TSX CG NYSE CGAU STRONG PLATFORM Third Quarter 2026 Results Conference Call & Webcast OCTOBER 30, 2026 BUILDING A FOR FUTURE GROWTH
Page 2
Cautionary Statement on Forward Looking Information 2 All statements, other than statements of historical fact contained or incorporated by reference in this document, which address events, results, outcomes or developments that the Company expects to occur are, or may be deemed to be, forward-looking information or forward-looking statements within the meaning of certain securities laws, including the provisions of the Securities Act (Ontario) and the provisions for “safe harbor” under the United States Private Securities Litigation Reform Act of 1995 and are based on expectations, estimates and projections as of the date of this document. Such forward-looking information involves risks, uncertainties and other factors that could cause actual results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking statements are generally, but not always, identified by the use of forward-looking terminology such as “aimed”, “anticipate”, “believe”, “beyond”, “commenced”, “continue”, “expect”, “extend”, “evaluate”, “finalizing”, “focused”, “forecast”, “goal”, “intend”, “in line”, “ongoing”, “optimistic”, “on track”, “plan”, “potential”, “preliminary”, “project”, “pursuing”, “target”, or “update”, or variations of such words and phrases and similar expressions or statements that certain actions, events or results “may”, “could”, “would” or “will” be taken, occur or be achieved or the negative connotation of such terms. Such statements include, but may not be limited to: statements regarding 2026 guidance, outlook and expectations, including, but not limited to, production (including planned mining zones), sales, costs, capital expenditures, grades and recoveries, reclamation costs, recoveries, depreciation, depletion and amortization, taxes and royalty payments and life of mine, engineering and permitting costs; exploration programs and targets gold, copper (including expected credits) and molybdenum prices; the declaration, payment and sustainability of the Company’s dividends; the continuation of the Company’s normal course issuer bid (“NCIB”) , the timing, methods and quantity of any purchases of Shares under the NCIB and an intention to renew the NCIB; the nature and timing of construction, permitting and first production of Goldfield; the timing and results of the Kemess Pre-Feasibility Study; the results and timing of the Life of Mine Optimization Study at Öksüt; the nature and timing and capital required for the restart of Thompson Creek; royalty and tax rates in Türkiye; working capital levels and costs at Langeloth; financial hedges; share based compensation expenses; the timing of additional contingent payments from Equinox Gold; and other statements that express management’s expectations or estimates of future plans and performance, operational, geological or financial results, estimates or amounts not yet determinable and assumptions of management. The Company cautions that forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable by the Company at the time of making such statements, are inherently subject to significant business, economic, technical, legal, geopolitical and competitive uncertainties and contingencies, which may prove to be incorrect. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements and undue reliance should not be placed on such statements and information. Risk factors that may affect the Company’s ability to achieve the expectations set forth in the forward-looking statements in this document include, but are not limited to: (A) strategic, legal, planning and other risks, including: political risks associated with the Company’s operations in Türkiye, the USA and Canada; risks related to geopolitical instability, including ongoing conflicts in the Middle East and elsewhere, which may adversely affect global economic conditions, commodity prices, energy costs, supply chains and transportation routes; resource nationalism including the management of external stakeholder expectations; the impact of changes in, or to the more aggressive enforcement of, laws, government royalties, tariffs, regulations and government practices, including unjustified civil or criminal action against the Company, its affiliates, or its current or former employees; risks that community activism may result in increased contributory demands or business interruptions; the risks related to outstanding or potential litigation, tax audits, examinations and other administrative or regulatory proceedings affecting the Company; the risk of claims, investigations or regulatory proceedings, particularly at the Langeloth Metallurgical Facility, arising from operational incidents, including potential third-party claims for personal injury, property damage or business interruption and regulatory enforcement actions, orders, penalties, remediation obligations or operational restrictions, as well as the ability to obtain any necessary regulatory approvals, agreements or accommodations to maintain operations pending the completion of required repairs or corrective measures; the impact of any sanctions or tariffs imposed by Canada, the United States or other jurisdictions; potential defects of title in the Company’s properties that are not known as of the date hereof; risks relating to permitting and development of our projects, including tailings facilities, being consistent with the Company’s expectations; the inability of the Company and its subsidiaries to enforce their legal rights in certain circumstances; risks related to anti-corruption legislation; Centerra not being able to replace mineral reserves; Indigenous claims and consultative issues relating to the Company’s properties which are in proximity to Indigenous communities; and potential risks related to kidnapping or acts of terrorism; (B) risks relating