Slides
Page 1
RILL K92 MINING INC . ED - 900 K92 MINING INC . Growing Production & Transformative Discoveries INVESTOR PRESENTATION August 2026 PDAC PROSPECTORS & DEVELOPERS ASSOCIATION OF CANADA 2021 THAYER LINDSLEY AWARD ( BEST GLOBAL DISCOVERY )
Page 2
TSX: KNT OTCQX: KNTNF 2 Forward-Looking and Cautionary Statements This Presentation is being provided for information purposes only and does not constitute or form part of, and should not be construed as, an offer or invitation to sell or any solicitation of any offer to purchase or subscribe for any securities of K92 Mining Inc. (the “Company” or “K92”) in Canada, the United States or any other jurisdiction. Trading in the securities of the Company should be considered highly speculative. CAUTIONARY STATEMENT REGARDING FORWARD LOOKING INFORMATION Certain statements, beliefs and opinions in this presentation, including any information relating to K92’s future financial or operating performance contained in text, graphs, tables and charts are “forward looking” under applicable Canadian legislation, which reflect the Company’s current expectations and projections about future events. Forward-looking statements are generally identified by the use of terminology such as “plans”, “expects”, “is expected”, “budget”, “scheduled”, “targeted”, “estimates”, “forecasts”, “intends”, “anticipates”, “projects”, “potential”, “believes” or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “should”, “might” or “will be taken”, “occur” or “be achieved” or the negative connotation of such terms. Forward-looking statements are based on estimates and assumptions as of the date of this presentation regarding K92’s future fin ancial or operating performance that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied and which are beyond the Company’s ability to control or predict. Forward-looking statements contained in this presentation regarding past trends or activities should not be taken as a representation that such trends or activities will continue in the future and are not guarantees of future performance. All statements regarding: the definitive feasibility study (DFS) of the Kainantu Gold Mine; the Stage 3 Expansion and Stage 4 Expansion; expectations of future cash flows; expectations of future pr oduction results; expected success of the proposed plant expansions; the generation of further drilling results; potential expansion of resources or reserves are forward -looking and may or may not occur. Information contained herein is based on certain factors and assumptions including: there being no signific ant disruptions affecting the Company’s operations; political and legal developments in Papua New Guinea being consistent with the Company’s current expectations; the accuracy of K92’s mi neral reserve and mineral resource estimates; exchange rates between the Canadian dollar, U.S. dollar, and the Papua New Guinea Kina being consistent with current levels; prices for key supplies being consistent with expected levels; equipment, labor and materials costs increasing on a basis consistent wit h K92’s expectations; all required permits, licenses and authorizations being obtained from the relevant governments and other relevant stakeholders within the expected timelines and the absence of material negative comments during the applicable regulatory processes; the market price of the Company’s securities; metal price; taxation; the estimation, timing and amount of future exploration and development; capital and operating costs; the availability of financing; the receipt of necessary regulatory approvals; environmental risks; title disputes; failure of plant, equipment or processes to operate as anticipated ; accidents; labor disputes; claims and limitations on insurance coverage and other risks of the mining industry. In addition, there are risks and hazards associated with the business of mineral exploration, development and mining, including environmental events and hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, and flooding and gold bullion losses, and the risk of inadequate insurance or inability to obtain insurance to cover these risks. Risks and certain other material assumptions regarding such forward-looking statements are discussed in K92’s annual information form, annual management’s discussion and analysis (”MD&A”), and annual financial statements filed on SEDAR+ at www.sedarplus.ca. Accordingly, all of the forward-looking statements contained herein are qualified by these cautionary statements. K92 expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, events or otherwise, except in accordance with applicable securities laws. No person should place undue reliance on forward -looking statements, which speak only as of the date of this presentation. NON-IFRS MEASURES This presentation includes certain terms or performance measures commonly used in the mining industry that are not defined under International Financial Reporting Standards (“IFRS”), including “cash operating costs”, “earnings before interest, taxes, dep reciation and amortization” (“EBITDA”), and “all-in sustaining costs” (“AISC”). Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data presented is intended to provide additional infor mation and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS and should be read in conjunction with K92’s con solidated financial statements. Readers should refer to K92’s MD&A under the heading “Non -IFRS Performance Measures”, available on SEDAR+ and K92’s website, for a more detailed discussion of how the Company calculates such measures and a reconciliation of certain measures to IFRS terms. CAUTIONARY NOTE TO U.S. READERS CONCERNING ESTIMATES OF MINERAL RESERVES AND MINERAL RESOURCES Information concerning the properties and operations of K92 has been prepared in accordance with Canadian standards under app licable Canadian securities laws and may not be comparable to similar information for United States companies. The terms “Minera l Resource”, “Measured Mineral Resource”, “Indicated Mineral Resource” and “Inferred Mineral Resource” used in this presentation are Canadian mining terms as defined i n the Definition Standards for Mineral Resources and Mineral Reserves adopted by the Canadian Institute of Mining, Metallurgy an d Petroleum (“CIM Definition Standards”), and incorporated by reference in National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43 -101”). The SEC amended the disclosure requirements and policies for mining properties (“SEC Modernization Rules”) to more closely al ign with current industry and global regulatory practices and standards, and became effective in 2019, with compliance required for the first fiscal year beginning on or after January 1, 2021. We have replaced the historical property disclosure requirements for mining registrants that were included in SEC Industry Guide 7. The SEC now recognizes estimates of "measured mineral resources," "indicated mineral resources" and "inferred minera l resources". In addition, the SEC has amended its definitions of “proven mineral reserves” and “probable mineral reserves” to be substantially similar to the corresponding def initions under the CIM Definition Standards. While the SEC Modernization Rules are "substantially similar" to the CIM Definition Standards, readers are cautioned that there are differences between the SEC Modernization Rules and the CIM Definitions Standards. Accordingly, there is no assurance any mineral reserve s or mineral resources that the Company may report as “proven mineral reserves”, “probable mineral reserves”, "measured mineral resources", "indicated mineral resources" and "inferred mineral resources" under NI 43-101 would be the same had the Company prepared the reserve and resource estimates under the standards adopted under the SEC Modernization Rules. United States investors are also cautioned that while the SEC now recognizes “indicated mineral resources” and “inferred mine ral resources”, investors should not assume that any part or all of the mineralization in these categories will ever be converted into a higher category of mineral resources or into mineral reserves. Mineralization described using these terms has a greater amount of uncertainty as to their existence and feasibilit y than mineralization that has been characterized as reserves. Accordingly, investors are cautioned not to assume that any “indi cated mineral resources” or “inferred mineral resources” that the Company reports are or will be economically or legally mineable. Further, “inferred mineral resources” have a greater amount of uncertainty as to their existence and as to whether they can be mined legally or economically. Therefore, United States investors are also cautioned not to assume that all or any part of the “inferred mineral resources” exist. In accordance with Canadian securities laws, estimates of “inferred mineral r esources” cannot form the basis of feasibility or other economic studies, except in limited circumstances where permitted under NI 43-101. The mineral reserve and mineral resource data set out in this presentation are estimates, and no assurance can be given that the anticipated tonnages and grades will be achieved or that the indicated level of recovery will be realized. The Company does n ot include equivalent gold ounces for by-product metals contained in mineral reserves in its calculation of contained ounces and mineral reserves are not reported as a subset of min eral resources. QUALIFIED PERSON: The scientific and technical information contained herein has been reviewed and approved by Mr. Andrew Kohler, PGeo, K92’s Mi ne Geology Manager and Mine Exploration Manager, and a Qualified Person as defined by NI 43 -101. NI 43-101 – the Updated Definitive Feasibility (“Updated DFS”) that includes the DFS and previous resource estimates is included in a technical report titled, “Independent Technical Report, Kainantu Gold Mine, Updated Definitive Feasibility Study, Kainantu Project, Papua New Guinea” dated March 21, 2025, with an effective date of January 1, 2024. Readers are encouraged to review the full text of the technical report, which is availa ble on K92’s website and under the Company’s profile on SEDAR+.
