► Drilling at Little Gem intersected two wide, high-grade lodes 400 metres below surface (mbs) including 22.7m @ 5.0g/t and 10.9m @ 6.4g/t ► Follow up work has identified that this same lithological unit is present at Sunraysia associated with high-grade gold mineralisation ► 16-hole follow-up program commenced to test entire 4.7km strike of Little Gem carbonate zone down to 400mbs 14 For personal use only
Page 15
ORABANDAMINING.COM.AU 15 $73 million Exploration spend to drive growth12 ► $73 million budget for drilling expected to deliver ~329km of drilling (this is almost double the last 3 years combined which resulted in the discovery and development of two underground mines) ► FY26 focus is to: ► Extend mine lives at Riverina and Sand King Undergrounds; laterally and at depth ► Little Gem Phase 3 drilling to rapidly advance understanding of scale and size of system ► Test Waihi’s down-dip and parallel lode potential as a third underground ► Advance Round Dam as potential bulk mining opportunity ► Continue belt-wide exploration across ~140km of tenure in with key focus on the Mulline Trend FY26 drilling program is the biggest in the 130-year history of the Davyhurst goldfield For personal use only
Page 16
Riverina to Sunraysia Trend High grade, multi-lode gold system expanded to over 1km strike at Little Gem14 N ► Drilling at Little Gem intersected two wide, high-grade lodes (Diamond and Ruby Lodes) 400 metres below surface (mbs) including 22.7m @ 5.0g/t and 10.9m @ 6.4g/t ► Follow up drilling 400m to the north of Little Gem returned 8.8m @ 6.3g/t (including 0.6m @ 59.3g/t) at 320mbs 16 For personal use only
Page 17
ORABANDAMINING.COM.AU 17 Little Gem – Unlocking a potentially large system Phase 3 follow up drilling program of 38 holes has commenced14 ► Drilling has confirmed a multi- lode gold mineralised system at Little Gem, with high gold grades and large lode widths ► Currently four lodes have been modelled, the Diamond Lode, Ruby Lode, Sapphire Lode and the Tanzanite lode ► The prospective strike of a high- grade shoot on the Diamond Lode could be over 1,000 metres and remains open at depth ► Phase 3 follow up drilling program of 38 holes has commenced with two diamond rigs and one RC rig currently active on the programFor personal use only
Page 18
Central Davyhurst UG potential at Waihi Trend Historical underground mined at 29.7g/t head grade with limited down dip exploration of high-grade shoots ► Historical Golden Pole Mine (200m West of Waihi) produced 81kt for 77koz (29.7g/t head grade)9, in the circa early 1900s ► “Boots-on-ground” geology approach focussed on remapping and updating structural and lithological mineralisation targeting framework ► Recent drilling has extended high grade plunge of Waihi by over 100m to 330mbs, with intersection of 8.7m @9.3g/t incl. 1.1m @ 30.2g/t & 0.4m @ 90g/t ► Further drilling currently underway testing high-grade shoot extensions at depth and potential of parallel lodes WAIHI PLAN VIEW WAIHI LONG SECTION LOOKING WEST: HIGH GRADE SHOOTS DEMAND FOLLOW UP DRILLING 18ORABANDAMINING.COM.AU Waihi Plan View For personal use only
Page 19
Round Dam Trend New geological model potentially opens large-scale belt Schematic 3D model showing dominant gold lodes relative to simplified lithological sequence ► Due to historical processing and capital constraints, this potentially large scale, bulk system was drilled for discrete, high-grade open pit opportunity ► Step out drilling has commenced targeting all lodes as a potential larger scale and bulk mining opportunity, with initial focus on the 7km strike from Salmon Gums to Federal Flag North For personal use only
Page 20
Underground potential at the Mulline deposit Underexplored trend over 10 km strike located ~8km west of the Riverina Trend N MULLINE LONG SECTION LOOKING WEST: HISTORIC SHALLOW GOLD MINING ► Over 10km trend with old open pit mines, numerous surface anomalies & high grades identified through air core, limited reverse circulation and diamond drilling ► Less than 5% of drill holes are below 100 vertical metres → exploration opportunity for potential high-grade underground mines S MULLINE TREND 10 KM OPEN UNTESTED UNTESTED OPEN LADY GLADYS OFFSET YOUNG AUSTRALIAN PEACH TREE MULLINE ROSE VICTORIA WORKINGS 20ORABANDAMINING.COM.AU OPEN For personal use only
