QUARTERLY ACTIVITIES REPORT – JUNE 2026 Highlights • Tabba Tabba DFS progressed , targeting improved project economics and earlier expansion to 4.5Mtpa. • DFS scope expanded aiming to include tantalum and petalite processing, enhancing future product streams. • Tabba Tabba Metallurgical testwork confirmed premium spodumene concentrate quality , producing 5.65% Li₂O concentrate with low iron. • Engineering, approvals and permitting advanced, with major technical workstreams well progressed. • Funding and offtake discussions progressed with financiers, government agencies and Tier -1 counterparties. • Bolt Cutter Central delivered excellent maiden metallurgical results , averaging 82.5% lithium recovery and 5.66% Li₂O concentrate. • Resource drilling at Bolt Cutter Central was completed, with resource modelling now underway. • Exploration and infill drilling returned multiple strongly mineralised intersections. Best results include: o BCDD007 • 7.1m @ 1.3% Li2O from 20.8m (est. true width) and, • 4.3m @ 1.4% Li2O from 29.9m (est. true width) o BCDD009 • 5.6m @ 1.6% Li2O from 149.9m (est. true width) o BCDD018 • 7.7m @ 1.1% Li2O from 7.4m (est. true width) o BCRC071 • 7.0m @ 1.1% Li2O from 7.0m (est. true width) o BCRC079 • 5.0m @ 1.4% Li2O from 65.0m (est. true width) • Exploration extended the Bolt Cutter Central mineralisation footprint and remains open in multiple directions, highlighting further growth potential beyond the current discovery. • Wildcat remains on track to deliver multiple catalysts in H2 2026 , including the Tabba Tabba DFS and a maiden Bolt Cutter Central Mineral Resource. • Cash at bank of $37.2M at 30 June 2026. Australian lithium developer and explorer Wildcat Resources Limited (ASX: WC8) ("Wildcat", "WC8" or "the Company") is pleased to present its Quarterly Activities Report for the period ending 30 June 2026. 29/7/2026
Page 2
2 ASX Announcement 29 July 2026 The June quarter represented another period of significant advancement for the Company's Pilbara lithium portfolio as development activities accelerated at the Tabba Tabba Project and exploration continued to unlock value at the nearby Bolt Cutter Central discovery. At Tabba Tabba, the Definitive Feasibility Study (DFS) progressed across all major technical disciplines including mine planning, metallurgy, process engineering, infrastructure design, environmental approvals and project financing. Optimisation work undertaken during the quarter identified opportunities to improve project economics through modifications to the proposed mine schedule, earlier expansion of processing capacity and incorporation of additional mineral resources that were not considered in the Preliminary Feasibility Study. Metallurgical programs continued to demonstrate robust concentrate quality and recoveries, while engineering design advanced toward completion. At Bolt Cutter Central, the Company achieved another important milestone with the completion of maiden metallurgical sighter testwork. Results demonstrated that mineralisation responds exceptionally well to the same conventional flotation process being developed for Tabba Tabba , reinforcing the potential for a common processing strategy across both projects. Resource definition drilling was completed during the quarter and geological modelling is now underway in preparation for a maiden Mineral Resource estimate. Exploration activities during the quarter continued to advance the Company's Bolt Cutter Central lithium discovery, located approximately 10km west of the Tabba Tabba Project. The focus of work shifted from initial discovery and footprint expansion toward resource definition and technical de -risking, with completion of both resource drilling and the maiden metallurgical testwork program. Exploration and Development Activities Tabba Tabba Project – Pilbara, Western Australia During the June quarter, Wildcat continued to make substantial progress toward completion of the DFS for the Tabba Tabba Project. Technical work advanced across all major disciplines including mine planning, metallurgy, process engineering, environmental approvals, infrastructure design and project financing. The DFS is scheduled for completion during H2 2026 and incorporates a number of significant technical refinements and optimisation studies beyond those considered in the Preliminary Feasibility Study (PFS) completed in July 2025. The DFS has adopted a broader project scope than the PFS through the inclusion of additional mineral resources and product streams. In addition to the spodumene -dominant Leia and Luke orebodies, engineering and economic evaluations are now incorporating the Company's tantalum resource at Tabba Tabba together with the Chewy, Han and Hutt pegmatites. The inclusion of these deposits is expected to improve utilisation of the Company's existing Mineral Resource inventory while creating opportunities to generate additional revenue through production of petalite and tantalum concentrates. The Company is also progressing with negotiations and discussions with various third parties in relation to approvals and consents required for development of the Tabba Tabba project. Mining and Mine Optimisation A significant focus throughout the quarter was optimisation of the life -of-mine schedule to improve early project economics and maximise project value. Evaluation of numerous scheduling scenarios to optimise production sequencing, underground development timing, processing plant expansion and ore delivery across the life of the operation is ongoing. Optimisation studies identified opportunities to accelerate development of the underground Luke orebody, allowing additional ore to be introduced into the processing schedule earlier than contemplated in the PFS. Studies are also assessing opportunities to advance commissioning of the Stage 2 expansion to 4.5Mtpa
Page 3
3 ASX Announcement 29 July 2026 processing capacity. Bringing forward this expansion has the potential to increase concentrate production earlier in the mine life while reducing deferred capital requirements associated with a later expansion strategy. The optimisation process has further focused on reducing pre -production waste movement and improving overall mining efficiencies without materially altering the project's development philosophy. Detailed mine design has continued for both the open pit and underground operations. Geotechnical assessments for the Leia open pit together with the Luke and Leia underground mining areas have now been substantially completed and continue to support the proposed mining methodologies outlined in the PFS. Underground design refinement has also evaluated alternative stope geometries and sequencing to improve mining productivity. Metallurgy and Process Development Metallurgical testwork remained a major focus throughout the quarter and continued to deliver encouraging outcomes across all proposed processing streams. Whole -of-ore flotation testing on representative master composites from the Leia and Luke