Slides
Page 1
Discovering high-grade vein systems in premier mining districts Corporate Presentation February 2026 TSXV:EQTY / OTCQB:EQMEF/ FRA-EGSD
Page 2
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD • Some of the statements contained in this presentation may be deemed “forward-looking statements.” These include estimates and statements that describe the Company’s future plans, objectives or goals, and expectations of a stated condition or occurrence. • Forward-looking statements may be identified by the use of words such as “believes", "anticipates”, “expects”, “estimates”, “may”, “could”, “would”, “will”, or “plan”. Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. • Actual results relating to, among other things, results of exploration, reclamation, capital costs, and the Company’s financial condition and prospects, could differ materially from those currently anticipated in such statements for many reasons such as but not limited to; changes in general economic conditions and conditions in the financial markets; changes in demand and prices for the minerals the Company expects to produce; litigation, legislative, environmental and other judicial, regulatory, political and competitive developments; technological and operational difficulties encountered in connection with the Company’s activities; and changing foreign exchange rates and other matters discussed in this presentation. • Persons should not place undue reliance on the Company’s forward-looking statements. Further information regarding these and other factors, which may cause results to differ materially from those projected in forward-looking statements, are included in the filings by the Company with securities regulatory authorities. The Company does not assume any obligation to update or revise any forward-looking statement that may be made from time to time by the Company or on its behalf, except in accordance with applicable securities laws, whether as a result of new information, future events or otherwise. • The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of the contents of this presentation, that has been prepared by management. • Robert Macdonald, MSc., PGeo. is the VP of Exploration for Equity Metals Corporation and is the Qualified Person responsible for the supervision and preparation of the technical information in this disclosure. Forward-Looking Statement 2
Page 3
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Investment Highlights High-grade resource open for expansion at Silver Queen Project in B.C. No Royalty burden Exceptional assay results demonstrate exploration upside across several veins New Drilling in 2026 Mineral Resource Increases Ind: +187% AgEq Inf: +30% AgEq Update Expected Q1 2026 Additional prospective gold, copper, diamond, silica sand and critical metals The new Arlington Project, BC adds potentially significant gold-copper asset New Drilling in 2026 Experienced management and geological team with a proven track record 3
Page 4
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Capital Markets Profile Capital Structure 4 Share Price and Volume (Since Feb 2024)Ticker TSX-V: EQTY Share Price (Feb 04, 2026) C$0.42 52-Week Trading Range $0.155 – C$0.60 Basic Shares Outstanding 242M Options 22.7M Warrants 30.9M FD Shares Outstanding 297M Market Capitalization (basic) C$101.6M Cash C$9.7M Enterprise Value C$101M EV/Oz AgEq C$1.18 Debt Nil
Page 5
