This presentation contains only a brief overview of Regis Resources Limited and its associated entities (“Regis or RRL”) and their respective activities and operations. The contents of this presentation, including matters relating to the geology of Regis’ projects, may rely on various assumptions and subjective interpretations which it is not possible to detail in this presentation and which have not been subject to any independent verification. This presentation contains a number of forward-looking statements that are subject to risk factors associated with gold exploration, mining and production businesses. It is believed that the forward looking statements in this presentation are reasonable based on information available as at the date of this presentation but known and unknown risks and uncertainties, and factors outside of Regis’ control, may cause the actual results, performance and achievements of Regis to differ materially from those expressed or implied in this presentation. These risk factors include, but are not limited to, changes in commodity prices, foreign exchange fluctuations and general economic conditions, increased costs and demand for production inputs, the speculative nature of exploration and project development, including the risks of obtaining necessary licenses and permits and diminishing quantities or grades of reserves, political and social risks, changes to the regulatory framework within which the Company operates or may in the future operate, environmental conditions including extreme weather conditions, recruitment and retention of personnel, industrial relations issues and litigation. Readers are cautioned not to place undue reliance on forward looking statements. No representation or warranty, express or implied is made as to the accuracy, currency or completeness of the information in this presentation, nor the future performance of Regis. Except as required by applicable law or regulations, Regis does not undertake to publicly update or review any forward-looking statements, whether as a result of new information or future events. Current and potential investors and shareholders should seek independent advice before making any investment decision in regard to Regis or its activities. Mineral Resources, Ore Reserves and Exploration Results are extracted from the Mineral Resource and Ore Reserve Statement released to the ASX on 22 April 2026 and 19 June 2026, and Exploration Results updated on 26 June 2026 (the Relevant ASX Announcements). For Duketon, figures on slides 12-13 are based on Probable Ore Reserves, which have been prepared by competent persons in accordance with the JORC Code. For Tropicana, no production target is provided. In each case, appropriate Competent Person’s consents were obtained for the release of that information in the Relevant ASX Announcements and those consents remain in place for subsequent releases by the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent. The Company confirms that it is not aware of any new information or data that materially affects the information included in the Relevant ASX Announcements and in each case the Production Targets, forecast financial information and estimates of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning that information in the Relevant ASX Announcements, continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original ASX announcement. This presentation uses Mineral Reserves and Mineral Resources classification terms that comply with reporting standards in Australia. These standards differ significantly from the requirements of the United States Securities and Exchange Commission that are applicable to domestic United States reporting companies and, therefore, are not comparable. Past performance and pro-forma financial information given in this document, including in relation to upgrades to resources and reserves, is given for illustrative purposes only and should not be relied upon as (and is not) an indication of future performance, nor of Regis’ views on the Company’s future financial performance or condition. Investors should note that past performance of Regis, including the historical trading prices of its shares, cannot be relied upon as an indicator of and provides no guidance as to Regis’ future performance, including the future trading price of its shares. The historical information included in this presentation is, or is based on, information that has previously been released to the market. As noted above, an investment in Regis shares is subject to known and unknown risks, some of which are beyond the control of Regis. Regis does not guarantee any particular rate of return or the performance of the Company, nor does it guarantee the repayment of capital from Regis or any particular tax treatment. The distribution of this presentation (including an electronic copy) outside of Australia (including the United States) may be restricted by law and any such restrictions should be observed. Any non-compliance with these restrictions may contravene applicable securities laws. References to Tropicana are at 30% ownership unless otherwise noted. Regis is an Australian company which reports in AUD. ASX announcements are available on the Company’s website at www.regisresources.com.au. Cautionary statement 2
Page 3
Exploration Target at Ben Hur (noted on Slide 16) is extracted from ASX release “Underground Exploration Target Established for Ben Hur” dated 21 November 2024. The Ben Hur Exploration Target is estimated to contain between 4.0Mt and 6.0Mt at a grade ranging between 2.2 g/t Au and 2.8 g/t Au across the deposit. The Exploration Target area includes potential down plunge extensions of the current open pit mineralisation with a 500m vertical extent from 400m RL to -100m RL. The information that relates to Mineral Resource Estimates and Exploration Targets, as those terms are defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’, is based on information compiled or reviewed by Mr Robert Barr, who is a member of the Australasian Institute of Mining and Metallurgy (AusIMM Member #991808). Mr Barr is a full-time employee of the Company. Mr Barr has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Barr consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. The potential quantity and grade of the Exploration Targets are conceptual in nature and therefore is an approximation. There