orebodies has confirmed that high -quality spodumene concentrates can be consistently produced using the proposed processing flowsheet. Testwork focused on material from the first two years of scheduled production to build confidence in commissioning and ramp -up performance. Bulk flotation testwork on the Year 1 –2 composite produced a spodumene concentrate grading 5.65% Li ₂O with low iron content of 0.63% Fe ₂O₃, confirming its suitability for premium concentrate markets. Overall lithium recovery remained in line with PFS expectations, while further optimisation studies continue to refine reagent selection, water treatment strategies and flotation operating conditions. Extensive variability testing has also been undertaken using composite samples representing different mining stages, ore types and geological domains across the deposit. This work is providing increased confidence that the proposed processing flowsheet will perform consistently throughout the life of the operation while defining operational parameters required for future plant design. In parallel with spodumene focussed testwork , the Company advanced process development for the petalite and tantalum circuits, with mineralogical investigations, laboratory testwork and metallurgical studies confirming viable processing pathways for the Chewy, Han and Hutt Mineral Resources and strong tantalum recoveries from the Tabba Tabba pegmatite using conventional gravity separation. Engineering for a dedicated petalite facility has progressed to a PFS level, while the proposed tantalum circuit is expected to produce saleable tantalite concentrate, aiming to enhance project economics through diversified future revenue streams. Process Engineering and Infrastructure Engineering design activities advanced considerably during the quarter with engineering of the proposed spodumene process plant. A comprehensive review of the comminution circuit concluded that a two -stage crushing configuration provides the optimal balance between capital intensity, operating efficiency and long-term operating flexibility. The preferred expansion philosophy established during the PFS remains unchanged, with dual grinding and flotation trains providing flexibility to operate efficiently across varying lithium market conditions while simplifying future capacity expansion. Engineering also progressed across the broader Non-Process Infrastructure (NPI), including the mine workshops, fuel storage, accommodation village, administration facilities, utilities, explosive storage and supporting site services. Three -dimensional modelling of the processing facilities is now well advanced, with vendor engagement continuing for major equipment packages and capital cost estimation progressing toward completion (Figure 1).
Page 4
4 ASX Announcement 29 July 2026 Figure 1: Indicative General Site Layout – Processing and NPI Geotechnical investigations undertaken across the proposed plant site, access roads, tailings storage facility and supporting infrastructure identified no material constraints that would affect the planned project layout. These investigations will provide the design basis for detailed civil engineering as the project advances toward execution. Environmental Approvals Environmental and permitting activities continued to progress in line with the overall DFS schedule. Heritage surveys and environmental baseline investigations across the proposed development footprint are now substantially complete, providing the information required to support primary environmental approvals. Referrals under both the Western Australian Environmental Protection Act 1986 and the Commonwealth Environment Protection and Biodiversity Conservation Act 1999 were submitted during the quarter following completion of pre -referral engagement with the relevant government agencies. Submission of these applications is a major milestone as the Company continues progressing the approvals pathway for project development. Hydrogeological investigations, groundwater monitoring, flora and fauna surveys and environmental baseline studies have also continued to build a comprehensive understanding of the project area to support future secondary approvals and mine closure planning. Bolt Cutter Central Lithium Discovery – Pilbara, Western Australia Metallurgy test work During the quarter maiden sighter metallurgical testwork using diamond drill core collected from across the Harry pegmatite swarm demonstrated spodumene is recoverable from the Bolt Cutter Central lithium discovery. Three composite samples, representing ten separate spodumene -bearing pegmatite domains distributed throughout the initial discovery footprint , were processed using the same whole -of-ore flotation
Page 5
5 ASX Announcement 29 July 2026 flowsheet currently being advanced for the Tabba Tabba Definitive Feasibility Study. The results exceeded expectations, producing an average lithium recovery of 82.5% while generating an average spodumene concentrate grading 5.66% Li ₂O from three separate co mposite samples ( Figure 2). Importantly, these outcomes were achieved without project -specific optimisation, demonstrating a strong metallurgical correlation between the two deposits and providing confidence that conventional processing techniques will be applicable as development studies progress. Figure 2: Bolt Cutter Central Whole of Ore Flotation Results from composite samples BCM001 – BCM003. Exploration and infill drilling Resource definition drilling also continued to expand confidence in the mineralised system . Multiple high - grade lithium intersections were returned from both infill and extensional drilling, further confirming the continuity of the stacked pegmatite system. Drilling completed within the adjacent E45/5416 tenement successfully intersected additional lithium mineralisation approximately 1.2km east of the currently defined Bolt Cutter Central footprint. While early-stage in nature, these results demonstrate the broader fertility of the surrounding granodiorite host and reinforce the potential for additional discoveries across the wider Bolt Cutter Project. Following completion of the current RC drilling campaign, geological interpretation and resource modelling commenced during the quarter. This work incorporates geological logging, structural interpretation, assay data and geophysical information to support estimation of a maiden Mineral Resource. Interpretation of recent drilling has also refined the Company's understanding of the structural controls on mineralisation, providing improved targeting for future exploration and extension drilling. The Bolt Cutter Central discovery remains open in multiple directions, with both the Harry and Hermione pegmatite swarms continuing beyond the current drilling limits. Future work will focus on completion of the maiden Mineral Resource estimate, continued metallurgical optimisation using larger variability composites, and regional exploration targeting across the broader Bolt Cutter tenure.