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Management Team & Board Lawrence Page, LLB, KC – Chairman & Director • Director/officer of several public prominent exploration and mining companies • Major Projects and Mines involvement: Penasquito, Mexico; Hemlo and Eskay Creek, Canada Joseph A. Kizis Jr., MSc., P .Geo – President & Director • President, Director, Bravada Gold Corporation • 40 years experience in exploration for gold, silver, copper, molybdenum, lead and zinc in BC and abroad • Major Projects involvement: Wind Mountain, NV; Buffalo Valley, NV; Mount Hope, NV; Homestake Ridge, BC Courtney Shearer, B.Sc (Eng.), MBA, CPA, CMA – Director • Served as Director and Consultant, San Gold Corporation Killian Ruby, CPA, CA, B. Sc. (Acc) – CFO & Director • President and CEO of Malaspina Consultants & Manex Resource Group • Assurance Partner at Wolrige Mahon LLP • Served as Senior Manager of KPMG LLP John R. Kerr – Director • 50 years experience in discovery and development of significant mineral deposits in North America • Major Projects involvement: Santa Fe, NV; Calvada, NV; Mindora, NV; Ming Mine, NL; Rambler East, NL; Frasergold Deposit, BC Robert W.J. Macdonald, MSc., P .Geo. – VP Exploration • VP Geological Services, Manex Resource Group • Major Projects involvement: Cerro Las Minitas, Mx; Homestake Ridge, BC Arie Page, LLB – Corporate Secretary • Corporate Secretary for several public resource companies including Southern Silver Exploration Corp. Experienced team with a proven track record of exploration, discovery and development success in North America 5
Page 6
Equity Metals’ Portfolio of Assets Silver Queen Project (British Columbia) • Flagship, precious/base metal project near multiple producing/past-producing mines • No underlying Royalties on the Property • High-grade Mineral Resource (2022)1 – 62.8 Moz AgEq grading 565 g/t AgEq (indicated) – 22.5 Moz AgEq grading 365 g/t AgEq (inferred) • Mineral Resource Update targeted for Q1 ’26 • New Drilling for Q1 ‘26 Monument & WO Projects (NW Territories) • Diamond-bearing kimberlites • Nearby diamond production, ~40 km from both the Diavik and Ekati diamond mines La Ronge Silica Project (Saskatchewan) • Unconsolidated, high-purity silica sand, potential feed to convert to silicon for the battery industry 6 1. Parameters for the NI 43-101 Compliant Mineral Resource Estimate are described on Slide 10 and in the EQTY News Release, dated Dec 1, 2022 Arlington Project (British Columbia) • Greenfields Au-Cu-Ag Project in Beaverdell District • Multiple exploration targets with high grade assay results • New Drilling for Q3 ‘26
Page 7
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Well-positioned, district-scale property in the Skeena Arch porphyry copper region • Intermediate-sulfidation epithermal veins – immediate focus • Copper Porphyry targets – possible longer-term evaluation Existing infrastructure in a mature mining region in B.C. Minor historic production since 1912, ~9km of underground development High-grade NI 43-101 resource (2022) Positive metallurgy in 1988 and 2022 • Pilot plant recoveries of up to 83% Au, 95% Ag, 93% Cu, 91% Pb and 98% Zn • Additional metallurgical work underway Ongoing drilling demonstrates expansion • 61,024m (167 holes) completed by Equity Metals since late 2020 Silver Queen Project Project Highlights 7
Page 8
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Silver Queen Project Superior Location & Infrastructure • 17 crown-granted titles and 46 tenure claims covering 18,871 ha in the Omineca Mining Division – 35 km south of the town of Houston, B.C., and 590 km north northwest of Vancouver, B.C. – Proximity to existing infrastructure in including power, roads and rail • Near four prominent producers (Glencore, Imperial Metals, Centerra Gold and Newmont) 8 Near major deposits/mines including Berg, Equity Silver, Endako, Huckleberry, and Mt. Milligan