has been insufficient exploration to estimate a Mineral Resource across the full Exploration Target area, and it is uncertain if further exploration will result in the estimation of a Mineral Resource. Drilling is ongoing. The Exploration Target has been prepared and reported in accordance with JORC Code 2012. The Exploration Targets have been reasonably defined based on a review of the deposits using existing data, including drill hole databases, geophysical data sets and Mineral Resource Estimate (MRE) data. The drill data shown as gram- metre intervals was used to assist in defining the volumes used to quantify the Exploration Targets. The Exploration Target mineralised zones are constructed to form a volume for block model estimation with the same parameters as the Garden Well, and Rosemont underground resources. Tonnage estimates are generated by applying bulk densities from the Garden Well, Rosemont and Ben Hur deposit and underground mining shapes assume the same mining methods and cost structure as for the Garden Well South and Rosemont underground operations. To mitigate the risk and further evaluate the Exploration Targets, high-level drill program have commenced and are ongoing. The drilling to date has begun to test the initial target area with results supporting the assumptions behind the Exploration Targets. ASX announcements are available on the Company’s website at www.regisresources.com.au. Exploration Targets 3 The table below is a listing of the names of the Competent Persons who are taking responsibility for reporting Regis’ results and estimates. This Competent Person listing includes details of professional memberships, professional roles, and the reporting activities for which each person is accepting responsibility for the accuracy and veracity of Regis’ results and estimates. Each Competent Person in the Table below has provided Regis with a sign-off for the relevant information provided by each contributor in this report. MAIG = Member of the Australian Institute of Geoscientists • All Regis Resources personnel are full-time employees of Regis Resources Limited; • The Competent Persons have provided Regis with written confirmation that they have sufficient experience that is relevant to the styles of mineralisation and types of deposits, and the activity being undertaken with respect to the responsibilities listed against each professional above, to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves – the JORC Code 2012 Edition • Each Competent Person listed above has provided to Regis by e-mail: − Proof of their current membership to their respective professional organisations as listed above; − A signed consent to the inclusion of information for which each person is taking responsibility in the form and context in which it appears in this report, and that the respective parts of this report accurately reflect the supporting documentation prepared by each Competent Person for the respective responsibility activities listed above; and − Confirmation that there are no issues that could be perceived by investors as a material conflict of interest in preparing the reported information. Beamish South is a part of Regis Duketon South Operations, and is not considered a Material Mining Project (as defined in the JORC Code 2012 Edition or the ASX Listing Rules Chapter 19.12) on a stand-alone. The initial Mineral Resource Estimate at Beamish South is not considered to be a material change to the previously announced Duketon South Resource Estimate. Activity Competent Person Professional Association Company of Employment Activity Responsibility Membership Number Exploration Robert Henderson MAIG 4031 Regis Resources Beamish South Exploration Results Beamish South Exploration
Page 4
4 Regis Resources The Golden Opportunity
Page 5
Duketon McPhillamys Tropicana • FY27 production guidance: 240koz - 270koz • FY27 AISC guidance: $3,100 - $3,550/oz • Mineral Resources1: 4.0Moz • Ore Reserves1: 1.4Moz • Project re-set underway. • Mineral Resources1: 2.3Moz • Ore Reserves1: 1.9Moz @1.1g/t • FY27 production guidance: 120koz - 130koz • FY27 AISC guidance: $2,630 – $2,950/oz • Mineral Resources1: 1.6Moz • Ore Reserves1: 0.6Moz 4.0 Moz Resource 1.6 Moz Resource 2.7 Moz Resource Total Resources1 8.3Moz 3.9MozTotal Reserves1 WA DUKETON McPHILLAMYS NSW TROPICANA 5 Unhedged, Dividend Paying Producer With Long Life Assets 1. ASX release titled “Mineral Resource and Ore Reserves and Exploration Update” dated 22 April 2026 and “New McPhillamys PFS Supports Reinstatement of Ore Reserve” dated 19 June 2026. Errors of summation may occur due to rounding. Tropicana shown on a 30% basis. See full Resource and Reserve Tables in Appen dix 1 of this announcement for more detail.
Page 6
-$5M $80M $229M $367M $517M $675M $930M $1,130M $1,184M Jun-24 Sep-24 Dec-24 Mar-25 Jun-25 Sep-25 Dec-25 Mar-26 Jun-26 Cash & Bullion (Million) 151 Delivering and Building Cash Underpins Capital Policy +$85M +$49M +$138M 1. Cash and bullion build before $300m debt repayment in January 2025. 2) Unaudited, after $92M tax payment. Note – figures may not sum due to rounding +$150M +$158M +$255M +$198M2 +$54M $38M Dividend Paid $114M Dividend Paid ~$1.2 BILLION cash build1 in the last 24 months since June 2024 AFTER • Resumption of tax payments March ’26 qtr and • Dividend payments totalling ~$152M in last 12 months 6
Page 7
7 FY26 – Consistent Performance, Strong Cash Build & Dividends Production of 379koz - top end of guidance(350-380koz) - all other metrics in guidance. Cash and bullion to ~$1.2B, increasing $667M after dividends and tax. ~$152M in fully franked dividends and $156M tax paid in the year. McPhillamysPFS1 confirms a robust project - reinstates 1.9Moz @ 1.1g/t Ore Reserves. Continuing Exploration success and underground growth projects: • Anotheryear of increasing Reserves and Resources at our operations • Mineral Resources2 up 10% YoY to 8.3Moz @ 1.2g/t • Mineral Reserves2 up 20% YoY to 2.0Moz @ 1.2g/t Total Group Mineral Reserves 3.9Moz3. 1. ASX release titled “New McPhillamys PFS Supports Reinstatement of Ore Reserve” dated 19 June 2026. 2. ASX release titled “Mineral Resource and Ore Reserves and Exploration Update” dated 22 April 2026. 3. Combined Duketon, Tropicana and McPhillamys Reserves, see notes 1 & 2 for references and Reserve table in the appendix of thi s presentation for Reserve category breakdown.