Page 6
6 ASX Announcement 29 July 2026 Bolt Cutter Project – Mallina Basin, Pilbara, WA The Bolt Cutter Project is a large package of exploration tenements and applications. It encompasses the Tabba Tabba and Bolt Cutter Central projects and traverses the Mallina Basin District in the East and West Pilbara terranes (Figure 3). Bolt Cutter is prospective for lithium mineralised pegmatites, gold mineralisation and volcanogenic massive sulphide deposits. Significantly, much of the tenure is located proximal to the prolific Split Rock Supersuite granitoid rocks (these are thought to be a key component in the formation of LCT pegmatites in the Pilbara District). The Company’s geologists continue to systematically evaluate its Bolt Cutter tenure and undertake field reconnaissance, mapping work, geophysical surveys, geochemical sampling and prospectivity analysis. Land access is continually being progressed for key targets to maintain exploration momentum. Figure 3: Location of Tabba Tabba and the surrounding exploration tenements at quarter end. Pending Miscellaneous Leases or second-in-time applications are not displayed. Exploration rights may vary, with full details of tenure status and changes found in Appendix 1.
Page 7
7 ASX Announcement 29 July 2026 Corporate Activities Funding and Commercial Activities As technical work continued to de -risk the project, the Company also advanced discussions regarding project financing and future product marketing. Engagement commenced with a range of Australian and international commercial banks, specialist mining finance groups and government funding agencies to investigate funding options capable of supporting project construction. In parallel, the Company continued discussions with potential strategic partners and Tier -1 customers regarding offtake opportunities for future spodumene concentrate production. Market engagement remains encouraging, with strong interest reflecting both the quality of the Tabba Tabba resource and the significant progress achieved through the DFS. Cashflows for the Quarter As at 30 June 2026, Wildcat maintained a strong cash position of approximately $37.2M. During the quarter, total cash outflows comprised $3.3M for exploration and evaluation activities, $2.6M for project studies, approvals, community engagement and administration. Cash inflows during the quarter included $0.5M in interest income as well as $0.9M received from the conversion of options. Related party payments for the quarter totalled $0.3M (Appendix 5B section 6.1). This includes amounts paid to directors including director fees and statutory superannuation. Attached to this report is Appendix 5B, which provides the Company’s detailed cashflow statement for the quarter. Activities for the September Quarter For the three months ending 30 September 2026, the Company plans to: • Finalise the DFS at Tabba Tabba • Report the remaining assay results from the exploration RC program at the Bolt Cutter Central lithium discovery • Report a Maiden Resource for the Bolt Cutter Central lithium discovery with geological modelling underway and resource estimation commencing imminently • Progress statutory approvals • Progress heritage surveys • Continue regional exploration and project generation
Page 8
8 ASX Announcement 29 July 2026 June 2026 Quarter – ASX Announcements This Quarterly Activities Report contains information extracted from ASX market announcements reported in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (2012 JORC Code). Further details (including 2012 JORC Code reporting tables where applicable) of exploration results referred to in this Quarterly Activities Report can be found in the following announcements lodged on the ASX: Title Date WILDCAT ADVANCES TABBA TABBA DEFINITIVE FEASIBILITY STUDY WITH OPTIMISED DEVELOPMENT PLAN 18 May 2026 POSITIVE METALLURGY TESTWORK FROM BOLT CUTTER CENTRAL 7 July 2026 The announcements can be viewed on the Company’s website www.wildcatresources.com.au under the Investors tab. Wildcat confirms that it is not aware of any new information or data that materially affects the information included in any original ASX announcement. - ENDS - This announcement has been authorised by the Board of Directors of the Company. FOR FURTHER INFORMATION, PLEASE CONTACT: AJ Saverimutto Managing Director Tel: +61 (8) 6555 2950 info@wildcatresources.com.au Matthew Banks Executive Director Tel: +61 (8) 6555 2950 info@wildcatresources.com.au Nathan Ryan NWR Communications Tel: +61 420 582 887 nathan.ryan@ nwrcommunications.com.au