Page 9
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Silver Queen Project Mineral Resource - Open for Expansion Silver Queen Mineral Resource Estimate (NI 43-101 Compliant, Dec. 1, 2022) (C$100 NSR cut-off) 1) The current Mineral Resource Estimate was prepared by Garth Kirkham, P.Geo., of Kirkham Geosystems Ltd and Eugene Puritch, P. Eng., FEC, CET and Fred Brown, P, Geo. of P&E Mining Consultants Inc. (“P&E”), Independent Qualified Persons (“QP”), as defined by National instrument 43-101. 2) All Mineral Resources have been estimated in accordance with Canadian Institute of Mining and Metallurgy and Petroleum (“CIM”) definitions, as required under National Instrument 43-101 (“NI43-101”). 3) Mineral Resources were constrained using continuous mining units demonstrating reasonable prospects of eventual economic extraction. 4) Silver and Gold Equivalents were calculated from the interpolated block values using relative process recoveries and prices between the component metals and silver to determine a final AgEq and AuEq values. 5) Silver and Gold Equivalents and NSR$/t values were calculated using average long-term prices of $20/oz silver, $1,700/oz gold, $3.50/lb copper, $0.95/lb lead and $1.45/lb zinc. All metal prices are stated in $USD. The C$100/tonne NSR cut-off grade value for the underground Mineral Resource was derived from mining costs of C$70/t, with process costs of C$20/t and G&A of C$10/t. Process recoveries used were Au 70%, Ag 80%, Cu 80%, Pb 81% and Zn 90%. 6) Grade capping was performed on 1m composites for the No. 3 and NG-3 veins and whole vein composites for the Camp and Sveinson veins. For the No. 3 and NG-3 veins Inverse distance cubed (I/d3) was utilized for grade interpolation for Au and Ag and inverse distance squared (I/d2) was utilized for Cu, Pb and Zn. Inverse distance squared (I/d2) was used for all metals in the Camp and Sveinson veins. 7) A bulk density of 3.56t/m3 was used for all tonnage calculations in the No. 3 and NG-3 veins. A variable density with a 3.15 average was used for the Camp and Sveinson veins. 8) Mineral Resources are not Mineral Reserves until they have demonstrated economic viability. Mineral Resource Estimates do not account for a Mineral Resource’s mineability, selectivity, mining loss, or dilution. 9) An Inferred Mineral Resource has a lower level of confidence than that applying to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued exploration. 10) All figures are rounded to reflect the relative accuracy of the estimate and therefore numbers may not appear to add precisely. 9 Indicated Resources Average Grade Contained Metal Zone Tonnes Ag Au Cu Pb Zn AgEq AuEq Ag TrOz Au TrOz Cu Pb Zn AgEq TrOz AuEq TrOz (kt) (g/t) (g/t) (%) (%) (%) (g/t) (g/t) (kozs) (kozs) (Mlbs) (Mlbs) (Mlbs) (kozs) (kozs) No. 3 and NG3 Veins 2,942 150 2.45 0.25 0.7 3.8 569 6.9 14,168 232 16 43 249 53,852 657 Camp / Sveinson Veins 514 412 0.31 0.19 0.4 1.5 541 6.5 6,808 5 2 5 17 8,940 108 Total 3,455 189 2.13 0.24 0.6 3.5 565 6.9 20,976 237 18 48 267 62,792 765 Inferred Resources No. 3 and NG3 Veins 257 110 1.94 0.32 0.2 1.1 361 4.4 911 16 2 1 6 2,975 36 Camp / Sveinson Veins 1,664 176 0.64 0.22 0.6 2.1 366 4.4 9,387 34 8 22 78 19,562 237 Total 1,920 167 0.82 0.23 0.5 2.0 365 4.4 10,298 50 10 23 84 22,536 273
Page 10