Page 8
8 1. Group FY27 AISC includes ~$88/oz of non-cash costs related to stockpile value adjustments. FY27 Guidance – Growth Delivery Today. Leveraging sensible opportunistic ounces to maximise cash generation. FY27 Guidance Group Duketon Tropicana Production (koz) 360 – 400 240 – 270 120 – 130 AISC ($/oz) 2,990 – 3,3901 3,100 – 3,550 2,630 – 2,950 Growth Capital ($M) 250 – 270 235 – 245 15 - 25 Exploration ($M) 80 – 90 - - McPhillamys ($M) 30 – 35 - - 120-130koz 240-270kozDuketon Tropicana 360-400koz
Page 9
9 BuckWellOpen Pit1 – adding incremental value from “higher cost ounces” • Within the MoolartWell footprint at Duketon North. • Adjacent to existing idled infrastructure including ~2.5mtpa mill. Key metrics: • Ore Reserve of 8.8Mt at 0.89g/t Au for 251koz gold2. • Delivers 223koz –over 5.7 years. • Growth Capital $80M split over 2 years with $59M max capital draw. • Average AISC of $3,524/oz • $268M pre-tax NPV5.6%. IRR of 127%. @ $5,387/oz3 1. ASX release titled “Regis Extends Duketon North Operation Through More Organic Growth” released on 13 Nov 2025. 2. Reported within Duketon North Open Pit Ore Reserve – see table at the end of this presentation for Ore Reserve categories. 3. Average realised gold price of $5,387/oz calculated based on revenue generated using consensus pricing over the production period divided by total production. Crystalising Opportunistic Organic Growth - Now The Regis team continues to identify new discovery ounces AND Exploit opportunistic ounces to create value organically. Buckingham Wellington Processing Plant Camp
Page 10
10 Producing sustainable and profitable ounces Baseload production growth plan continues PLUS opportune near- term ounces 1. Long term aspirational target at Duketon, assuming no new open pit discovery. 2. Regis 30% attributable production during open pit and underground phase. 3. See ASX Announcement “Mineral Resource and Ore Reserve Update” 22 April 2026. 4. See ASX announcement “Stronger Production Outlook Lifts FY27 Guidance” 17 July 2026. 125-1452koz p.a. 200-2501koz p.a. Duketon Tropicana Ramp up third underground mine (Garden Well Main) Enhance core underground production with opportunistic, cash positive ounces (e.g. Buckwell at Duketon North) Continued Underground Reserve replacement3 • Grow to at least four underground mines (in progress) Progress development of the Havana Underground Test for and seek to develop new UG production zones Continued Underground Reserve Replacement3 We continue to focus on producing sustainable and profitable ounces from our current assets Executing our Strategy 240-270koz 120-130koz FY264 360-400koz Delivering more
Page 11
11 Delivering The Value Growth Strategy Organically Exploration and Discovery
Page 12
12 Exploration and Discovery – A history of delivering at Duketon Consistently delivering value accretion from discovery. Note: Duketon Ore Reserve figures are reported as at 31 December of each year Cumulative Duketon Mining Depletion is reported as contained ounces in mill feed for each calendar. Regis annual reports can be accessed at https://www.regisresources.com.au/investors/presentations- reports/ * 2025 Duketon Mining Depletion figure is based on Duketon reported ounces processed to 31 December 2025. See Regis Quarterly Reports 30 Sept and 31 Dec. 2025 for interim production figures. 1,400 950 798 1,082 1,389 371 697 973 1,235 0 500 1,000 1,500 2,000 2,500 3,000 2021 2022 2023 2024 2025* koz Au Duketon Ore Reserves Cumulative Duketon Mining Depletion
Page 13
1. Ore Reserves and depletion is based on calendar year, calculated at 31 December annually. Please see www.regisresources.com and www.anglogoldashanti.com for further details on Ore Reserves. 2. ASX release “Mineral Resource and Ore Reserve Update” 22 April 2026. ~850% increase in underground Ore Reserves1 at Duketon including depletion of 475koz of gold since 2019 Delivering production sustainability Multiple operating mining centres at Duketon with consistent Reserves growth 2 13 Continuing to Build Sustainable Underground Capacity Mineralisation open Commenced commercial production Q3 FY26 Mineralisation open On track: Q4 FY27e commercial production
Page 14
14 Exploration continues to deliver • Beamish South Resource (270koz) declaredwith drilling ongoing. • Garden Well mineralisation confirmed 500m down plunge of current resources; • Rosemont Stage 3 intersections confirm host unit extends ~300m south of current designs; 1. See ASX release titled “Mid Year Exploration Update”, 26 June 2026.