to financial matters, including: sensitivity of the Company’s business to the volatility of gold, copper, molybdenum and other mineral prices; the use of provisionally-priced sales contracts for production at the Mount Milligan Mine; reliance on a few key customers for the gold-copper concentrate at the Mount Milligan Mine; use of commodity derivatives; the imprecision of the Company’s mineral reserves and resources estimates and the assumptions they rely on; the accuracy of the Company’s production and cost estimates; persistent inflationary pressures on key input prices; the impact of restrictive covenants in the Company’s credit facilities, the Royal Gold Streaming Agreement and the Additional Royal Gold Agreement which may, among other things, restrict the Company from pursuing certain business activities, including paying dividends or repurchasing shares under its NCIB, or making distributions from its subsidiaries; the Company’s ability to obtain future financing; sensitivity to fuel price volatility; the impact of global financial conditions; the impact of currency fluctuations; the effect of market conditions on the Company’s short-term investments and equity investment portfolio; the Company’s ability to make payments, including any payments of principal and interest on the Company’s debt facilities, which depends on the cash flow of its subsidiaries; the ability to obtain adequate insurance coverage; changes to taxation laws or royalty structures in the jurisdictions where the Company operates, and (C) risks related to operational matters and geotechnical issues and the Company’s continued ability to successfully manage such matters, including: unanticipated ground and water conditions; the stability of the pit walls at the Company’s operations leading to structural cave-ins, wall failures or rock-slides; the integrity of tailings storage facilities and the management thereof, including as to stability, compliance with laws, regulations, licenses and permits, controlling seepages and storage of water, where applicable; there being no significant disruptions affecting the activities of the Company whether due to extreme weather events or other related natural disasters, labour disruptions, supply disruptions, power disruptions, damage to equipment or other force majeure events; the risk of having sufficient water to continue operations at the Mount Milligan Mine and achieve expected mill throughput; changes to, or delays in the Company’s supply chain and transportation routes, including cessation or disruption in rail and shipping networks, whether caused by decisions of third-party providers or force majeure events; lower than expected ore grades or recovery rates; the success of the Company’s future exploration and development activities, including the financial and political risks inherent in carrying out exploration activities; inherent risks associated with the use of sodium cyanide in the mining operations; the adequacy of the Company’s insurance to mitigate operational and corporate risks; mechanical breakdowns, including the risk of further breakdowns; the ability of the Company to successfully renegotiate collective agreements when required; the risk that Centerra’s workforce and operations may be exposed to widespread epidemic or pandemic; seismic activity, including earthquakes; wildfires; long lead-times required for equipment and supplies given the remote location of some of the Company’s operating properties and disruptions caused by global events; reliance on a limited number of suppliers for certain consumables, equipment and components; the ability of the Company to address physical and transition risks from climate change and sufficiently manage stakeholder expectations on climate-related issues; regulations regarding greenhouse gas emissions and climate change; significant volatility of molybdenum prices resulting in material working capital changes and unfavourable pressure on viability of the molybdenum business; the Company’s ability to accurately predict decommissioning and reclamation costs and the assumptions they rely upon; the Company’s ability to attract and retain qualified personnel; competition for mineral acquisition opportunities; risks associated with the conduct of joint ventures/partnerships; risk of cyber incidents such as cybercrime, malware or ransomware, data breaches, fines and penalties; and the Company’s ability to manage its projects effectively and to mitigate the potential lack of availability of contractors, budget and timing overruns, and project resources. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements are provided for the purpose of providing information about management’s expectations and plans relating to the future. All of the forward-looking statements made in this document are qualified by these cautionary statements and those made in our other filings with the securities regulators of Canada and the United States including, but not limited to, those set out in the Company’s latest Annual Report on Form 40-F/Annual Information Form and Management’s Discussion and Analysis, each under the heading “Risk Factors”, which are available on SEDAR+ (www.sedarplus.ca) or on EDGAR (www.sec.gov/edgar). The foregoing should be reviewed in conjunction with the information, risk factors and assumptions found in this document. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether written or oral, or whether as a result of new information, future events or otherwise, except as required by applicable law. Richard Adofo, Member of the Association of Professional Geoscientists Ontario and Centerra’s Vice President, Exploration & Resource, has reviewed and approved the scientific and technical information contained in this presentation. Mr. Adofo is a “qualified person” within the meaning of the Canadian Securities Administrator’s NI 43-101 Standards of Disclosure for Mineral Projects.