Page 3
TSX: KNT OTCQX: KNTNF 3 0.4 1.1 2.2 2.2 2.71.6 2.3 3.7 2.7 2.7 4.5 14.6 14.6 YE 2017 YE 2018 2Q 2020 1Q 2022 3Q 2022 4Q 2023 Kora & Judd - M&I Kora & Judd Inferred Blue Lake - Inferred K92 Mining – A Unique Tier-1 Opportunity Rapid near-term growth to Tier 1 Mid-Tier Producer towards 500 koz AuEq pa at industry leading low costs • Stage 3 Expansion to 300 koz AuEq pa (1.2 mtpa plant delivered under budget and first saleable production recorded early Oct/2025) average AISC of $920/oz AuEq. • Stage 4 Expansion to +400 koz AuEq pa (commissioning targeting late-2027) Strong balance sheet and mine cash flow supports mine transformation Experienced team with proven track record in Papua New Guinea ESG focused with strong relationships with government, community and workforce Significant re-rating potential ahead and during execution of near-term expansions • Consensus P/NAV of 0.6x NAV vs Mid-Tier Producers at 0.8x NAV(1) Large, high-grade resource with significant growth potential from multiple deposits • $31-35m exploration budget in 2026, potential to increase to $40m upon delivery of Stage 3 Expansion • Arakompa Maiden Mineral Resource targeting 2H 2026. Mid-Tier Producer Growth Profile (koz AuEq) K92 Resource Growth Profile (moz AuEq) Exceeded Guidance Stage 2 Commissioned In 3Q20 Exceeded Guidance Exceeded Updated Guidance Achieved Guidance Exceeded Updated Guidance Exceeded Guidance Note 1: Data based on analyst consensus estimates provided by BMO Capital Markets. Prices as of July 15, 2026. 2 Drill Rigs in 2018 5 Drill Rigs in 2019 Up to 11 Drill Rigs in 2021-2025, 14 Drill Rigs 2026+ Note 2: Kora and Judd resource estimates - refer to technical report dated March 21, 2025, and titled, “Independent Technical Report, Kainantu Gold Mine, Updated Definitive Feasibility Study, Kainantu Project, Papua New Guinea”. Blue Lake resource estimate – refer to Technical Report dated March 21, 2025 and titled, “Independent Technical Report, Mineral Resource Estimate Blue Lake Porphyry, Kainantu Project, Papua New Guinea”. Achieved Guidance
Page 4
TSX: KNT OTCQX: KNTNF 4 Attractive Valuation - Compelling Re-Rate Opportunity Note: Prices as of July 15, 2026. 2025 production based on actual results, excluding Centerra. 2029E peer production estimates based on BMO CM Equity Research Model & analyst consensus estimates; K92 2029E production based on projected Stage 4 expansion production rate. NAV based on analyst consensus estimates. Courtesy of BMO Capital Markets. P / NAV 2025 – 2029E Production Growth (koz AuEq) +130% Significant Re-Rate Potential As K92 Transitions Into Becoming a Tier-1, Mid-Tier Producer +27% Peer Average: 0.8x
Page 5
TSX: KNT OTCQX: KNTNF 5 Operation Company Reserve Grade 2025 Grade BMO Forecasted 2026 AISC (Au g/t) (Au g/t) ($/oz Au)5 Macassa Agnico Eagle 8.8 17.4 $1,347 Turquoise Ridge4 Barrick / Newmont 10.6 12.5 $1,591 Island Gold Alamos Gold 10.6 11.4 $1,421 Mponeng Harmony Gold 9.4 10.8 $2,180 Kainantu2 K92 Mining 8.5 10.3 $1,300 Segovia Aris Mining 10.7 9.8 $2,188 Fruta Del Norte Lundin Gold 7.1 9.5 $1,206 Cerro Negro Newmont 10.6 8.3 $2,161 Moab Khotsong3 Harmony Gold 9.4 7.9 $2,416 Carlin Barrick / Newmont 8.2 7.3 $2,027 Pogo Northern Star 7.2 6.8 $1,666 Obuasi4 Anglogold Ashanti 10.9 6.2 $2,018 Amongst The Highest Grade, Lowest Cost Operating Mines Globally Note 1: List of operations Reserve Grade and 2025 Grade are based on publicly disclosed 2025 Reserves and may not be exhaustive or up to date. Note 2: Gold Equivalent 2P Reserves and 2025 Grade - refer to technical report dated March 21, 2025 and titled, “Independent Technical Report, Kainantu Gold Mine, Updated Definitive Feasibility Study, Kainantu Project, Papua New Guinea”. Kainantu AISC based on company guidance. Note 3: 2026 forecasted AISC for Moab Khotsong shown on a co-product basis. Note 4: Combined Open Pit and Underground forecast AISC. Note 5: BMO Estimates provided as at April 6, 2026. K92 Estimate is mid-point of 2026 guidance. Judd 1365 Level In addition to being high-grade, Kainantu has excellent geological continuity, robust thickness, sub- vertical geometry, strong geotechnical conditions and favourable metallurgy, enabling a highly productive, low-cost mining operation Proven and Probable Reserves (>1 Moz Contained Ounces) and AISC (US$/oz Au) 1