Page 15
15 Discovery “under the head frame” Beamish South - Resource (270koz) declared1 with drilling ongoing2 1. See ASX release titled “Mid Year Exploration Update”, 26 June 2026. 2. See Slides 28 and 29 in the Appendix of this release for full details of drilling results received since the 26 June 2026 report, including the selected new drill hole details shown here. NOTE: Beamish South is not considered a Material Mining Project on a stand-alone basis and forms part of the Duketon South Project. Section A-A Section B-B A A B B Optimisation Shell
Page 16
16 Initial underground Resource outlines what could become our next underground mine Ben Hur – Our Next Underground Development? Exploration Target area 2024 Exploration Target2: Tonnage: 4.0Mt - 6.0Mt Grade: 2.2g/t - 2.8g/t Contained gold: 300koz – 550koz 1. Total UG Resource comprises 1.5Mt @ 2.3g/t for 113.1Moz Measured and 1.6Mt @2.44g/t for 126Moz Indicated. See ASX release titled “Mineral Resource and Ore Reserves Update” dated 22 April 2026. 2. See ASX release titled “Underground Exploration Target Established for Ben Hur” dated 21 November 2024. 2026 Initial UG Resource1: Tonnage: 3Mt Grade: 2.4g/t Contained gold: 240koz
Page 17
317 313 309 333 378 661 641 851 42 144 273 450 648 808 0 200 400 600 800 1,000 1,200 1,400 1,600 1,800 2018 2019 2020 2021 2022 2023 2024 2025 UG Ore Reserves (koz) Cumulative Underground Ore Reserve Depletion (koz) 169% increase in Tropicana underground Ore Reserves1,2, excluding production of 808koz of gold, since 20183 Boston Shaker Initial UG Reserve Ore Reserves have grown consistently, exploration ongoing to extend mineralisation 1. Ore Reserves and depletion is based on calendar year. Please see www.regisresources.com and www.anglogoldashanti.com for further details on Ore Reserves. 2. On 100% basis for Ore Reserves. 3. Completion of Regis acquisition of 30% of Tropicana on 31 May 2021. Exploration image taken from ASX Release titled “Mid Year Exploration Update”, 26 June 2026. Drilling data span Nov. 2025 to May 2026. koz Gold 17 Tropicana Underground - More Value Than Just Reserves Sitewide cumulative UG production now 2.5x the initial Boston Shaker UG Reserve AND Sitewide UG Ore Reserve now 2.7x the initial Boston Shaker UG Reserve
Page 18
18 Tropicana - Regional Exploration • Regional exploration continues with the primary aim of discovering satellite resources. • Regional exploration strategy to focus within 20km of the mill along trend north and south of the current operation. • Encouraging intersections have been delivered from the north of Tropicana, namely; - The Northern Corridor; - Rosetta; and - Hat Trick. • Future follow-up exploration activities will be informed by the results to date. Searching for satellite open pit resources Rosetta Springbok Boston Shaker Havana Tropicana Hat Trick Havana South
Page 19
19 Outlook
Page 20
20 1. See ASX release titled “New McPhillamys PFS Supports Reinstatement of Ore Reserve”, 19 June 2026. 2. See ASX release titled “Mineral Resource and Ore Reserves and Exploration Update”, 22 April 2026. 3. See ASX release titled “Mid Year Exploration Update”, 26 June 2026. 4. See ASX releases dated 19 August 2024 and 21 August 2024 for further detail on the Section 10 Declaration and its impacts on the McPhillamys Project. McPhillamys – 1.9Moz Reserve PFS1 outlines alternative tailings strategy: • NPV5.5% $2.1 billion & IRR 21.8% (after tax, at A$4000/oz) ~10 years production - average 190koz p.a. & peak of 239koz p.a. • Initial Capex $1.08b and LOM AISC of $1,718/oz. With more value to be found… • Discovery Ridge - 8Mt at 1.5 g/t for 400 koz Au2. • Recent drilling confirms Gold mineralisation to a depth of at least 180m at Kings Plains (less than 2km from McPhillamys)3. • Significant exploration potential within a highly endowed region. Refreshed PFS underscores the scale of the opportunity Judicial review of Section 10 Declaration4 remains before the Federal Court and while the original TSF development remains the preferred pathway, Regis has a plan for either outcome.