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Silver Queen Project Low Sulphide Veins SQ21-034 48.55-48.85 m: 10,073 g/t Ag, 0.17% Cu, 0.08% Pb, 0.34% Zn SQ21-049 131-131.3m: 3,235g/t Ag, 0.05% Cu, 0.64% Pb, 2.31% Zn 10
Page 11
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Silver Queen Project High Sulphide Veins SQ21-033 175.77-176 m: 2.1 g/t Au, 166g/t Ag, 0.04% Cu, 4.71% Pb, 9.26% Zn SQ21-051: 414.15-414.5 m: 2.0g/t Au, 172g/t Ag, 0.1% Cu, 4.5% Pb, 6.6% Zn 11
Page 12
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD 2. km Silver Queen Project 2024-25 Exploration 2023-25 Drilling to add up to 2.5 Mt (~40Mozs AgEq) in 2025 12 Camp – Camp North • Summer ‘24 drilling • 8 holes – 3,704 metres • New Discovery (Camp North) • Extended Vein projections in Camp Deposit No. 3 Vein North • Summer ‘2 drilling (completed) • New assays released from first thirteen holes • Targeting further extensions of the No. 3 Vein George Lake T arget • Summer ‘24 drilling (completed) • 18 holes - 7,553 metres • Tested 550 metres of strike- length 2024 Exploration • Four areas targeted: 42 holes completed totaling 17,209 metres; • No. 3 Vein extended 400m to the northwest 2025 Drilling • Focused on further No. 3 North extensions
Page 13
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Silver Queen Project New Targeting: No. 3 North Target 2025 Drilling has confirmed the projection of mineralization down-dip of 2024 results ➢ SQ25-148: 3.5m averaging 536g/t AgEq inc 0.7m averaging 1,374g/t AgEq ➢ SQ25-148: 1.7m averaging 788g/t AgEq inc 0.9m averaging 1,123g/t AgEq ➢ SQ25-164: 1.7m averaging 910g/t AgEq 2025 drilling continues to test the down-dip and along strike of the 2024 results over a lateral extent of +650 metres 13 Silver Equivalents were calculated using relative recoveries and prices between the component metals and silver to determine a final AgEq value. Silver Equivalent values were calculated using average long-term prices of $20/oz silver, $1,700/oz gold, $3.50/lb copper, $0.95/lb lead and $1.45/lb zinc. All metal prices are stated in $USD. Process recoveries used were Au 70%, Ag 80%, Cu 80%, Pb 81% and Zn 90%. Drilling is designed to follow up on 2024 drill results and systematically extend mineral resources in areas immediately adjacent to existing U/G infrastructure
Page 14
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD No. 3 North T arget 2025 Assay Highlights ETT(m) SQ25-147 289.8 290.2 0.5 0.3 1.2 37 0.1 0.4 0.4 2.2 158 SQ25-148 248.3 252.2 3.9 3.5 2.3 167 1.3 0.3 2.0 7.4 536 inc. 248.3 249.1 0.8 0.7 2.8 491 4.5 0.8 6.1 19.0 1374 SQ25-148 273.4 275.3 1.9 1.7 3.7 39 0.2 0.5 13.8 10.9 788 inc. 273.4 274.4 1.0 0.9 6.3 30 0.2 0.2 18.7 15.5 1123 SQ25-149 239.0 240.0 1.0 0.7 0.6 24 0.1 0.2 2.8 2.4 171 SQ25-149 345.0 347.1 2.1 1.5 0.8 34 0.1 0.5 3.1 2.9 210 inc. 346.4 347.1 0.7 0.5 1.0 25 0.0 1.2 6.3 4.5 326 SQ25-150 296.4 302.9 6.6 5.3 0.5 23 0.1 0.4 3.7 2.8 203 63.5% Dilution inc. 296.4 296.9 0.5 0.4 1.0 14 0.1 0.1 5.1 3.7 270 and inc. 301.1 302.4 1.3 1.0 1.8 103 0.4 2.1 15.4 11.4 825 SQ25-150 352.8 353.7 0.9 0.7 0.5 23 0.0 0.3 3.1 2.3 169 SQ25-150 381.0 382.3 1.3 1.0 0.6 12 0.1 0.2 2.7 2.1 150 SQ25-151 291.1 294.1 3.0 2.4 0.6 12 0.1 0.2 7.4 4.2 305 42% Dilution inc. 291.1 291.7 0.6 0.5 1.8 39 0.2 0.2 34.9 18.4 1331 SQ25-152 88.0 89.2 1.2 0.9 1.7 223 1.2 1.3 2.9 8.2 592 No. 3 Vein SQ25-153 200.8 201.8 1.0 0.8 0.4 87 0.3 0.7 9.2 6.3 457 No. 3 Vein and 320.0 322.0 2.0 1.6 0.3 200 0.0 0.1 0.5 3.4 245 and 381.5 382.6 1.1 0.8 0.0 641 0.0 0.1 0.3 9.1 659 Footwall Vein (No. 1?) SQ25-154 257.4 257.9 0.5 0.3 0.6 91 0.2 5.2 14.2 10.1 733 No 3 Vein SQ25-155 192.2 -62.5 267.0 NSV NSV NSV NSV NSV NSV NSV