Page 3
Use of Non-GAAP and Other Specified Financial Measures 3 This document contains “specified financial measures” within the meaning of NI 52-112, specifically the non-GAAP financial measures, non-GAAP ratios and supplementary financial measures described below. Management believes that the use of these measures assists analysts, investors and other stakeholders of the Company in understanding the costs associated with producing gold and copper, understanding the economics of gold and copper mining, assessing operating performance, the Company’s ability to generate free cash flow from current operations and on an overall Company basis, and for planning and forecasting of future periods. However, the measures have limitations as analytical tools as they may be influenced by the point in the life cycle of a specific mine and the level of additional exploration or other expenditures a company has to make to fully develop its properties. The specified financial measures used in this MD&A do not have any standardized meaning prescribed by IFRS and may not be comparable to similar measures presented by other issuers, even as compared to other issuers who may be applying the World Gold Council (“WGC”) guidelines. Accordingly, these specified financial measures should not be considered in isolation, or as a substitute for, analysis of the Company’s recognized measures presented in accordance with IFRS. The following is a description of the non-GAAP financial measures, non-GAAP ratios and supplementary financial measures used in this document: • All-in sustaining costs on a by-product basis per ounce is a non-GAAP ratio calculated as all-in sustaining costs on a by-product basis divided by ounces of gold sold. All-in sustaining costs on a by-product basis is a non-GAAP financial measure calculated as the aggregate of production costs as recorded in the condensed consolidated statements of (loss) earnings, refining and transport costs, the cash component of capitalized stripping and sustaining capital expenditures, lease payments related to sustaining assets, corporate general and administrative expenses, accretion expenses, asset retirement depletion expenses, copper and silver revenue and the associated impact of hedges of by- product sales revenue. When calculating all-in sustaining costs on a by-product basis, all revenue received from the sale of copper from the Mount Milligan Mine, as reduced by the effect of the copper stream, is treated as a reduction of costs incurred. A reconciliation of all-in sustaining costs on a by-product basis to the nearest IFRS measure is set out below. Management uses these measures to monitor the cost management effectiveness of each of its operating mines. • Sustaining capital expenditures and Non-sustaining capital expenditures are non-GAAP financial measures. Sustaining capital expenditures are defined as those expenditures required to sustain current operations and exclude all expenditures incurred at new operations or major projects at existing operations where these projects will materially benefit the operation. Non-sustaining capital expenditures are primarily costs incurred at ‘new operations’ and costs related to ‘major projects at existing operations’ where these projects will materially benefit the operation. A material benefit to an existing operation is considered to be at least a 10% increase in annual or life of mine production, net present value, or reserves compared to the remaining life of mine of the operation. A reconciliation of sustaining capital expenditures and non-sustaining capital expenditures to the nearest IFRS measures is set out below. Management uses the distinction of the sustaining and non-sustaining capital expenditures as an input into the calculation of all-in sustaining costs per ounce and all-in costs per ounce. • Adjusted net earnings (loss) is a non-GAAP financial measure calculated by adjusting net (loss) earnings as recorded in the condensed consolidated statements of (loss) earnings for items not associated with ongoing operations. The Company believes that this generally accepted industry measure allows the evaluation of the results of income-generating capabilities and is useful in making comparisons between periods. This measure adjusts for the impact of items not associated with ongoing operations. A reconciliation of adjusted net (loss) earnings to the nearest IFRS measures is set out below. Management uses this measure to monitor and plan for the operating performance of the Company in conjunction with other data prepared in accordance with IFRS. • Free cash flow (deficit) is a non-GAAP financial measure