Page 21
211. Group FY27 AISC includes ~$88/oz of non-cash costs related to stockpile value adjustments. FY27 Guidance – Delivering Steady Growth – Today. Leveraging opportunistic ounces to maximise cash generation FY27 Guidance Group Duketon Tropicana Production (koz) 360 – 400 240 – 270 120 – 130 AISC ($/oz) 2,990 – 3,3901 3,100 – 3,550 2,630 – 2,950 Growth Capital ($M) 250 – 270 235 – 245 15 - 25 Exploration ($M) 80 – 90 - - McPhillamys ($M) 30 – 35 - - 120-130koz 240-270kozDuketon Tropicana 360-400koz
Page 22
22 Capital Management Capital management policy1 provides the framework for: • Dividend returns • Potential share buyback transactions Dividends2 • FY26 saw fully franked dividend payments of ~$152M • Regis has now returned ~$700M to shareholders through dividends Continue to focus on disciplined capital allocation, balancing: • Investment in value-accretive growth • Balance sheet strength • Returns to shareholders 1. Refer to ASX release “New Capital Management Policy” 19 February 2026 2. Refer to ASX Release “Half Yearly Report and Accounts” 19 February 2026 Capital Management Policy “Striking an appropriate balance between ongoing investment and shareholder returns.”
Page 23
23 Regis spotless balance sheet with $1.2 Billion cash and bullion1 - delivered in 24 months Clear ongoing cash generating capacity Reinstated dividends, now paid ~$700M fully franked to shareholders since 2013. Exploiting sensible opportunistic ounces to increase free cashflow and add real value now Delivering significant value growth through incremental discovery • Ongoing Underground Reserves extension • New Open Pit Reserves • Building an Exploration pipeline to production Established a new permitting pathway for 1.9Moz at McPhillamys project Regis Resources - The Golden Opportunity 1. Unaudited, Net cash and bullion build before $300m debt repayment in January 2025. While continuing to seek out Inorganic Value Accretive opportunities. Unhedged, debt free & delivering consistent operational performances that deliver yield returns
Page 24
For further information: Mathew Collings Head of Investor Relations +61 8 9442 2200 enquiries@regisresources.com
Page 25
25 Appendix
Page 26
Group Ore Reserves as at 31 December 2025 (Attributable) Project Equity Type Proved Probable Total Ore Reserve Tonnes (Mt) Gold Grade (g/t) Gold Metal (koz) Tonnes (Mt) Gold Grade (g/t) Gold Metal (koz) Tonnes (Mt) Gold Grade (g/t) Gold Metal (koz) Duketon North 100% Open-Pit - - - 15 0.9 423 15 0.9 423 Duketon North 100% Stockpiles 1 0.5 9 - - - 1 0.5 9 Duketon North 100% Sub Total 1 0.5 9 15 0.9 423 16 0.8 433 Duketon South 100% Open-Pit - - - 4 1.1 141 4 1.1 141 Duketon South 100% Underground 0 1.6 12 12 1.8 702 12 1.8 714 Duketon South 100% Stockpiles 5 0.6 101 - - - 5 0.6 101 Duketon South 100% Sub Total 5 0.7 113 16 1.6 843 22 1.4 957 Duketon 100% Total 6 0.6 123 32 1.2 1,267 38 1.1 1,389 Tropicana 30% Open-Pit 1 1.4 28 4 1.8 213 4 1.7 241 Tropicana 30% Underground 1 2.8 121 1 2.9 134 3 2.9 255 Tropicana 30% Stockpiles 5 0.5 79 - - - 5 0.5 79 Tropicana 30% Total 6 1.1 229 5 2.1 347 12 1.5 576 Regis Total Total 12 0.9 351 37 1.4 1,614 49 1.2 1,965 Regis Group Ore Reserves Table The above data has been rounded, and errors of summation may occur due to rounding. Regis Mineral Resources and Ore Reserves shown as at 31 December 2025 (refer to ASX release titled “Mineral Resource and Ore Reserve Update” dated 22 April 2026), except McPhillamys which is shown as 31 May 2026 (refer to ASX release titled “New McPhillamys PFS Supports Reinstatement of Ore Reserve” dated 19 June 2026. 26 Project Equity Type Proved Probable Total Ore Reerve Tonnes (Mt) Gold Grade (g/t) Gold Metal (koz) Tonnes (Mt) Gold Grade (g/t) Gold Metal (koz) Tonnes (Mt) Gold Grade (g/t) Gold Metal (koz) McPhillamys 100% Open-Pit - - - 56 1.1 1,890 56 1.1 1,890 McPhillamys 100% Total - - - 56 1.1 1,890 56 1.1 1,890 Regis Total Total - - - 56 1.1 1,890 56 1.1 1,890 McPhillamys Ore Reserves as at 31 May 2026