Page 6
TSX: KNT OTCQX: KNTNF 6 Located Amongst World Class Geology and Excellent Infrastructure Large ~830 km2 land package along major regional structure hosting multiple large world-class deposits/mines (Ramu, Wafi-Golpu, Hidden Valley) Excellent and Well-Developed Infrastructure • Plant, tailings dam and infrastructure located ~6.5 km from mine portal in Markham Valley (lowlands, plenty of land for construction) • Sealed road from Port of Lae • Hydro grid power (full standby diesel gen sets) • Commercial airstrip Natural Resource Friendly Jurisdiction • Multiple Senior Mining Companies Operating (Barrick, Harmony, Newmont) • Vibrant democracy since independence in 1975 • ~88% of exports from mining, oil and gas(1) Located along the Prolific Pacific Ring of Fire, hosting multiple world- class deposits in both PNG and West Papua Note 1: 2024 EITI Report.
Page 7
TSX: KNT OTCQX: KNTNF 7 Institutional 53% Insider 5% Retail / Non- Filing Institutional 42% Corporate Structure Chart courtesy of StockCharts.com Note 1: Insider data includes dilutables. Shareholder information based on data from Irwin. Key Financial Data (for the period ending June 30/26) Analyst Coverage Symbol TSX: KNT, OTCQX: KNTNF Fully Diluted Shares Outstanding 247.4 Cash and Cash Equivalents US$349m Debt US$40m Remaining Additional Liquidity Up to US$60m Fully Funded to Execute Growth Trajectory Strong Cash Balance Significant Available Liquidity From Credit Facilities Record Production and Record Gold Prices = Strong Operational Cash Flow Downside Protected During Construction Puts Purchased for US$5.9m in November 2025 covering 10,000 oz Au per month at $3,500/oz for 12 months (starting Jan/2026), to protect against commodity price risk during the construction. This is not a hedge, this is insurance, and we retain FULL EXPOSURE TO THE UPSIDE IN COMMODITY PRICES. Shareholder Overview (1) Michael Gray Andrew Mikitchook Peter Bell Varun Arora Nic Dion Bryce Adams Alex Terentiew Craig Stanley Harrison Reynolds Ovais Habib Ralph Profiti Wayne Lam Analyst Transition
Page 8
TSX: KNT OTCQX: KNTNF 8 Delivering Sustainable Value – 2025 Sustainability Report K92 maintains a strong commitment to the prosperity and development of PNG and our host communities through responsible mining practices and a strategic commitment to delivering sustainable value. Communities • Outstanding Community Humanitarian Initiative awarded by the PNG Chamber of Resources and Energy (“CORE”) in 2025 for the K92 Adult Literacy Program • Fourth consecutive year K92 has received primary community-related award from the PNG CORE, reflecting strong Company commitment to community relations • Creating business opportunities for landowner groups via Joint Ventures with local businesses, including $33.1M spent in 2025 People • Provide employment to +3,100 people across operational workforce, with ~91% of employees and permanent contractors being PNG Nationals and majority from local communities • Developing skills through multiple MOUs with PNG tertiary institutions • Providing tertiary education scholarships for PNG students with 68 awarded in 2025 • Kainantu Endowment programming ongoing to provide training and skills development opportunities to Papua New Guineans Environment • Operate a low-footprint underground mine with downstream tailings impoundment and no permanent surface waste rock facilities • No cyanide used for processing • Target a 25% reduction in GHG emissions by 2030 (against a business-as-usual forecast) • Hydropower is a significant power source at the Kainantu Gold Mine, with solar power now being investigated Government • $139.2M in taxes and royalties paid/accrued in 2025 (one of the largest mining corporate income taxpayers in PNG) • $6.6M allocated for Company’s inaugural project under the Infrastructure Tax Credit Scheme (“ITCS”) of the Government of PNG • Future ITCS projects currently being planned with a focus on education, health, infrastructure, and law & order projects