Page 21
ORABANDAMINING.COM.AU 21 FY26 – A catalyst-rich year ahead OPERATE WITH INTEGRITY TO DELIVER OUR COMMITMENTS A DYNAMIC AND CATALYST-RICH YEAR AHEAD BUILDING A PREMIER GOLD MINING BUSINESS ➢ FY26 forecast to increase production by 60% to deliver ~150koz ➢ Production from Riverina and Sand King underground mines removes single asset mining risk → total mined tonnes exceeds current mill capacity ➢ Feasibility study commenced to increase processing capacity to ~3.0Mtpa → due in March 2026 quarter ➢ $73 million allocated to Exploration and Resource Development drilling to start unlocking the belt including: o Sand King depth extensions o Expanded drill program at Little Gem o Extending Waihi as underground mining potential o Drill program to unlock Round Dam trend as bulk open pit mining o Drill testing Mulline Trend for both open pit and underground potential For personal use only
Page 22
ORABANDAMINING.COM.AU Appendix 22 For personal use only
Page 23
ORABANDAMINING.COM.AU Mineral Resource Estimate Statement (2024)1 23 Notes: 1. The Riverina Area, British Lion, Callion, Forehand and Silver Tongue Mineral Resources have been updated in accordance with all relevant aspects of the JORC code 2012, and initially released to the market on 2 December 2019, 26 May 2020, 5 June 2020, 9 October 2020, 1 August 2022 & 16 February 2023 (Riverina Area), 15 May 2020 & 29 June 2020 (Callion), 29 July (Forehand, Silver Tongue & British Lion). 2. The Sand King, Missouri and Waihi Mineral Resources have previously been updated in accordance with all relevant aspects of the JORC code 2012, and initially released to the market on 3 January 2017 & 26 May 2020 (Sand King), 15 December 2016 & 26 May 2020 (Missouri), 4 February 2020 (Waihi). Further updates to Sand King and Riverina are provided in the Company’s ASX release, ‘Annual Mineral Resource and Ore Reserve Statement’ dated 2 July 2024. 3. All Mineral Resources listed adjacent, with the exception of the Missouri, Sand King, Riverina Area, British Lion, Waihi, Callion, Forehand and Silver Tongue were prepared previously and first disclosed under the JORC Code 2004 (refer Swan Gold Mining Limited Prospectus released to the market on 13 February 2013). These Mineral Resources have not been updated in accordance with JORC Code 2012 on the basis that the information has not materially changed since it was first reported. 4. The Riverina, British Lion, Waihi, Missouri, Callion, Forehand and Silver Tongue Open Pit Mineral Resource Estimates are reported within a A$2,400/oz pit shell above 0.5g/t. The British Lion, Waihi, Missouri, Callion, Forehand and Silver Tongue Underground Mineral Resource Estimates are reported from material outside a A$2,400 pit shell and above 2.0 g/t. Riverina Underground Mineral Resource Estimates are reported from fresh material below the A$2,400/oz pit shell within Mine stope optimised solids of dimensions 10m x 10m x 1.6m minimum width at a diluted cut-off grade of 1.3g/t. Sand King Underground Mineral Resource Estimates are reported from fresh material below 350mRL (base of open pit) within Mine stope optimised solids of dimensions 10m x 10m x 1.6m minimum width at a diluted cut-off grade of 0.8g/t. 5. Resources are inclusive of in-situ ore reserves and are exclusive of surface stockpiles. 6. The above table may contain rounding adjustments.. PROJECT MEASURED INDICATED INFERRED TOTAL MATERIAL ('000t) (g/t Au) ('000t) (g/t Au) ('000t) (g/t Au) ('000t) (g/t Au) ('000oz.) LIGHTS OF ISRAEL - - 74 4.3 180 4.2 254 4.2 34 MAKAI SHOOT - - 1,985 2.0 153 1.7 2,138 2.0 136 WAIHI Open Pit - - 2,057 2.3 95 2.0 2,152 2.3 157 Underground - - 278 3.6 324 3.5 602 3.5 68 TOTAL - - 2,335 2.5 419 3.5 2,754 2.5 225 Central Davyhurst Subtotal - - 4,394 2.3 752 3.3 5,146 2.4 396 LADY GLADYS - - 1,858 1.9 190 2.4 2,048 1.9 125 RIVERINA AREA Open Pit 476 1.7 2,118 1.6 117 1.5 2,711 1.6 138 Underground 24 3.8 1,641 3.8 2,294 3.6 3,959 3.7 468 TOTAL 500 1.8 3,759 2.6 2,411 3.5 6,670 