Page 27
Group Mineral Resources as at 31 December 2025 (Attributable) Project Equity Type Measured Indicated Inferred Total Resource Tonnes (Mt) Gold Grade (g/t) Gold Metal (koz) Tonnes (Mt) Gold Grade (g/t) Gold Metal (koz) Tonnes (Mt) Gold Grade (g/t) Gold Metal (koz) Tonnes (Mt) Gold Grade (g/t) Gold Metal (koz) Duketon North 100% Open-Pit - - - 39 0.9 1,140 9 0.8 250 49 0.9 1,390 Duketon North 100% Stockpiles 1 0.5 10 - - - - - - 1 0.5 10 Duketon North 100% Sub Total 1 0.5 10 39 0.9 1,140 9 0.8 250 49 0.9 1,400 Duketon South 100% Open-Pit 0 1.1 - 25 1.2 940 5 1.2 200 30 1.2 1,150 Duketon South 100% Underground 2 2.6 200 12 2.3 870 4 2.2 270 18 2.3 1,340 Duketon South 100% Stockpiles 6 0.5 110 - - - - - - 6 0.5 110 Duketon South 100% Sub Total 9 1.1 310 37 1.5 1,810 9 1.6 470 55 1.5 2,590 Duketon 100% Total 9 1.1 320 77 1.2 2,950 18 1.2 720 104 1.2 3,990 Tropicana 30% Open-Pit 1 1.4 30 4 1.9 220 - - - 4 1.8 250 Tropicana 30% Underground 4 2.6 350 5 2.7 400 7 2.2 530 16 2.4 1,280 Tropicana 30% Stockpiles 6 0.5 100 - - - - - - 6 0.5 100 Tropicana 30% Total 11 1.4 480 8 2.3 620 7 2.2 530 26 1.9 1,620 McPhillamys 100% Open-Pit - - - 61 1.0 2,070 8 0.7 190 70 1.0 2,260 Discovery Ridge 100% Open-Pit - - - 2 1.8 140 6 1.4 260 8 1.5 400 NSW 100% Total - - - 64 1.1 2,210 14 1.0 460 78 1.1 2,660 Regis Total Total 20 1.2 790 149 1.2 5,780 40 1.3 1,700 209 1.2 8,280 Regis Group Mineral Resources Table Summation errors may occur due to rounding. Regis Mineral Resources have been rounded to the nearest 1,000,000 tonnes, 0.1 g/t gold grade and 10,000 ounces. Mineral Resources are reported inclusive of Ore Reserves. Regis Mineral Resources and Ore Reserves shown as at 31 December 2025 (refer to ASX release titled “Mineral Resource and Ore Reserve Update” dated 22 April 2026). Mineral R esources and Ore Reserves are reported inclusive of ore stockpiles. 27
Page 28
Beamish South Drill Table 28 Hole ID Project Y X Z Dip Azi. Total Depth (m) From (m) To (m) Int. (m) Au ppm RRLBMMB001 Beamish South 6906892 437166 500 -90 0 124 11.0 12.0 1.0 0.5 RRLBMMB001 Beamish South 6906892 437166 500 -90 0 124 18.0 23.0 5.0 0.6 RRLBMMB001 Beamish South 6906892 437166 500 -90 0 124 43.0 44.0 1.0 0.4 RRLBMMB001 Beamish South 6906892 437166 500 -90 0 124 55.0 57.0 2.0 0.7 RRLBMMB002 Beamish South 6906893 437186 500 -90 0 93 24.0 26.0 2.0 0.6 RRLBMMB002 Beamish South 6906893 437186 500 -90 0 93 64.0 70.0 6.0 0.5 RRLBMMB003 Beamish South 6908039 438500 500 -90 0 180 No Significant Interval RRLBMMB004 Beamish South 6908038 438486 500 -90 0 180 No Significant Interval RRLBMMB005 Beamish South 6906755 438032 514 -90 1 154 No Significant Interval RRLBMMB006 Beamish South 6906760 438044 514 -90 0 154 No Significant Interval RRLBMMB007 Beamish South 6906732 437934 514 -88 309 154 No Significant Interval RRLBMMB008 Beamish South 6906729 437933 514 -88 271 154 104.0 108.0 4.0 0.5 RRLBMMB009 Beamish South 6907344 437893 500 -89 247 154 No Significant Interval RRLBMMB010 Beamish South 6907537 437791 500 -89 256 154 128.0 133.0 5.0 0.9 RRLBMMB010 