NSV SQ25-156 135.3 135.7 0.4 0.3 1.7 179 1.9 2.8 2.6 8.8 638 No. 3 Vein and 221.6 222.0 0.4 0.3 1.3 111 0.1 8.5 18.2 13.7 993 No. 2 Vein SQ25-157 120.7 123.7 3.0 2.5 1.2 79 0.3 2.5 7.0 6.6 478 No. 3 Vein inc. 121.1 121.5 0.4 0.3 0.8 295 0.7 10.7 24.2 20.0 1448 and 180.0 181.3 1.3 1.1 0.5 49 0.0 1.5 3.9 3.4 248 inc. 180.8 181.3 0.5 0.4 0.8 88 0.1 2.8 8.3 6.7 486 From (m) To (m) Interval (m) CommentsAg (g/t) Cu (%) Pb (%) Zn (%) AuEq (g/t) AgEq (g/t) Au (g/t) ETT(m) SQ25-147 289.8 290.2 0.5 0.3 1.2 37 0.1 0.4 0.4 2.2 158 SQ25-148 248.3 252.2 3.9 3.5 2.3 167 1.3 0.3 2.0 7.4 536 inc. 248.3 249.1 0.8 0.7 2.8 491 4.5 0.8 6.1 19.0 1374 SQ25-148 273.4 275.3 1.9 1.7 3.7 39 0.2 0.5 13.8 10.9 788 inc. 273.4 274.4 1.0 0.9 6.3 30 0.2 0.2 18.7 15.5 1123 SQ25-149 239.0 240.0 1.0 0.7 0.6 24 0.1 0.2 2.8 2.4 171 SQ25-149 345.0 347.1 2.1 1.5 0.8 34 0.1 0.5 3.1 2.9 210 inc. 346.4 347.1 0.7 0.5 1.0 25 0.0 1.2 6.3 4.5 326 SQ25-150 296.4 302.9 6.6 5.3 0.5 23 0.1 0.4 3.7 2.8 203 63.5% Dilution inc. 296.4 296.9 0.5 0.4 1.0 14 0.1 0.1 5.1 3.7 270 and inc. 301.1 302.4 1.3 1.0 1.8 103 0.4 2.1 15.4 11.4 825 SQ25-150 352.8 353.7 0.9 0.7 0.5 23 0.0 0.3 3.1 2.3 169 SQ25-150 381.0 382.3 1.3 1.0 0.6 12 0.1 0.2 2.7 2.1 150 SQ25-151 291.1 294.1 3.0 2.4 0.6 12 0.1 0.2 7.4 4.2 305 42% Dilution inc. 291.1 291.7 0.6 0.5 1.8 39 0.2 0.2 34.9 18.4 1331 SQ25-152 88.0 89.2 1.2 0.9 1.7 223 1.2 1.3 2.9 8.2 592 No. 3 Vein SQ25-153 200.8 201.8 1.0 0.8 0.4 87 0.3 0.7 9.2 6.3 457 No. 3 Vein and 320.0 322.0 2.0 1.6 0.3 200 0.0 0.1 0.5 3.4 245 and 381.5 382.6 1.1 0.8 0.0 641 0.0 0.1 0.3 9.1 659 Footwall Vein (No. 1?) SQ25-154 257.4 257.9 0.5 0.3 0.6 91 0.2 5.2 14.2 10.1 733 No 3 Vein SQ25-155 192.2 -62.5 267.0 NSV NSV NSV NSV NSV NSV NSV NSV SQ25-156 135.3 135.7 0.4 0.3 1.7 179 1.9 2.8 2.6 8.8 638 No. 3 Vein and 221.6 222.0 0.4 0.3 1.3 111 0.1 8.5 18.2 13.7 993 No. 2 Vein SQ25-157 120.7 123.7 3.0 2.5 1.2 79 0.3 2.5 7.0 6.6 478 No. 3 Vein inc. 121.1 121.5 0.4 0.3 0.8 295 0.7 10.7 24.2 20.0 1448 and 180.0 181.3 1.3 1.1 0.5 49 0.0 1.5 3.9 3.4 248 inc. 180.8 181.3 0.5 0.4 0.8 88 0.1 2.8 8.3 6.7 486 From (m) To (m) Interval (m) CommentsAg (g/t) Cu (%) Pb (%) Zn (%) AuEq (g/t) AgEq (g/t) Au (g/t) 14
Page 15
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD No. 3 North Target 2025 Core Photos 15 Mineralized Zone: SQ-148 Mineralized Zone: SQ-151 Mineralized Zone: SQ-157 Mineralized Zone: SQ-1600.7m @ 2.8g/t Au; 491g/t Ag, 4.5% Cu, 6.1% Zn 0.5m @ 1.8g/t Au; 39g/t Ag, 34% Zn 0.3m @ 0.8g/t Au; 295g/t Ag, 0.7% Cu, 10.7% Pb, 24.2% Zn 0.7m @ 8.9g/t Au; 890g/t Ag, 4.8% Cu, 0.3% Pb, 0.2% Zn
Page 16
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Drilling Underway at Silver Queen Property • Up to 16 holes totaling 4,526m • Drilling will target a 1km strike-length of the No. 3 vein to validate earlier historic drilling and • To get material for further metallurgical test work • New “Greenfields” targets have been identified to test in a Spring ‘26 program Silver Queen Project 2026 Drill Targeting – No. 3 Vein 16
Page 17
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Silver Queen Project 2026 Drill Targeting – No. 3 Vein 17 Objectives of Q1 2026 Drilling • Drilling is focused on testing and verifying resource modelling from the historic drill data from the No. 3 Vein; assays pending • Six of sixteen holes completed to date • Drilling will also test gaps in the historic drill pattern that could add mineralization in certain areas • No. 3 Vein mineral resources are adjacent to existing historic underground development which could accelerate development 150m >500 400-500 300-400 200-300 100-200 <100 NSR (CAD$t) Proposed/Drilled 2026 DDH For details on NSR Calculation, refer to 2022 resource estimate available on sedar and on company’s website 2022 Mineral Resource Estimate NWSE