Page 9
9 ASX Announcement 29 July 2026 ASX Listing Rule Information About Tabba Tabba Tabba Tabba is an advanced lithium and tantalum exploration and development project that is located on granted Mining Leases just 80km from the Port of Hedland, Western Australia. It is nearby some of the world's largest hard-rock lithium mines (47km by road from the 446Mt Pilgangoora Project 1 and 87km by road to the 259Mt Wodgina Project2). The Tabba Tabba Project has a spodumene -dominant Mineral Resource informed by more than 115,000m of drilling (44% diamond drill core and 56% RC drill core) of 74.1Mt at 1.0% Li 2O (at a 0.45% Li 2O cut -off grade) and a tantalum Mineral Resource of 1.2Mt at 482ppm Ta 2O5 (at a 200ppm Ta 2O5 cut-off grade)3 containing 1,277,300lbs of Ta2O5 (Table 1 and Table 2). Mineralisation outcrops at surface and the extensive pegmatite system is more than 3km long, with potential for further discovery at depth. In July 2024 4 the Company announced stage 1 metallurgical flotation test results of 79% to 84% at head grades of 1.0% to 1.4% Li2O to produce a 5.5% Li 2O concentrate with low iron and no deleterious elements. 94% of the 2024 Mineral Resource estimate (MRE) is in the high confidence Indicated category, and 63% of the resource is contained within the giant Leia Pegmatite, which is up to 180m true width. Table 1 – Tabba Tabba JORC (2012) MRE as at 28 November 2024 (using 0.45% Li2O cut-off). Category Tonnes (Mt) Li2O (%) Ta2O5 (ppm) Fe2O3 (%) Li2O (T) Ta2O5 (lb) Indicated 70.0 1.01 53 0.64 709,100 9,948,600 Inferred 4.1 0.76 65 0.88 31,100 724,700 Total 74.1 1.00 54 0.65 740,200 10,673,300 Note: Reported above a Li 2O cut -off grade of 0.45%. Appropriate rounding applied. Wildcat announced the Tabba Tabba Lithium Project JORC (2012) Mineral Resource Estimate on 28 November 20245 Table 2 – Tabba Tabba Tantalum MRE as at 28 November 2024 (using a 200ppm Ta2O5 cut-off). Category Tonnes (Mt) Li2O (%) Ta2O5 (ppm) Fe2O3 (%) Li2O (T) Ta2O5 (lb) Indicated 1.19 0.09 482 0.74 1,073 1,267,600 Inferred 0.01 0.05 445 2.50 5 9,700 Total 1.20 0.09 482 0.76 1,078 1,277,300 Note: Reported above a Ta 2O5 cut-off grade of 200ppm Ta 2O5. Appropriate rounding applied. Only the Tabba Tabba Pegmatite domain contributes to the Tabba Tabba Tantalum Resource. All other domains are excluded. A 2012 JORC compliant tantalum Mineral Resource estimate for the Tabba Tabba Project was announced by Pilbara Minerals in January 20156 comprising a combined measured, indicated and inferred resource of 318.1Kt at 950ppm Ta2O5 for 666,200lbs of contained Ta 2O5 at a 400ppm Ta 2O5 lower cut-off grade and 6,000ppm Ta 2O5 upper cut off grade. Wildcat announced the updated Tabba Tabba Tantalum JORC (2012) Mineral Resource estimate reported in Table 4 on 28 November 20247. 1 Pilbara Minerals Ltd ASX announcement 11 June 2025: Pilgangoora-Mineral-Resource-Update.pdf 2 MIN ASX announcement 23 October 2018: http://clients3.weblink.com.au/pdf/MIN/02037855.pdf 3 WC8 ASX announcement 28 November 2024: https://wcsecure.weblink.com.au/pdf/WC8/02887042.pdf 4 WC8 ASX announcement 16 July 2024: https://wcsecure.weblink.com.au/pdf/WC8/02828153.pdf 5 WC8 ASX announcement 28 November 2024: https://wcsecure.weblink.com.au/pdf/WC8/02887042.pdf 6 PLS ASX announcement 19 January 2015: Pilbara-Reports-Updated-Mineral-Resource-For-Tabba-Tabba-Tantalum-Project-WA.pdf 7 WC8 ASX announcement 28 November 2024: https://wcsecure.weblink.com.au/pdf/WC8/02887042.pdf
Page 10
10 ASX Announcement 29 July 2026 In July 2023, Wildcat commenced an RC drilling program to systematically explore the Tabba Tabba mining tenement package for lithium mineralisation 8. A major lithium discovery was announced by the Company on 18 September 2023 9 after assay results confirmed thick intersections of lithium mineralised pegmatites were returned from multiple RC holes in the central and northern pegmatite clusters. On 12 October 2023, Wildcat announced it has successfully completed the acquisition of the Project. In July 2025 the Company announced a positive and robust PFS for the Tabba Tabba Project outlining potential for a 17 year mine life based on a Maiden Probable Ore Reserve of 46.3Mt at 1.0% Li2O using broker consensus SC6.0 pricing