Beamish South 6907537 437791 500 -89 256 154 137.0 148.0 11.0 0.9 RRLBMMB011 Beamish South 6908374 438303 514 -89 106 154 No Significant Interval RRLBMMB013 Beamish South 6907622 436756 514 -83 264 154 No Significant Interval RRLBMMB014 Beamish South 6907923 436667 514 -88 282 154 No Significant Interval RRLBMRC399 Beamish South 6907932 437139 503 -60 270 120 64.0 67.0 3.0 2.7 RRLBMRC399 Beamish South 6907932 437139 503 -60 270 120 118.0 119.0 1.0 3.0 RRLBMRC400 Beamish South 6907829 437125 504 -60 270 106 35.0 39.0 4.0 0.5 RRLBMRC401 Beamish South 6907820 437200 504 -60 270 148 91.0 92.0 1.0 0.5 RRLBMRC401 Beamish South 6907820 437200 504 -60 270 148 138.0 139.0 1.0 2.6 RRLBMRC402 Beamish South 6907820 437279 505 -60 270 130 No Significant Interval RRLBMRC403 Beamish South 6907932 437222 504 -60 270 172 171.0 172.0 1.0 0.5 RRLBMRC404 Beamish South 6907930 436757 501 -60 270 184 No Significant Interval RRLBMRC405 Beamish South 6907919 436846 503 -60 270 202 No Significant Interval RRLBMRC406 Beamish South 6907930 436927 501 -60 271 202 No Significant Interval Hole ID Project Y X Z Dip Azi. Total Depth (m) From (m) To (m) Int. (m) Au ppm RRLBMRC407 Beamish South 6907942 437025 502 -60 271 202 No Significant Interval RRLBMRC408 Beamish South 6908130 436950 504 -60 271 166 No Significant Interval RRLBMRC409 Beamish South 6908130 436875 503 -60 271 184 177.0 178.0 1.0 0.5 RRLBMRC410 Beamish South 6908130 436800 502 -60 271 154 No Significant Interval RRLBMRC411 Beamish South 6908115 436725 501 -60 271 172 No Significant Interval RRLBMRC412 Beamish South 6908115 436650 500 -60 271 166 No Significant Interval RRLBMRC413 Beamish South 6908380 436775 504 -60 270 226 No Significant Interval RRLBMRC414 Beamish South 6907921 436668 500 -60 270 184 No Significant Interval RRLBMRC415 Beamish South 6908385 436704 503 -60 270 160 No Significant Interval RRLBMRCD330 Beamish South 6907349 437349 507 -60 0 252 169.2 169.9 0.7 1.2 RRLBMRCD330 Beamish South 6907349 437349 507 -60 0 252 173.4 173.8 0.3 18.4 RRLBMRCD330 Beamish South 6907349 437349 507 -60 0 252 181.9 182.3 0.4 1.0 RRLBMRCD330 Beamish South 6907349 437349 507 -60 0 252 189.3 190.0 0.7 1.1 RRLBMRCD330 Beamish South 6907349 437349 507 -60 0 252 193.0 194.0 1.0 1.4 RRLBMRCD330 Beamish South 6907349 437349 507 -60 0 252 196.4 211.7 15.3 0.7 RRLBMRCD331 Beamish South 6907438 437389 507 -60 271 295 209.0 212.0 3.0 1.6 RRLBMRCD331 Beamish South 6907438 437389 507 -60 271 295 216.8 247.0 30.2 2.0 RRLBMRCD331 Beamish South 6907438 437389 507 -60 271 295 278.0 279.0 1.0 0.4 RRLBMRCD332 Beamish South 6907349 437388 507 -60 271 273 196.0 199.0 3.0 0.6 RRLBMRCD332 Beamish South 6907349 437388 507 -60 271 273 205.8 206.4 0.6 0.7 RRLBMRCD332 Beamish South 6907349 437388 507 -60 271 273 220.0 226.7 6.7 1.2 RRLBMRCD332 Beamish South 6907349 437388 507 -60 271 273 229.7 238.0 8.4 0.9 RRLBMRCD334 Beamish South 6907349 437430 508 -60 271 306 231.8 233.2 1.4 3.1 RRLBMRCD334 Beamish South 6907349 437430 508 -60 271 306 235.3 239.0 3.7 0.8 RRLBMRCD334 Beamish South 6907349 437430 508 -60 271 306 258.1 267.2 9.1 1.1 RRLBMRCD334 Beamish South 6907349 437430 508 -60 271 306 270.0 275.0 5.0 0.5 RRLBMRCD350 Beamish South 6907250 437347 507 -60 271 244 149.0 150.0 1.0 0.5 RRLBMRCD350 Beamish South 6907250 437347 507 -60 271 244 173.1 175.5 2.5 0.5 Compositing Calculation: 0.4g/t Au lower cut, no upper cut, maximum 2m internal dilution
Page 29