calculated as cash provided by operating activities from continuing operations less property, plant and equipment additions. A reconciliation of free cash flow to the nearest IFRS measures is set out below. Management uses this measure to monitor the amount of cash available to reinvest in the Company and allocate for shareholder returns. • Mining costs per tonne mined is a non-GAAP financial measure calculated by dividing the mining costs by the number of tonnes mined. Management uses these measures to monitor the cost management effectiveness of the mining process for each of its operating mines. • Processing costs per tonne stacked is a non-GAAP financial measure calculated by dividing the processing costs by the number of tonnes milled or stacked. Management uses these measures to monitor the cost management effectiveness of the mine processing for each of its operating mines. • Site G&A costs per tonne processed is a non-GAAP financial measure calculated by dividing the site G&A costs by the number of tonnes milled or stacked. Management uses these measures to monitor the cost management effectiveness of the site G&A process for each of its operating mines. • Average realized gold price is a supplementary financial measure calculated by dividing the different components of gold sales (including third party sales, mark-to-market adjustments, final pricing adjustments and the fixed amount received under the Mount Milligan Mine Streaming Agreement) by the number of ounces sold. Management uses this measure to monitor its sales of gold ounces against the average market gold price. • Average realized copper price is a supplementary financial measure calculated by dividing the different components of copper sales (including third party sales, mark-to-market adjustments, final pricing adjustments and the fixed amount received under the Mount Milligan Mine Streaming Agreement) by the number of pounds sold. Management uses this measure to monitor its sales of copper pounds against the average market copper price. • Total liquidity is a supplementary financial measure calculated as cash and cash equivalents and amount available under the corporate credit facility. Credit facility availability is reduced by outstanding letters of credit. Management uses this measure to determine if the Company can meet all of its commitments, execute on the business plan, and to mitigate the risk of economic downturns. • Adjusted EBITDA is a non-GAAP financial measure that represents earnings before interest, taxes, depreciation, and amortization. It is calculated by adjusting net earnings as recorded in the consolidated statements of earnings by depreciation and amortization. Management uses this measure to monitor and plan for the operating performance of the Company in conjunction with other data prepared in accordance with IFRS. Additional information about these measures, including explanations of their composition, explanations of how these measures provide useful information to investors and quantitative reconciliations to the most directly comparable financial measures in the Company’s unaudited financial statements for the quarters ended September 30, 2026 and 2025, is included in the section titled “Non-GAAP and Other Financial Measures” of the Q3 2026 MD&A, which section is incorporated by reference herein. The Q3 2026 MD&A is available under the Company’s profile on SEDAR+ at www.sedarplus.ca.
Page 4
Q3 2026 OPERATING HIGHLIGHTS Production: 75,429 oz gold; 12.8M lbs copper Gold production costs: $1,505/oz AISC on a by-product basis(1): $1,775/oz Mount Milligan delivered a fourth consecutive quarter on plan and remains on track to achieve its 2026 production guidance. Öksüt continues to track in line with previously increased full-year production guidance and original cost guidance ranges. Reaffirm 2026 consolidated production and cost guidance ranges. Q3 2026 FINANCIAL HIGHLIGHTS Q3 2026 EPS and Adjusted EPS: $0.46/share and $0.37/share Mount Milligan full-year AISC on a by-product basis(1) guidance was lowered to $1,100-1,200/oz reflecting strong copper by-product credits Cash flow from ops: In Q3 2026, cash flow from ops was $143 million and free cash flow was $17 million. Cash and cash equivalents of $398 million as at Sept 30, 2026 Record Q3 2026 shareholder returns: $63 million ($53 million in buybacks; $10 million in dividends) Q3 2026 Summary Continued consistent execution at our operations. Reaffirm full-year consolidated production and cost guidance ranges. 4 (1) Non-GAAP financial measures ratios. Refer to the “Non-GAAP and Other Financial Measures” section of the Company’s latest MD&A.