of USD $1,384/t FOB (Table 3). At $1,384/t FOB, the PFS projects the project to generate a post-tax NPV(8%) of $1.2Bn at a post-tax IRR of 22.9% with $443M CAPEX with a post-tax payback period of 5.4 years. Table 3 – Tabba Tabba Lithium Maiden Ore Reserve of 46.3Mt at 0.99% Source Classification Tonnes (Mt) Li2O (%) Ta2O5 (ppm) Fe2O3 (%) Li2O (kt) Open pit Proved - - - - - Probable 36.8 1.00 62.4 1.06 366 Underground Proved - - - - - Probable 9.5 0.94 51.9 0.86 90 Total Probable 46.3 0.99 60.2 1.02 456 Note: The Ore Reserve is based on the November 2024 Mineral Resource Estimate (MRE) (Table 1), but does not include the Chewy, Han or Hutt pegmatites, which collectively account for approximately 15% of the MRE . The pegmatites at Tabba Tabba are often thick and shallow dipping. This bodes well for the economics of an eventual mining project. Some of the true width intercepts received to date from throughout the project include: - 105.3m at 1.1% Li2O from 213.7m (TARC259AD), including 43.4m @ 1.4% Li2O from 239.0m; - 84.8m at 1.3% Li2O from 251.4m (TADD020), including 53.6m @ 1.5% Li2O from 251.4m; - 54.9m at 1.0% Li2O from 220.0m (TARC230D), including 31.9m @ 1.5% Li2O from 250.0m; - 84.0m at 1.4% Li2O from 236.0m (TADD051), including 44.0m @ 1.9% Li2O from 268.0m - 89.8m at 1.2% Li2O from 260.0m (TADD047), including 21.7m @ 2.1% Li2O from 291.3m - 70.0m at 1.1% Li2O from 265.0m (TADD021), including 41.0m @ 1.3% Li2O from 278.0m; - 54.9m at 1.1% Li2O from 262.7m (TARC277AD), including 39.1m @ 1.5% Li2O from 264.0m; - 67.0m at 1.1% Li2O from 351.0m (TARC265D); - 45.0m at 1.3% Li2O from 164.0m (TARC236), including 29.0m @ 1.4% Li2O from 180.0m; - 68.0m at 1.4% Li2O from 337m (TADD015, including 50m @ 1.5% Li2O from 338m; - 58.7m at 1.3% Li2O from 333.1m (TADD011), including 11.8m @ 2.3% Li2O from 362.2m; - 43.0m at 1.4% Li2O from 316.0m (TAARC348D), and 43.4m @ 1.1% Li2O from 412.0m; - 54.4m at 1.2% Li2O from 267.9m (TADD030), and 25.0m @ 1.2% Li2O from 363.9; - 44.0m at 1.1% Li2O from 189.0m (TARC353), including 31.0m @ 1.5% Li2O from 189.0m; - 26.6m at 1.5% Li2O from 305.5m (TARC346D); - 135m at 0.9% Li2O from 179m (TARC234D), including 99m @ 1.2% Li2O from 207m; 8 WC8 ASX announcement 14 July 2023: https://www.investi.com.au/api/announcements/wc8/0d6e63aa-fbc.pdf 9 WC8 ASX announcement 18 September 2023: https://www.investi.com.au/api/announcements/wc8/bd9e13dc-76f.pdf
Page 11
11 ASX Announcement 29 July 2026 - 123.4m at 0.9% Li2O from 350.7m (TARC245D), including 69.9m @ 1.2% Li2O from 399m; - 111.4m at 0.9% Li2O from 246.6m (TARC161AD), including 60.3m at 1.4% Li2O from 297.8m; - 94m at 1.0% Li2O from 206m (TARC154AD), including 64.4m @ 1.3% Li2O from 225m; - 94.8m at 0.9% Li2O from 361.9m (TARC264D), including 44.7m at 1.3% Li2O from 406.3m. - 180m at 1.1% Li2O from 206m (TARC148); - 39m at 1.4% Li2O from 271m (TARC147); - 73m at 1.1% Li2O from 266m (TARC246), including 10m at 2% Li2O from 328m; - 70m at 1.0% Li2O from 183m (TARC145), including 47m at 1.5% Li2O from 183m; - 85m at 1.3% Li2O from 167m (TARC144), Including 10m at 2.5% Li2O from 175m; and - 85m at 1.5% Li2O from 133m (TARC128), Including 9m at 3.0% Li2O from 199m. The Project has favourable attributes which position it well for near-term development and as such, the Company has continued to aggressively advance the project through permitting and studies processes, with much of the DFS work already completed. About Bolt Cutter Wildcat’s Bolt Cutter Lithium Project is considered highly prospective for lithium and gold mineralisation. The tenements are located in positions proximal to the Split Rocks Supersuite granitoid complex (considered a fertile source of LCT -type pegmatites) and on regional structures along strike from the 4 46Mt Pilgangoora10 and 259Mt Wodgina11 lithium projects; and in strategic positions on the Berghaus Shear along trend from the 6.8Moz Hemi gold deposit discovered by De Grey Mining (ASX: DEG) now being developed by Northern Star Resources (ASX:NST). Wildcat continues to advance early -stage exploration across its Bolt Cutter landholding. About Bolt Cutter Central lithium discovery The Bolt Cutter Central lithium discovery is located ~10km to the west of the Tabba Tabba Project. It is an early-stage greenfields exploration project with lithium mineralisation associated with swarms of lithium - caesium-tantalum (LCT) pegmatite dykes