Beamish South Drill Table Hole ID Project Y X Z Dip Azi. Total Depth (m) From (m) To (m) Int. (m) Au ppm RRLBMRCD350 Beamish South 6907250 437347 507 -60 271 244 183.5 185.0 1.5 2.1 RRLBMRCD350 Beamish South 6907250 437347 507 -60 271 244 188.2 196.2 8.0 1.2 RRLBMRCD350 Beamish South 6907250 437347 507 -60 271 244 208.0 208.5 0.5 0.4 RRLBMRCD352 Beamish South 6907249 437388 507 -60 0 282 189.5 190.2 0.7 0.5 RRLBMRCD352 Beamish South 6907249 437388 507 -60 0 282 216.0 222.9 6.9 0.9 RRLBMRCD354 Beamish South 6907479 437267 506 -60 273 189 119.8 120.5 0.7 0.4 RRLBMRCD354 Beamish South 6907479 437267 506 -60 273 189 123.4 126.6 3.2 1.1 RRLBMRCD354 Beamish South 6907479 437267 506 -60 273 189 132.0 133.0 1.0 1.3 RRLBMRCD354 Beamish South 6907479 437267 506 -60 273 189 136.3 146.0 9.7 1.4 RRLBMRCD354 Beamish South 6907479 437267 506 -60 273 189 151.0 158.5 7.5 1.2 RRLBMRCD355 Beamish South 6907149 437270 508 -60 271 210 91.7 92.0 0.4 0.8 RRLBMRCD355 Beamish South 6907149 437270 508 -60 271 210 105.9 106.3 0.4 0.6 RRLBMRCD355 Beamish South 6907149 437270 508 -60 271 210 108.0 112.6 4.6 0.5 RRLBMRCD355 Beamish South 6907149 437270 508 -60 271 210 126.5 127.5 1.0 5.2 RRLBMRCD355 Beamish South 6907149 437270 508 -60 271 210 131.0 132.0 1.0 0.7 RRLBMRCD355 Beamish South 6907149 437270 508 -60 271 210 136.5 140.4 3.9 0.5 RRLBMRCD355 Beamish South 6907149 437270 508 -60 271 210 145.8 149.0 3.2 0.8 RRLBMRCD355 Beamish South 6907149 437270 508 -60 271 210 204.0 205.0 1.0 0.5 RRLBMRCD356 Beamish South 6907479 437308 506 -60 270 220 156.8 161.0 4.3 1.0 RRLBMRCD356 Beamish South 6907479 437308 506 -60 270 220 166.2 179.7 13.5 25.9 Including 179.4 179.7 0.4 968.8 RRLBMRCD356 Beamish South 6907479 437308 506 -60 270 220 195.0 196.1 1.1 0.8 RRLBMRCD356 Beamish South 6907479 437308 506 -60 270 220 198.0 198.5 0.5 0.6 RRLBMRCD357W1 Beamish South 6907151 437308 508 -60 271 204 121.0 122.0 1.0 0.9 RRLBMRCD357W1 Beamish South 6907151 437308 508 -60 271 204 171.0 172.0 1.0 0.9 RRLBMRCD358 Beamish South 6907479 437347 506 -60 271 255 162.3 162.8 0.5 1.8 RRLBMRCD358 Beamish South 6907479 437347 506 -60 271 255 183.0 186.0 3.0 2.4 RRLBMRCD358 Beamish South 6907479 437347 506 -60 271 255 189.5 190.0 0.6 0.5 RRLBMRCD358 Beamish South 6907479 437347 506 -60 271 255 198.1 200.0 1.9 0.7 Hole ID Project Y X Z Dip Azi. Total Depth (m) From (m) To (m) Int. (m) Au ppm RRLBMRCD358 Beamish South 6907479 437347 506 -60 271 255 204.0 219.0 15.0 1.9 RRLBMRCD358 Beamish South 6907479 437347 506 -60 271 255 226.8 227.7 0.9 3.4 RRLBMRCD360W1 Beamish South 6907478 437385 506 -60 271 276 216.0 216.6 0.6 0.5 RRLBMRCD360W1 Beamish South 6907478 437385 506 -60 271 276 223.6 247.0 23.4 1.7 RRLBMRCD362W1 Beamish South 6907478 437424 506 -60 271 306 236.6 239.5 2.9 1.5 RRLBMRCD362W1 Beamish South 6907478 437424 506 -60 271 306 253.9 266.0 12.1 1.2 RRLBMRCD362W1 Beamish South 6907478 437424 506 -60 271 306 268.5 272.6 4.1 1.2 RRLBMRCD362W1 Beamish South 6907478 437424 506 -60 271 306 277.0 277.6 0.6 0.8 RRLBMRCD380 Beamish South 6907348 437465 508 -60 271 340 274.0 287.0 13.1 0.8 RRLBMRCD380 Beamish South 6907348 437465 508 -60 271 340 290.7 291.2 0.5 2.2 RRLBMRCD380 Beamish South 6907348 437465 508 -60 271 340 299.0 301.9 2.9 0.9 RRLBMRCD380 Beamish South 6907348 437465 508 -60 271 340 325.5 326.0 0.5 1.8 RRLBMRCD389W1 Beamish South 6907200 437428 508 -60 271 315 No Significant Interval RRLBMRCD393 Beamish South 6907479 437471 506 -60 271 352 275.6 277.8 2.2 1.6 RRLBMRCD393 Beamish South 6907479 437471 506 -60 271 352 296.5 307.0 10.5 1.8 Compositing Calculation: 0.4g/t Au lower cut, no upper cut, maximum 2m internal dilution