Page 5
5 Goldfield Project Progress Update Goldfield now has all major permits in place for the Gemfield deposit, which accounts for ~80% of the life of mine production and continues to progress construction and site preparation activities Origin Hill Water Retention Basin Water Retention Basin Main Entrance off US-95 Pre-Cast Culverts East Diversion Channel WEST STORM WATER DIVERSION – CULVERT INSTALLEAST STORM WATER DIVERSION
Page 6
6 Conceptual Production Growth and Initial Capex Profile(1) Centerra has an organic growth pipeline in gold and copper with a focus in Canada and US, which is expected to be self-funded from existing liquidity and future cash flow from operations (1) Indicative values. For illustrative purposes only. (2) Represents non-sustaining initial capital expenditures only. Thompson Creek includes the remaining non-sustaining capital expenditures for the project (based on the mid-point of the updated total non-sustaining capital estimate ($425-450M), with $337M spent since the restart decision in September 2024 through September 30, 2026. Goldfield includes the remaining non-sustaining capital expenditures for the project (based on the total non-sustaining capital estimate of $252M, with $49M spent from January 2026 through September 30, 2026. Exploration Potential Exploration Potential 2026-2029 2030’s 2040’s Mount Milligan Öksüt Goldfield Kemess Molybdenum Business Unit Gold Production Future Potential: EndakoThompson Creek Incremental Production Potential Capex(2) $203M Capex(2) $100M Capex(2) $771M
Page 7
Sustainability Highlights Advancing responsible operations through continuous learning and strong community impact 7 CENTERRA ANNUAL SUSTAINABILITY SUMMIT Centerra hosted its annual Sustainability Summit in Vancouver bringing together environmental and community relations teams from across our operations and corporate offices. The summit provided an opportunity to share best practices, strengthen collaboration and advance company-wide initiatives in support of Centerra’s broader sustainability strategy. STRONG COMMUNITY INVOLVEMENT The Goldfield Team participated in Goldfield Days and had the opportunity to engage with the community and showcase our activities at Goldfield alongside our partners. At Langeloth, our team donated specialized equipment to the Smith Township-Slovan Volunteer Fire Department, helping support the department’s emergency response capabilities.
Page 8
Mount Milligan Operating Highlights Q3 2026 gold and copper production continues to be in line with guidance. Lowering AISC on a by-product basis(1) due to strong copper credits 8 Q3 2026 HIGHLIGHTS Production: Q3 2026: 44,070 ounces gold and 12.8M pounds copper Q3 gold production is 15% higher compared to last quarter, and consistent with the production profile previously outlined Costs: Q3 2026 gold production costs: $1,392/oz Q3 2026 AISC on a by-product basis(1): $985/oz Operating Highlights Q3 2026 Q3 2026 YTD Tonnes mined (000s) 12,323 36,485 Tonnes ore mined (000s) 5,764 17,110 Tonnes ore processed (000s) 5,556 15,899 Process plant head grade gold (g/t) 0.43 0.37 Process plant head grade copper (%) 0.15% 0.16% Gold recovery (%) 58.8% 60.3% Copper recovery (%) 73.7% 74.2% Gold produced(2) / Gold sold(2) (oz) 44,070 / 43,005 111,817 / 117,100 Copper produced(2) / Copper sold(2) (M lbs) 12.8 / 13.2 40.1 / 41.4 (1) Non-GAAP financial measures ratios. Refer to the “Non-GAAP and Other Financial Measures” section of the Company’s latest MD&A. (2) Mount Milligan Mine production and sales are presented on a 100% basis. Under the Mount Milligan streaming agreement, Royal Gold is entitled to 35% of gold ounces sold and 18.75% of copper pounds sold. Royal Gold pays $435 per ounce of gold delivered and 15% of the spot price per tonne of copper delivered. 2026 GUIDANCE Production: 140,000 – 155,000 oz gold; 50 – 60M lbs copper Gold and copper production remains aligned with the PFS mine plan and on track to achieve 2026 production guidance Gold production costs of $1,450 – $1,550/oz; AISC on by-product basis(1) of $1,100 – $1,200/oz 2026 Mount Milligan AISC on a by-product basis(1) guidance was lowered due to strong copper credits; Reaffirms its 2026 gold production cost guidance
Page 9
LIFE OF MINE OPTIMIZATION STUDY Work on the Life of Mine Optimization study is well underway, with results expected in early 2027 Focus remains on maximizing the value of a very strong operation Öksüt Mine Operating Highlights Continues to track in line with its previously increased full-year production guidance and original cost guidance ranges 9 Q3 2026 HIGHLIGHTS Production: Q3 2026: 31,359 ounces of gold Costs: Q3 2026 Gold production costs: $1,659/oz Q3 2026 AISC on a by-product basis(1): $1,893/oz 2026 GUIDANCE Production: 120,000 – 135,000 oz gold Centerra reaffirms its 2026 Öksüt gold production guidance Gold production costs of $1,650 – $1,750/oz; AISC on by-product basis(1) of $1,850 – $1,950/oz Centerra reaffirms its 2026 Öksüt AISC on a by-product basis(1) guidance Operating Highlights Q3 2026 Q3 2026 YTD Tonnes mined (000s) 4,967 12,774 Tonnes ore mined (000s) 1,730 3,603 Ore mined – grade (g/t) 0.79 1.06 Ore crushed (000s) 1,500 3,622 Tonnes of ore stacked (000s) 1,499 3,678 Heap leach grade (g/t) 0.85 1.08 Heap leach contained ounces stacked (oz) 41,003 128,058 Gold produced (oz) 31,359 102,340 Gold sold (oz) 31,382 102,336 (1) Non-GAAP financial measures ratios. Refer to the “Non-GAAP and Other Financial Measures” section of the Company’s latest MD&A.