2.8 606 BRITISH LION Open Pit - - 386 1.6 17 1.6 403 1.6 21 Underground - - 36 3.2 3 3.8 39 3.2 4 TOTAL - - 422 1.7 20 2.0 442 1.7 25 FOREHAND Open Pit - - - - 691 1.5 691 1.5 33 Underground - - - - 153 2.5 153 2.5 12 TOTAL - - - - 844 1.7 844 1.7 46 SILVER TONGUE Open Pit - - - - 127 2.3 127 2.3 9 Underground - - - - 77 4.5 77 4.5 11 TOTAL - - - - 204 3.1 204 3.1 21 SUNRAYSIA - - 175 2.1 318 2.0 493 2.0 32 Riverina-Mulline Subtotal 500 1.6 6,214 2.2 3,987 2.9 10,701 2.5 854 SAND KING Open Pit - - 0 0.0 0 0.0 Underground 113 1.9 1,444 2.7 1,858 2.9 3,415 2.8 304 TOTAL 113 1.9 1,444 2.7 1,858 2.9 3,415 2.8 304 MISSOURI Open Pit - - - - - - - - - Underground - - 464 3.4 246 4.9 710 3.9 89 TOTAL - - 464 3.4 246 4.9 710 3.9 89 PALMERSTON / CAMPERDOWN - - 118 2.3 174 2.4 292 2.4 23 BLACK RABBIT - - - - 434 3.5 434 3.5 49 Siberia Subtotal 113 1.9 2,026 2.9 2,712 3.1 4,851 3.0 465 CALLION Open Pit - - 241 3.7 28 1.6 269 3.5 30 Underground - - 255 6.0 156 5.5 411 5.8 77 TOTAL - - 496 4.9 184 4.9 680 4.9 107 Callion Subtotal - - 496 4.9 184 4.9 680 4.9 107 FEDERAL FLAG 32 2 112 1.8 238 2.5 382 2.3 28 SALMON GUMS - - 199 2.8 108 2.9 307 2.8 28 WALHALLA - - 448 1.8 216 1.4 664 1.7 36 WALHALLA NORTH - - 94 2.4 13 3.0 107 2.5 9 MT BANJO - - 109 2.3 126 1.4 235 1.8 14 MACEDON - - - - 186 1.8 186 1.8 11 Walhalla Subtotal 32 2.0 962 2.1 887 2.0 1,881 2.1 125 Davyhurst Total 600 1.8 14,100 2.4 8,500 3.0 23,300 2.6 1,950 For personal use only
Page 24
ORABANDAMINING.COM.AU Ore Reserve Statement (2024)1 24 DAVYHURST GOLD PROJECT ORE RESERVE BY DEPOSIT PROJECT AREA PROVED PROBABLE TOTAL MATERIAL (kt) (g/t Au) (kt) (g/t Au) (kt) (g/t Au) (koz) Riverina UG 651 4.2 651 4.2 87 Sand King UG 537 3.2 537 3.2 55 Total UG 1,188 3.7 1,188 3.7 142 Davyhurst Waihi OP 307 2.4 307 2.4 24 Low-grade mines 123 1.1 123 1.1 4 Stockpiles 600 1.1 600 1.1 20 Total other 600 1.1 123 1.1 1,030 1.5 48 Grand Total 600 1.1 1,311 3.5 2,217 2.7 190 Notes: 1. The table contains rounding adjustments to reflect accuracy and may not total exactly. 2. This Ore Reserve was estimated from practical mining envelopes and the application of modifying factors for mining dilution and ore loss. 3. For the open pit Ore Reserve, dilution skins were applied to the undiluted Mineral Resource estimate. The method also included internal and edge dilution resulting from forming practical mineable shapes. Dilution was incorporated in the model at the background grades estimated into the model: The average grade of dilution for Waihi was 0.16 g/t. The estimated average dilution at Waihi was estimated to be 27%. Ore loss was incurred in the Auto Stope Designer (ASD) Deswik process due to variation between mineralised lode geometry and practical dig block geometry. In addition, a nominal 5% loss was applied for further mining losses occurring through normal operations. 4. For the underground Ore Reserve, dilution skins were applied to the Mineral Resource estimate. Dilution was included at the background grade estimated into each model. The Riverina dilution is estimated to average 59% while Sand King is estimated to average 29%, reflecting mining shapes and orebody widths appropriate for each deposit. 5. The Inferred Mineral Resource within the mining envelope was considered as waste when defining limits of these envelopes; however, minor amount of inferred material was included within the Riverina Underground and Sand King Underground mine plan due to practical mining geometries and orebody characteristics. 6. The Waihi open pit Ore Reserve was primarily estimated using a cut-off grade of 1.2 g/t based on a gold price of A$2,600/oz. Low Grade reserve was based on A$3,000/oz. Costs used in the cut-off grade calculation allow for ore transport, processing, site overheads and selling costs as well as a historical global process recovery of 92%. 7. The Ore Reserve is inclusive of surface stockpiles above cut-off. All surface stockpiles were classified as Proved. 