Page 9
TSX: KNT OTCQX: KNTNF 9 K92 has created and continues to create significant value through exploration and expansion Value Creation Through Discovery 1.7 moz at 11.6 g/t AuEq Inferred1 (Long Sections, Looking West) Kora North Kora and Judd 2.3 moz at 9.3 g/t AuEq Measured & Indicated 2.6 moz at 9.1 g/t AuEq Inferred2 Kora and Judd 2.6 moz at 10.0 g/t AuEq Measured & Indicated 4.5 moz at 8.5 g/t AuEq Inferred3 1) Inferred Resource Grade: 11.6 g/t AuEq (7.1 g/t Au, 34 g/t Ag, 2.2% Cu). 2) Measured and Indicated Resource Grade: 9.3 g/t AuEq (7.7 g/t Au, 18 g/t Ag, 0.9% Cu). Inferred Resource Grade: 9.1 g/t AuEq (6.8 g/t Au, 26 g/t Ag, 1.3% Cu). 3) Measured and Indicated Resource Grade: 10.0 g/t AuEq (7.8 g/t Au, 21 g/t Ag, 1.2% Cu). Inferred Resource Grade: 8.5 g/t AuEq (5.7 g/t Au, 27 g/t Ag, 1.5% Cu). May 2017 October / December 2021 September 2023
Page 10
TSX: KNT OTCQX: KNTNF 10 2025 Was A Transformational Year for K92 Stage 3 Expansion Process Plant Grand Opening on October 16 – Delivered Under Budget
Page 11
TSX: KNT OTCQX: KNTNF 11 Key Figures 2026 Operational Guidance – Another Major Step Forward Planned Key Highlights • Production Growth: Production in H2 2026 is expected to be the strongest, driven by the ramp-up of ore tonnes mined and processed from two new mining fronts & the completion of major expansion enabler projects • Record Exploration Program: Total rigs to increase to 14 in Q1 2026 from 12 rigs currently – focused on highly prospective near-mine and regional targets • Growth Capital: As at June 30, 2026, 98% of the Stage 3 Expansion growth capital is either spent or committed, and the project remains on budget. Given the strong financial position with record net cash achieved at YE 2025, Stage 3 Expansion capital expenditure nearing completion, already mobilized contractors and a proven Project Owner’s Team, K92 is bringing forward several growth and Stage 4 Expansion projects in 2026, including the following key items: o Stage 4 Expansion Power Plant Upgrade to 15.3 MW ($6 million) o Stage 4 Expansion Haul Road Upgrade ($5 million) o 132 kV Power Supply and Line Upgrade ($9 million) – Increase reliability and delivery capacity of clean hydro electricity for the Stage 4 Expansion. Key part of our 2030 GHG Reduction Target strategy. Long-term recovery of capital from reduced operating cost expected. o Stage 4 Expansion Water Treatment and Management Upgrade ($8 million) o Stage 4 Expansion Engineering, Project Management & Owners’ Team ($10 million) o Camp Expansion and Facilities Upgrade ($5 million) o Stage 4 Expansion Vertical Mine Development ($11 million) o Port Upgrade ($3 million) – Improve efficiency and capabilities in handling larger volumes of concentrate for the Stage 4 Expansion at the Port of Lae. o Kainantu Community Affairs Office ($3 million) 2026 plans to deliver record production at low costs while also leveraging K92’s strong financial position, proven Project Owner’s Team and already mobilized contractors to bring forward key growth and Stage 4 Expansion projects Amount 2026 Production 190,000 to 225,000 oz AuEq 2026 By-product Cash Cost US$710 to US$770/oz Au 2026 By-product AISC US$1,250 to US$1,350/oz Au 2026 Co-product Cash Cost US$980 to US$1,040/oz AuEq 2026 Co-product AISC US$1,480 to US$1,580/oz AuEq 2026 Exploration US$31 to US$35 million 2026 Growth Capital Stage 3 Expansion Capital Stage 4 Expansion Capital US$100 to US$108 million US$25 to US$28 million US$75 to US$80 million Note: Gold equivalent production based on the following commodity prices: Gold $3,400/oz; Copper $4.40/lb, and; Silver $32.50/oz.