Page 10
Thompson Creek Restart Highlights Thompson Creek restart activities remain on track for first production in mid-2027 THOMPSON CREEK RESTART HIGHLIGHTS Q3 Highlights Q3 2026 non-sustaining capital expenditures(1): $81 million By the end of Q3 2026, 65% of the infrastructure refurbishment is complete In October 2026, the final electrical equipment required for the mill refurbishment was delivered to site Project Cost Estimate Project-to-date total non-sustaining capital expenditures(1): $337 million Total project cost estimate is between $425 and $450 million 2026 non-sustaining capital(1) guidance: $190 – 220 million The project remains on track, with first production expected in mid- 2027 Q3 2026 Project Activities: Most long-lead equipment packages shipped Installation of approximately 2/3 of the flotation tanks and agitators completed Refurbishment of key mill equipment and electrical work advancing (1) Non-GAAP financial measures ratios. Refer to the “Non-GAAP and Other Financial Measures” section of the Company’s latest MD&A. 10
Page 11
Financial Results 1111 Financials ($M, except as noted) Q3 2026 Q3 2026 YTD Net earnings (loss) $88.7 $240.2 Net earnings (loss) per common share - $/share basic(2) $0.46 $1.22 Adjusted net earnings (loss)(1) $71.8 $239.3 Adjusted net earnings (loss) per common share - $/share basic(1,2) $0.37 $1.21 Gold ounces sold 74,387 219,436 Average realized gold price ($/oz) (3) $3,483 $3,697 Copper pounds sold (000s) 13,189 41,434 Average realized copper price ($/lb)(3) $5.74 $5.15 Molybdenum pounds sold (000s) 4,645 12,113 Average realized molybdenum price ($/lb) $33.43 $30.53 Gold production costs ($/oz) (4) $1,505 $1,536 All-in sustaining costs on a by-product basis(1,2,4) ($/oz) $1,775 $1,729 Additions to property, plant and equipment $139.3 $374.4 Total capital expenditures(1) $150.9 $340.5 (1) Non-GAAP financial measures ratios. Refer to the “Non-GAAP and Other Financial Measures” section of the Company’s latest MD&A. (2) As at September 30, 2026 the Company had 193,671,809 common shares issued and outstanding. (3) This supplementary financial measure within the meaning of National Instrument 52-112 - Non-GAAP and Other Financial Measures Disclosure (“NI 52-112”), is calculated as a ratio of revenue from the consolidated financial statements and units of metal sold and includes the impact from the Mount Milligan Streaming Agreement, copper hedges and mark-to-market adjustments on metal sold not yet finally settled (4) All per unit costs metrics are expressed on a metal sold basis.
Page 12
Financial Highlights Robust cash flow from operations in Q3 2026; Total liquidity of $998 million 12(1) Non-GAAP financial measures ratios. Refer to the “Non -GAAP and Other Financial Measures” section of the Company’s latest MD& A. (2) As at September 30, 2026. Total liquidity is calculated as cash and cash equivalents, plus the amount available under the credit facility. 107 6368 66 3 -54 143 17 -$100 -$50 $0 $50 $100 $150 $200 Cash Provided by Operations Free Cash Flow $M Q3 2026 CASH GENERATION Mount Milligan Öksüt MBU Consolidated Cash Credit Facility Credit Facility $600M TOTAL LIQUIDITY(2) $998M Cash $398M (1)