8. All low grade material is in situ. 9. The Underground Ore Reserve was estimated using a cut-off grade of 2.5 g/t Au based on a gold price of A$2,250/oz, stopes were further spatially optimised. Costs used in the cut-off grade calculation allow for ore transport, processing, site overheads and selling costs as well as process recovery specific to the location. Process recoveries range for the project were estimated to be 87% or above, based on recent metallurgical test work. 10. Inferred material within total Underground Ore Reserve equates to 24,250t at a grade of 4.5g/t. This material is included at the edges of the mining envelope and equate to 2.5% of the Ore Reserve inventories. 11. Costs were derived from the FY25 budget estimate including underground contract pricing current at the date of this Ore Reserve and budget level contract pricing for Waihi. Unit costs for haulage, processing and site overheads were estimated based on scheduled process plant throughput of material above the economic cut-off grade. Full utilisation of process capacity is reliant on realising expected conversion of further Mineral Resource to Ore Reserve. For personal use only
Page 25
ORABANDAMINING.COM.AU ASX Listing Rule 5.23 Statements Mineral Resources and Reserves The information in this Presentation that relates to Mineral Resources and Ore Reserves has been extracted from the Company’s ASX release, ‘Annual Mineral Resource and Ore Reserve Statement’ dated 2 July 2024; and is available to view at www.orabandamining.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in that ASX release and that all material assumptions and technical parameters underpinning the estimates in that ASX release continue to apply and have not materially changed. Exploration Results The information in this Presentation regarding Exploration Results has been extracted from the Company’s ASX releases set out below, which are available to view at www.orabandamining.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in those ASX releases. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from those ASX releases. . For further information on historical significant intercepts please also refer to the Company’s website www.orabandamining.com.au/technical-data. Riverina: Strong New Drill Results at Riverina, Waihi & Little Gem’ dated 10 June 2025, ‘Exploration Results at Little Gem’ dated 19 March 2025, ‘Outstanding Results at Little Gem Confirm Greenfields Discovery’ dated 13 March 2025, ‘Successful Exploration Drilling at Riverina Paves the Way for Multi-year Mine Life Extension’ dated 13 February 2025, ‘Davyhurst Gold Project Update’ dated 3 September 2024, ‘Riverina Underground & Sand King Update’ dated 4 April 2024, ‘Company Update – Key Milestones Achieved’ dated 28 November 2023, ‘Exploration Update’ dated 3 August 2023, ‘Exploration Update’ dated 16 May 2023, ‘Riverina Exploration Update’ dated 10 February 2023, ‘Riverina Exploration Update’ dated 7 December 2022, ‘Riverina Exploration Update’ 19 October 2022, ‘Riverina Underground Infill and Extension Drilling Delivers Strong Results’ dated 2 August 2021, ‘First Pass Exploration Success – Grass roots exploration intersects significant mineralisation’ dated 30 July 2021, ‘Riverina South & Riverina Underground Infill and Extension Drilling Delivers Further Strong Results’ dated 8 March 2021, ‘Infill Drilling at Riverina South Delivers Further Strong Results’ dated 10 February 2021, , ‘Further Strong Results from Riverina South’ dated 10 August 2020, ‘Initial Drilling at Riverina South Delivers Strong Results’ dated 9 April 2020, First Phase of Drilling at Riverina Finalised Upgraded Minerals Resource Estimate Underway’ dated 8 October 2019, ‘High Grade Results from Riverina Phase 1 Drilling Continue’ dated 16 September 2021, ‘High Grade Assay Results Continue at Riverina’ dated 26 August 2019, ‘High Grade Assay Results Received including 23m@9.1g/t Au’ dated 29 July 2019, and ‘Riverina Drilling Update’ dated 17 Apr 2018. 