Page 12
TSX: KNT OTCQX: KNTNF 12 Systematically Executing to Become a Tier 1 Mid-Tier Producer Stage 2 400,000 tpa Low Capex Upgrades to Stage 1 Process Plant Stage 2A 500,000 tpa Low Capex Upgrades to Stage 2 Process Plant Stage 3 1,200,000 tpa 300 koz AuEq pa New Stage 3 Process Plant Operating with Stage 2A Plant on Care and Maintenance Stage 4 1,800,000 tpa +400 koz AuEq pa Via Low Capex Expansion of Stage 3 Plant (Upgrade Flotation & Filter Press). Stage 2A Plant Available for Next Stage of Expansion. 4Q 2020 2Q 2023 Plant Commissioning Completed Dec 2025 Targeting Late 2027 Commissioning Note: Numbers presented are rounded figures and correspond with the level of significant figures presented in press release and in the presentation. The Stage 3 and 4 Expansions are fully financed. As of June 30, 2026, 98% of Stage 3 Expansion growth capital has been spent or committed. The project remains on budget, first saleable production from new plant delivered in October 2025 and commissioning was completed in December 2025.
Page 13
TSX: KNT OTCQX: KNTNF 13 Stage 2 Expansion Plant Commissioned Operational Impact Due to Temporary Suspension of Underground Mining Significant Portion of Sustaining Capex is for Upcoming Expansions K92 Achieved Strong Q2 2026 Production of 46,093 oz AuEq Major Sustaining Capex Investment Since 2023 is for Expansions Operational Performance – Since Commercial Production AuEq Production (koz), Co-Product Cash Cost ($/oz AuEq) and Co-Product AISC ($/oz AuEq) Throughput (tpd) 207 188 206 270 298 416 349 330 521 542 703 749 814 832 952 1,084 1,107 1,196 1,282 1,323 1,310 1,236 1,317 1,651 1,436 1,050 1,141 1,050 1,149 1,432 1,491 2,024 1,578 2,483 Au Grade (g/t) 17.0 20.4 16.7 21.8 23.6 16.7 19.2 25.2 13.6 17.6 11.3 14.2 8.5 10.3 9.0 11.2 8.3 7.2 8.7 8.8 5.2 8.2 6.2 7.4 6.4 7.5 13.0 17.3 14.3 8.3 10.7 7.4 10.2 6.2 Cu Grade (%) 0.44% 0.36% 0.37% 0.33% 0.48% 0.34% 0.32% 0.35% 0.36% 0.54% 0.38% 0.36% 0.31% 0.76% 0.48% 0.51% 0.76% 0.56% 0.72% 0.74% 0.70% 0.66% 0.72% 0.87% 0.55% 0.62% 0.58% 0.47% 0.50% 0.55% 0.47% 0.53% 0.56% 0.39% 10koz 11koz 10koz 17koz 20koz 19koz 19koz 24koz 20koz 27koz 22koz 30koz 19koz 25koz 24koz 36koz 28koz 26koz 33koz 36koz 21koz 31koz 26koz 39koz 27koz 24koz 44koz 53koz 48koz 35koz 44koz 47koz 47koz 46koz $565 $611 $889 $530 $424 $580 $645 $500 $751 $577 $722 $652 $757 $806 $672 $537 $647 $734 $617 $619 $902 $719 $814 $654 $1,027 $1,014 $684 $536 $616 $907 $797 $920 $991 $1,045 $749 $803 $1,065 $663 $580 $706 $792 $658 $879 $656 $855 $776 $1,037 $1,094 $812 $735 $871 $975 $975 $935 $1,523 $1,053 $1,347 $1,183 $1,412 $1,549 $1,016 $876 $1,048 $1,489 $1,330 $1,716 $1,587 $1,529 0koz 10koz 20koz 30koz 40koz 50koz 60koz 1Q18 2Q18 3Q18 4Q18 1Q19 2Q19 3Q19 4Q19 1Q20 2Q20 3Q20 4Q20 1Q21 2Q21 3Q21 4Q21 1Q22 2Q22 3Q22 4Q22 1Q23 2Q23 3Q23 4Q23 1Q24 2Q24 3Q24 4Q24 1Q25 2Q25 3Q25 4Q25 1Q26 2Q26 Co-Product Cash Cost (AuEq) Co-Product AISC (AuEq)
Page 14
TSX: KNT OTCQX: KNTNF 14 Kainantu Mine Execution Q2 delivered records across the board: quarterly ore processed (225,965t, +73% YoY), total material mined (426,012t), ore mined (228,254t), and development (3,326m) — including monthly development records in April (1,109m), May (1,150m) and July (1,220m) confirming lateral development rates are now consistently exceeding the Stage 3 target of 1km/month. First production stoping from the 2nd Mining Front also began in April. Total Ore Processed (kt) Total Development (m) Total Mined Material (kt) Operational Impact Due to Temporary Suspension of Underground Mining Throughput optimally reduced to maximize recoveries at higher feed grade