hosted in a granodiorite unit and remains open in most directions. Maiden reconnaissance RC drilling commenced in July 2025, leading to the discovery of the Harry and Hermione Pegmatite Swarms. The tenement package was bolstered by a tenement acquisition concluding in August 2025 by the acquisition of the full rights to the adjacent tenement E45/5416, located only 2.3km from the Tabba Tabba Projec t. T he Bolt Cutter Central pegmatite system has continued to grow with a mineralised footprint of approximately 0.8 by 2.3 kilometres currently defined . A maiden mineral resource estimate expected to be completed in H2 2026 with continued target generation and definition ongoing. About Mt Adrah Mt Adrah is a highly prospective 493km 2 tenement package located within the well -endowed Lachlan Orogen region in NSW and straddling the Gilmore Suture Zone (associated with mineralisation at numerous large mines including Cowal gold deposit: >11Moz Au12; Temora copper-gold deposit: 2.2Moz Au & 728kt Cu13; and the Cobar goldfields). The project includes the Hobbs Pipe gold deposit which has a JORC (2012) Mineral Resource Estimate of 20.5Mt @ 1.1g/t Au for 770,000 oz of contained gold (Table 4). Hobbs Pipe is a monzodiorite -hosted intrusion -related gold deposit (IRGS) with similarities to the IRGS gold systems that occur in the Alaskan Tintina Province, which includes the 16Moz Fort Knox Gold Mine. Since 10 Pilbara Minerals Ltd ASX announcement 11 June 2025: Pilgangoora-Mineral-Resource-Update.pdf 11 MIN ASX announcement 23 October 2018: http://clients3.weblink.com.au/pdf/MIN/02037855.pdf 12 EVN ASX announcement 14 February 2024: https://clients3.weblink.com.au/pdf/EVN/02772317.pdf 13 Sandfire Resources NL ASX announcement 19 October 2017: https://announcements.asx.com.au/asxpdf/20171019/pdf/43nc75x181br6m.pdf
Page 12
12 ASX Announcement 29 July 2026 acquiring the Mt Adrah Project, Wildcat has confirmed that alteration and mineralisation associated with an intrusive complex extends for more than 1km away from Hobbs Pipe and includes numerous reduced monzodiorite dykes within a gold, arsenic and antimony rich exoskarn. In addition to Hobbs Pipe, the complex hosts several high -grade gold reefs that have been identified by historic artisanal workings and exploration drilling Table 4: JORC (2012) Mineral Resources estimate for the Hobbs Pipe Gold Deposit Resource Classification Depth Below Surface Oxidation Zone COG Au (g/t) Tonnes (Mt) Grade (g/t Au) Contained Gold (oz) Indicated 0 – 150m Oxides 0.4 0.6 0.9 18,000 Fresh 0.9 3.0 1.0 96,000 150 – 700m Fresh 0.9 8.5 1.2 320,000 Total Indicated Resources 12.1 1.1 440,000 Inferred 0 – 150m Fresh 0.5 0.2 0.6 39,000 150 – 700m Fresh 0.9 8.2 1.1 290,000 Total Inferred Resources 8.4 1.1 330,000 TOTAL RESOURCES 20.5 1.1 770,000 Note: The Hobbs Pipe Mineral Resource was first reported in an announcement by former Mt Adrah owners Sovereign Gold Company Ltd (ASX Announcement 27 December 201314) and affirmed by Wildcat when it acquired Mt Adrah as Fraser Range Metals Ltd on 23 August 2019 15. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the original market announcements continue to apply and have not materially changed. The company confirms that the form and context in which the competent persons findings were made have not been materially modified from the original announcement. Forward-Looking Statements This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning Wildcat Resources Limited’s planned exploration program and other statements that are not historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential," "should," and similar expressions are forward -looking statements. Although Wildcat Resources Limited believes that its expectations reflected in these forward- looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking statements. Competent Person’s Statement The information in this report that relates to Exploration Results and Mineral Resources is based on, and fairly represents, information compiled by Sam Hoppe, a Competent Person who is a Member of the Australian Institute of Geoscientists (AIG). Mr Hoppe is a full -time employee of Wildcat Resources Limited. Mr Hoppe has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration, and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the JORC Code. Mr Hoppe consents to the inclusion in the report of the matters based on his information in the form and context in which it appears. 14 Sovereign Gold Ltd ASX announcement 27 December 2013: https://announcements.asx.com.au/asxpdf/20131227/pdf/42lwgh4996pvch.pdf 15 Fraser Range Metals Ltd ASX announcement 23 August 2019: https://announcements.asx.com.au/asxpdf/20190823/pdf/447s52fxbdmrfc.pdf