25 Exploration Results (Continued) Mulline Exploration Long: ‘Operational and Exploration Update’ dated 22 February 2022, ‘Further Exploration Success in Grass Roots and Brownfields Exploration Programs’ dated 25 October 2021 and ‘Exploration Drilling Delivers Encouraging Results‘ dated 20 May 2020. Riverina Exploration Long: ‘Exploration Update’ dated 3 August 2023, ‘First Pass Exploration Success ‘ dated 30 July 2021 and ‘Riverina South & Riverina Underground Infill and Extension Drilling Delivers Further Strong Results’ dated 8 March 2021. Sand King: Sand King Underground Ramp Up On Track With First Ore Batched Through Davyhurst Mill’ dated 28 February 2025, ‘First Ore Intersected at Sand King’ released on 19 December 2024, ‘Davyhurst Gold Project Update’ dated 3 September 2024, ‘Riverina Underground & Sand King Update’ dated 4 April 2024, ‘New High Grade Lode System Discovered at Sand King’ dated 28 February 2024, ‘Exploration Update – Sand King’ dated 6 February 2024, ‘Exploration Update – Sand King’ dated 2 November 2023, ‘Exploration Update’ dated 3 August 2023, ‘High Grade Results for Sand King Validation Drill Program’ dated 27 April 2020, ‘Missouri Deposit Mineral Resource and Reserve Update’ dated 15 December 2016 , ‘Outstanding Siberia Drilling Results Continue’ dated 23 November 2016 , ‘High Grade Results Continue at Siberia’ dated 15 November 2016, ‘High Grade Results Continue at Siberia’ dated 2 November 2016,’Siberia Drilling Update’ dated 25 October 2016, ‘Significant Drilling Results from Siberia’ dated 22 September 2016 and ‘Strong Initial Results from Siberia Diamond Drilling’ dated dated 13 September 2016. Waihi: Strong New Drill Results at Riverina, Waihi & Little Gem’ dated 10 June 2025, ‘Further High Grade Assay Results for Waihi’ dated 21 January 2020, ‘High Grade Assay Results Continue at Waihi’ dated 24 December 2019, 22 November 2019 and 6 November 2019, ‘Shallow High Grade Results from Waihi Resource Drilling’ dated 14 October 2019‘, ‘High Grade Assay Results Received including 23m@9.1g/t Au’ dated 29 July 2019, and ‘Impressive Results from Initial Drilling at Waihi Complex’ dated 22 February 2017. Little Gem: ‘High Grade, Multi-Lode System Expanded to over 1km Strike at Little Gem’ dated 30 July 2025, ‘Strong New Drill Results at Riverina, Waihi & Little Gem’ dated 10 June 2025, ‘Exploration Results at Little Gem’ dated 19 March 2025, ‘Outstanding Results at Little Gem Confirm Greenfields Discovery’ dated 13 March 2025 For personal use only
Page 26
26 Endnotes 1. Refer to ASX announcement, ‘Annual Mineral Resource and Ore Reserve Statement’ dated 2 July 2024 2. Refer to ASX announcement, “Balance sheet strengthens with $50m Revolving Credit Facility & Purchase of Put Options at $4,400/oz” dated 7 March 2025 3. Refer to ASX announcement, ‘Sand King Approval Lifts FY26 Production Outlook to 150koz’ dated 11 July 2024 4. Refer to ASX announcement, ‘Successful Exploration Drilling at Riverina Paves the Way for Multi- year Mine Life Extension’ dated 13 February 2025 5. Refer to ASX announcement, ‘March 2025 – Quarterly Activities Report’ dated 30 April 2025 6. Refer to ASX announcements, ‘December 2024 – Half Year Results’ dated 26 February 2025, and the Company’s Appendix 4D: Half Year Report for the Period Ended 31 December 2024 and Condensed Consolidated Interim Financial report for the Half year Ended 31 December 2024, released on 26 February 2025 7. Refer to ASX announcement, ‘December 2024 – Quarterly Activities Report’ dated 16 January 2025 8. Refer to ASX announcement, ‘Sand King Underground Ramp Up On Track with First Ore Batched Through Davyhurst Mill’ dated 28 February 2025 9. Historical production figures sourced from internal Company records (updated from Monarch Gold 2008) 10. Refer to ASX announcement, ‘Outstanding Exploration Results at Little Gem’ dated 13 March 2025 11. Refer to ASX announcement ‘Exploration Results at Little Gem’ dated 19 March 2025 12. Refer to ASX announcement, ‘June 2025 Quarterly Activities Report’ dated 29 July 2025, and ‘FY25 Production Results & FY26 Guidance’ dated 11 July 2025 13. Refer to ASX announcement ‘Strong New Drill Results at Riverina, Waihi & Little Gem’ dated 10 June 2025 14. Refer to ASX announcement ‘High Grade, Multi-Lode Gold System Expanded to Over 1KM Strike at Little Gem’ dated 30 July 2025 For personal use only
Page 27
ORABANDAMINING.COM.AU Contact details LUKE CREAGH Managing Director +61 8 6365 4548 admin@obmltd.com.au For personal use only