Page 15
TSX: KNT OTCQX: KNTNF 15 Strong Process Plant Performance Recoveries Gold Copper New Stage 3 Expansion Process Plant performed well in its first operating quarters, delivering strong recoveries & multiple daily throughput records above the 3,290 tpd design (Jan 12: 3,945t, Dec 14: 3,822t, Dec 13: 3,794t, June 26: 3,684t) Nine Consecutive Quarters Exceeding Updated DFS Gold Recovery Parameters
Page 16
TSX: KNT OTCQX: KNTNF 16 Near-Term Mine Transformation: Major Infrastructure Upgrades Kora-Irumafimpa Planned Twin Incline and Development Long Section (Looking West) Underground Productivity Is Being Transformed Through Various Near-Term Infrastructure Upgrades 1 2 3 Scope: High Speed 2.9km twin incline, capable of +5 mtpa with conveyors Status: Complete Impact: Transforms material handling efficiency with large and high-speed travel way. 2 Ore Pass System2 Scope: Raise Bore Ore and Waste Pass System to connect Main Mine with Twin Incline Status: First pass operational, second pass completed in late-Q2, third pass completion scheduled for Q4 2026. Impact: Transforms material handling efficiency, improves mining cycle at the Main Mine. Vast majority of material to travel via the highly efficient twin incline. Twin Incline1 Puma Vent Incline3 Scope: Twinning of the existing Puma Incline for vent Status: Breakthrough completed late-February Impact: +150m3/s (+75% vent flow increase) recorded from breakthrough of Puma and Internal Ramp completion meeting initial Stage 3 Expansion requirements. +600m3/s and operational efficiency via allowing one-way traffic flow in twin incline upon electrification of fan chamber (Q3 2026). Pastefill System5 Status: Commissioning of tailings filter plant started end of February 2026, commissioning of underground pastefill plant scheduled for Q4 2026 Impact: Significant improvement to mining method plus mine flexibility via enabling mining in two directions vertically instead of currently one. 5 2 Internal Ramp System4 Status: Internal Ramp Connecting the Main Mine to the Highly Productive Twin Incline Status: Complete Impact: Major operational efficiency improvements as the Main Mine is accessible to the highly productive twin incline and all mining fronts connected via an internal ramp, allowing for one-way traffic flow. 4 2
Page 17
TSX: KNT OTCQX: KNTNF 17 Rapid Ore Transport - Twin Incline Complete The Twin Inclines Are Effectively An Underground Expressway Capable of Throughput Over 5 mtpa with Conveyors which is Significantly Greater than the Stage 4 Expansion Requirements 6 metres 6.5 metres 4 metres 4.5 metres Existing Incline to Main Mine Transported 1 mt (waste & ore) in 2022 New Twin Incline (#2) High Speed, Large Travel way, Gradual Gradient
Page 18
TSX: KNT OTCQX: KNTNF 18 Internal Ramp System – Major Underground Milestone On January 24, 2026, the Main Mine’s Internal Ramp (Decline) was connected to the Twin Incline’s Internal Ramp (Incline) creating “One Mine”, where all mining fronts are linked by common infrastructure to the highly productive Twin Incline, significantly improving traffic flow, mine flexibility and productivity.