Page 18
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Silver Queen Project Exploration History and Outlook Silver Queen Property – Project Outlook • ’2 Q4: Modelling of drill data at George Lk , No. 3 North targets and Camp - Sveinson deposits; including recent drilling at No. 3 North, Camp and other targets – In progress • ’26 Q1: Mineral Resource Update – targeting February • ‘26 Q1-Q2: Re-habilitate access to the underground workings - Lidar scan of the workings – Re-permitting in progress • ‘26 Q1-Q2: Work to evaluate a PEA product • ‘26 early Q3: PEA Technical Report (assuming positive review) • ‘26 Q1-Q4: New Exploration – $3.0M exploration planned and funded ➢ Due diligence drilling on the No. 3 Vein – Started Jan’26 ➢ Drilling downdip in connector zone ➢ New targeting in the South Itsit area 18
Page 19
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Arlington Property Property Summary 19 District-scale property in southern British Columbia • Nine tenure claims covering 3,584ha in the Greenwood Mining District within the Okanagan sub-terrane of the prolific Quesnel Terrane • Year-round access by Highway 33 from the south via the community of Rock Creek and from the north via Kelowna • Moderate rolling terrane with extensive Logging Roads allows access into and throughout the Property Potential analogue to known productive historic mines: • Buckhorn Mine (+1Moz high grade historic Au production) from Au-Cu magnetite skarn • Phoenix Mine (1Moz Au, 6Moz Ag and 500Mlb Cu production) from Au-Cu magnetite skarn • Beaverdell Mining (35Mozs Ag production from) high-grade polymetallic veins
Page 20
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Arlington Project Background and History 20 • Historic placer claims from mining starting in late 1880s with the source of gold not found • Multiple new discoveries in an area with only sporadic exploration since late 1880s • High-grade Rock Sampling results – up to 11.67g/t Au, 3.22% Cu and >1% Mo • Four Deposit Target Types Identified: 1. High-grade Au-enriched poly-metallic quartz veins Arlington area; 2. Cu magnetite skarn Arlington and Rona areas; 3. Intrusion related Au-As veins identified in the Fresh Pots target area; and 4. Cu-Ag-Mo porphyry system in the Rona area Historic Adit Targeting Cu-Au Skarn on the Property Small-scale mining activity starting 130 years ago
Page 21
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Arlington Project Geology and Target Types 21 Arlington Showings • Polymetallic veins and Replacements • Significant historical workings reflect a long exploration history dating back to the late 1880’s • 13 Mineral occurrences include: – Polymetallic Quartz Veins – Disseminations/Replacement on shear/vein margins – Magnetite Cu Skarn Rona Cu-Mo-Ag T arget • Large Cu-Ni-Mo-Ag soil anomaly • Mineralized mafic/ultramafic intrusion • Skarn potential in adjacent sedimentary rocks Fresh Pots Au-Ag T arget • Drill ready Intrusion–related gold target • Large 2km x 1km Au-in-soil anomaly associated with Ag-As-Sb-Bi-W • Historic Au-Placer Deposits • 3,407m drilling completed
Page 22
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Arlington Project Geophysical Surveys • Property-wide Airborne Magnetic Survey flown in January 2025 • The Fresh Pots soil anomaly is characterized by a prominent magnetic low and • An elevated K/Th radiometric signature identified in an airborne magnetic/radiometric survey flown over the entire 5,387ha Arlington property in January 2025 Airborne Magnetic - Radiometric Survey