Page 13
13 ASX Announcement 29 July 2026 Appendix 1 - Interest in Mining Tenements Tenement ID Status Project Name State Interest acquired or disposed Interest at the end of the quarter Comment E45/1649 Pending Bolt Cutter WA 100% 100% E45/1650 Pending Bolt Cutter WA 100% 100% E45/1651 Pending Bolt Cutter WA 100% 100% E45/5416 Granted Bolt Cutter WA - 100% E45/5612 Granted Bolt Cutter WA - 100% E45/6205 Granted Bolt Cutter WA - 100% LCT and LCT mineral development rights only E45/6423 Pending Bolt Cutter WA - 100% E45/6625 Pending Bolt Cutter WA - 100% Transfers to MIN upon grant E45/6841 Pending Bolt Cutter WA - 100% E45/6954 Pending Bolt Cutter WA - 100% Transfers to MIN upon grant E45/6990 Pending Bolt Cutter WA - 100% E45/6992 Granted Bolt Cutter WA - 100% E45/6993 Pending Bolt Cutter WA - 100% E45/7044 Granted Bolt Cutter WA - 100% E45/7047 Granted Bolt Cutter WA - 100% E45/7050 Granted Bolt Cutter WA - 100% E45/7051 Granted Bolt Cutter WA - 100% E45/7077 Granted Bolt Cutter WA - 100% E45/7079 Pending Bolt Cutter WA - 100% E45/7124 Pending Bolt Cutter WA - 100% E45/7176 Granted Bolt Cutter WA - 100% E45/7192 Pending Bolt Cutter WA - 100% E45/7226 Pending Bolt Cutter WA - 100% E45/7237 Pending Bolt Cutter WA - 100% Subject to ballot E45/7255 Pending Bolt Cutter WA - 100% 3rd in time application E45/7266 Pending Bolt Cutter WA - 100% 3rd in time application E45/7299 Pending Bolt Cutter WA 100% 100% E45/7312 Pending Bolt Cutter WA 100% 100% E47/5154 Granted Bolt Cutter WA - 100% E47/5221 Pending Bolt Cutter WA - 100% E47/5241 Pending Bolt Cutter WA - 100% E47/5259 Granted Bolt Cutter WA - 100% E47/5260 Pending Bolt Cutter WA - 100% E47/5270 Pending Bolt Cutter WA - 100% E47/5276 Pending Bolt Cutter WA - 100% E47/5332 Pending Bolt Cutter WA - 100% E47/5341 Pending Bolt Cutter WA - 100%
Page 14
14 ASX Announcement 29 July 2026 Tenement ID Status Project Name State Interest acquired or disposed Interest at the end of the quarter Comment E47/5342 Pending Bolt Cutter WA - 100% E47/5353 Pending Bolt Cutter WA 100% 0% E47/5354 Pending Bolt Cutter WA - 100% E47/5362 Pending Bolt Cutter WA - 100% E47/5425 Pending Bolt Cutter WA 100% 100% E80/5772 Pending Carr Boyd WA - 100% EL 6372 Granted Mt Adrah NSW - 100% EL 7844 Granted Mt Adrah NSW - 100% EL 8606 Granted Mt Adrah NSW - 100% EL 9063 Granted Mt Adrah NSW - 100% E59/3081 Pending Paynes Find WA 100% 100% E59/3104 Pending Paynes Find WA 100% 100% E59/3105 Pending Paynes Find WA 100% 100% E74/0760 Granted Sauron WA - 100% E74/0815 Granted Sauron WA - 100% E74/0816 Granted Sauron WA - 100% E45/2364 Granted Tabba Tabba WA - 100% Non-LCT mineral rights only E45/7106 Granted Tabba Tabba WA - 100% G45/0359 Granted Tabba Tabba WA - 100% G45/0360 Pending Tabba Tabba WA 100% 100% L45/0323 Granted Tabba Tabba WA - 100% L45/0329 Granted Tabba Tabba WA - 100% L45/0757 Granted Tabba Tabba WA - 100% L45/0758 Granted Tabba Tabba WA - 100% L45/0759 Granted Tabba Tabba WA - 100% L45/0810 Granted Tabba Tabba WA - 100% L45/0845 Pending Tabba Tabba WA - 100% L45/0846 Granted Tabba Tabba WA - 100% L45/0847 Granted Tabba Tabba WA - 100% L45/0848 Pending Tabba Tabba WA - 100% L45/0862 Pending Tabba Tabba WA - 100% L45/0863 Granted Tabba Tabba WA - 100% L45/0866 Pending Tabba Tabba WA - 100% L45/0868 Granted Tabba Tabba WA - 100% L45/0911 Pending Tabba Tabba WA 100% 100% L45/0912 Pending Tabba Tabba WA 100% 100% L45/0913 Pending Tabba Tabba WA 100% 100% L45/0914 Pending Tabba Tabba WA 100% 100%
Page 15
15 ASX Announcement 29 July 2026 Tenement ID Status Project Name State Interest acquired or disposed Interest at the end of the quarter Comment L45/0915 Pending Tabba Tabba WA 100% 100% L45/0916 Pending Tabba Tabba WA 100% 100% M45/0354 Granted Tabba Tabba WA - 100% M45/0375 Granted Tabba Tabba WA - 100% M45/0376 Granted Tabba Tabba WA - 100% M45/0377 Granted Tabba Tabba WA - 100% E08/3559 Granted Tirrawarra WA - 100% E08/3674 Granted Tirrawarra WA - 100% E08/3817 Pending Tirrawarra WA - 100% Subject to ballot Note, project names may change as they become redefined through additional work.
Page 16
Rule 5.5 Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report Name of entity Wildcat Resources Limited ABN Quarter ended (“current quarter”) 65 098 236 938 30 June 2026 Consolidated statement of cash flows Current quarter $A’000 Year to date (12 months) $A’000 1. Cash flows from operating activities 1.1 Receipts from customers 1.2 Payments for - - (a) exploration & evaluation (b) development - - (c) production - - (d) staff costs (424) (2,390) (e) administration and corporate costs (458) (2,694) 1.3 Dividends received (see note 3) - 1.4 Interest received 503 2,114 1.5 Interest and other costs of finance paid (7) (29) 1.6 Income taxes paid - 1.7 Government grants and tax incentives 59 1,776 1.8 Other (379) 1.9 Net cash from / (used in) operating activities (327) (1,602) 2. Cash flows from investing activities - - 2.1 Payments to acquire or for: (a) entities (b) tenements - (5) (c) property, plant and equipment (697) (1,087) (d) exploration & evaluation (3,255) (9,720) (e) investments - - (f) other non-current assets - - 2.2 Proceeds from the disposal of: - - (a) entities (b) tenements - -
Page 17
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report ASX Listing Rules Appendix 5B (17/07/20) Page 17 + See chapter 19 of the ASX Listing Rules for defined terms. Consolidated statement of cash flows Current quarter $A’000 Year to date (12 months) $A’000 (c) property, plant and equipment - - (d) investments - - (e) other non-current assets - - 2.3 Cash flows from loans to other entities - - 2.4 Dividends received (see note 3) - - 2.5 Other (Project Studies) (2,624) (6,947) 2.6 Net cash from / (used in) investing activities (6,576) (17,759) 3. Cash flows from financing activities - - 3.1 Proceeds from issues of equity securities (excluding convertible debt securities) 3.2 Proceeds from issue of convertible debt securities - - 3.3 Proceeds from exercise of options 850 1,600 3.4 Transaction costs related to issues of equity securities or convertible debt securities (1) (29) 3.5 Proceeds from borrowings - - 3.6 Repayment of borrowings - - 3.7 Transaction costs related to loans and borrowings - - 3.8 Dividends paid - - 3.9 Other (provide details if material) – Lease principal (30) (105) 3.10 Net cash from / (used in) financing activities 819 1,466 4. Net increase / (decrease) in cash and cash equivalents for the period 4.1 Cash and cash equivalents at beginning of period 43,278 55,089 4.2 Net cash from / (used in) operating activities (item 1.9 above) (327) (1,602) 4.3 Net cash from / (used in) investing activities (item 2.6 above) (6,576) (17,759) 4.4 Net cash from / (used in) financing activities (item 3.10 above) 819 1,466 4.5 Effect of movement in exchange rates on cash held - 4.6 Cash and cash equivalents at end of period 37,194 37,194
Page 18
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report ASX Listing Rules Appendix 5B (17/07/20) Page 18 + See chapter 19 of the ASX Listing Rules for defined terms. 5. Reconciliation of cash and cash equivalents at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts Current quarter $A’000 Previous quarter $A’000 5.1 Bank balances 4,184 1,268 5.2 Call deposits 33,010 42,010 5.3 Bank overdrafts - - 5.4 Other (provide details) - - 5.5 Cash and cash equivalents at end of quarter (should equal item 4.6 above) 37,194 43,278 6. Payments to related parties of the entity and their associates Current quarter $A'000 6.1 Aggregate amount of payments to related parties and their associates included in item 1 (250) 6.2 Aggregate amount of payments to related parties and their associates included in item 2 - Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation for, such payments. 7. Financing facilities Note: the term “facility’ includes all forms of financing arrangements available to the entity. Add notes as necessary for an understanding of the sources of finance available to the entity. Total facility amount at quarter end $A’000 Amount drawn at quarter end $A’000 7.1 Loan facilities - - 7.2 Credit standby arrangements - - 7.3 Other (please specify) - - 7.4 Total financing facilities - - 7.5 Unused financing facilities available at quarter end - 7.6 Include in the box below a description of each facility above, including the lender, interest rate, maturity date and whether it is secured or unsecured. If any additional financing facilities have been entered into or are proposed to be entered into after quarter end, include a note providing details of those facilities as well.
Page 19
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report ASX Listing Rules Appendix 5B (17/07/20) Page 19 + See chapter 19 of the ASX Listing Rules for defined terms. 8. Estimated cash available for future operating activities $A’000 8.1 Net cash from / (used in) operating activities (item 1.9) (327) 8.2 (Payments for exploration & evaluation classified as investing activities) (item 2.1(d)) (3,256) 8.3 Total relevant outgoings (item 8.1 + item 8.2) (3,583) 8.4 Cash and cash equivalents at quarter end (item 4.6) 37,194 8.5 Unused finance facilities available at quarter end (item 7.5) - 8.6 Total available funding (item 8.4 + item 8.5) 37,194 8.7 Estimated quarters of funding available (item 8.6 divided by item 8.3) 10 Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”. Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7. 8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions: 8.8.1 Does the entity expect that it will continue to have the current level of net operating cash flows for the time being and, if not, why not? Answer: N/A 8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further cash to fund its operations and, if so, what are those steps and how likely does it believe that they will be successful? Answer: N/A 8.8.3 Does the entity expect to be able to continue its operations and to meet its business objectives and, if so, on what basis? Answer: N/A Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered. Compliance statement 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A. 2 This statement gives a true and fair view of the matters disclosed. Date: ....29 July 2026...................................................................... Authorised by: ..Board of Directors................................................................................. (Name of body or officer authorising release – see note 4)
Page 20
Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report ASX Listing Rules Appendix 5B (17/07/20) Page 20 + See chapter 19 of the ASX Listing Rules for defined terms. Notes 1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entit y’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disc lose additional information over and above the minimum required under the Listing Rules is encouraged to do so. 2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report. 3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity. 4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [ name of board committee – eg Audit and Risk Committee ]”. If it has been authorised for release to the market by a disclosure committee, you can insert here: “By the Disclosure Committee”. 5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations , the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operat ing effectively.