Page 23
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Arlington Project Fresh Pots Au-Ag Target Fresh Pots Gold in Soils 2022 and 2024 2025 Drilling 23 • Nine holes totalling 3,407m completed • Drilling targeted three clusters of Au-Ag in soil anomalies in the south Fresh Pots anomaly AR25-001 13.9 15.5 1.6 3.9 0.29 4.3 AR25-001 42.0 52.0 10.0 0.3 0.02 0.4 AR25-002 12.8 13.2 0.4 6.8 0.10 6.9 AR25-002 112.5 124.0 11.5 0.3 0.01 0.3 AR25-002 184.7 191.0 6.3 0.4 0.05 0.4 AR25-003 14.7 15.1 0.4 7.6 0.14 7.8 AR25-003 61.0 63.0 2.0 1.0 0.01 1.0 AR25-004 118.0 125.0 7.0 1.2 0.03 1.2 inc. 119.3 119.8 0.5 12.0 0.00 12.0 AR25-004 242.0 242.6 0.7 2.7 0.04 2.7 AR25-005 9.2 10.2 1.0 0.5 0.03 0.5 AR25-005 55.1 55.4 0.4 1.3 0.03 1.3 AR25-005 110.5 112.5 2.0 3.1 0.01 3.1 AR25-005 123.0 123.7 0.7 1.2 0.03 1.2 AR25-006 73.5 73.9 0.4 7.7 0.23 8.0 AR25-006 101.8 103.0 1.2 0.8 0.02 0.8 AR25-007 41.4 44.2 2.8 1.2 0.04 1.2 AR25-008 4.8 6.0 1.3 0.9 0.05 1.0 AR25-008 260.0 262.0 2.0 0.6 0.00 0.6 AR25-009 75.6 76.5 0.9 0.6 0.02 0.6 Cu (%) AuEq (g/t)Hole # From (m) To (m) Interval (m) Au (g/t)
Page 24
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Arlington Project Rona Cu-Mo Porphyry Target Example of Rock from Vein in Rona Area • Greenfields discovery with several undocumented workings • Pyroxenite intrusive associated with a strong Cu-Ni anomaly • Argillic alteration mapped extensively in metasedimentary rocks. The source of alteration is unknown • Samples assay up to >1% Mo, 0.61% Cu, 0.6g/t Au and 32.4g/t Ag • Further surface work planned for 2025 to upgrade targeting 24
Page 25
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Arlington Property Arlington Epithermal Au Target • Staked by technical team in 2015, work performed in 2015, 2017, 2018 comprising soil surveys, ground magnetic/VLF surveys and prospecting • All 13 Historical known showings revisited; mineralization confirmed. Highlights: • Arlington – 2.56 % Cu, 131 g/t Ag • Bru 22 – 10.89 g/t Au • New Showings Discovered in 2022 - Quartz Veins and Breccias in old undocumented workings. • Arlington North – 1.86 g/t Au, 22 g/t Ag, 1.07% Cu • Arlington South – 11.67 g/t Au, 211 g/t Ag, 3.22% Cu • +5km Strike Length now delineated by sampling • Further work required to determine best drill targets within the +5km of strike length 2022 Sampling Highlights on Arlington Trend 25
Page 26
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Equity Metals 2026 Project Outlook Arlington Property – Project Outlook ‘26Q2 - Q3: Infill soiling and prospecting to upgrade North Fresh Pots and other targets ‘26Q4: Drilling to test new targets Budget estimate: C$0.25 to C$1.2M 26
Page 27
equitymetalscorporation.com TSXV:EQTY / OTCQB:EQMEF/ FSE-EGSD Why Invest In Equity Metals? 2024 Fall Silver Queen Drilling +17,000m Drilling Complete, Extends Known Mineralized zones Exceptional Ag-Au Assays; Further Exploration Upside New Arlington Acquisition New Au-Ag Targets Identified 2025 Drill Programs Completed Silver Queen Mineral Resource Update Pending Balanced Portfolio Exposure to Precious, Base and EV Metals; Diamonds Providing Investment Opportunities by Unlocking the Demand for Critical Metals Through Exploration in British Columbia, Canada 27
Page 28
TSXV:EQTY / OTCQB: EQMEF equitymetalscorporation.com Contact 1100 - 1199 West Hastings Street Vancouver, BC Canada V6E 3T5 Phone: (604) 641-2759 Email: corpdev@mnxltd.com Questions?