Page 19
TSX: KNT OTCQX: KNTNF 19 Ore Pass System – Second Material Pass Now Complete First Material Pass Tonnes Moved in Early August Which Significantly Improves Material Handling Productivity Multiple Surface Haulage Records Achieved Following Material Pass Commissioning and Integration of Surface Haulage Trucks Underground (Eliminates Need for Rehandle) Second Material Pass Completed late Q2, Enabling Dedicated Ore and Waste Passes
Page 20
TSX: KNT OTCQX: KNTNF 20 New Primary Ventilation Commissioning Planned in Q3 2026 15 metres 9.5 metres Puma Ventilation Drive breakthrough was achieved in late February 2026, increasing primary mine airflow from ~200m³ /s to ~350m³ /s, reducing blast re-entry times and meeting initial Stage 3 requirements. With mechanical fan installation complete and HV electrical works advancing, electrification is scheduled for Q3 2026, increasing capacity to +600m³ /s, expandable to ~700m³ /s. To conserve power, fans will initially operate at ~350m³ /s and ramp up as required. Primary Fan Chamber Puma Vent Drive Surface Breakthrough
Page 21
TSX: KNT OTCQX: KNTNF 21 3 x Increase in Mining Fronts in 2026 Kora-Irumafimpa Long Section (Looking West) There Has Been Effectively One Mining Front Producing the Bulk of the Ore Since Commercial Production (Front #1) Second Mining Front Stoping Commenced in April 2026, Third Mining Front Stoping Scheduled to Commence in Q3 2026 Main Mining Front Since Commercial Production Current Status: Developing Five Sublevels Concurrently Commenced Production Stoping in April – Ramping Up 2027: New Mining Front Once Pastefill Online 1 2 3 4
Page 22
TSX: KNT OTCQX: KNTNF 22 Major Underground Mobile Fleet Upgrade & Expansion Underway New Equipment 2026 Equipment Model Fleet YE 2025 Arrived Remaining Use Fleet YE 2026 Change Surface Haul Trucks Volvo A60J (60t) - 51 3 Addition 8 +8 Loaders Sandvik LH-517i 7 4 - Add + Replace 9 +2 Loaders Sandvik LH-621i 1 - 1 Addition 1 +1 Cable Bolter Sandvik DS-422i 1 12 - Addition 2 +1 Jumbos Sandvik DD-422i DC 7 - 1 Addition 8 +1 Charge-up Rig Normet MC-605 3 - 1 Addition 4 +1 Agi Normet LF-600 4 1 - Addition 5 +1 Production Drills Sandvik DL-432i 2 1 - Addition 3 +1 UG Haul Trucks Sandvik TH-545i 8 - 2 Replacement 8 - Paste Binder Haulage Trucks Cat 730 (30t) 10 53 - Replacement 10 - Significant load-and-haul, drilling, explosives-handling and ancillary equipment has been procured, with the majority already on site to support higher mining rates and improved productivity Four new Sandvik 517i loaders now operational YTD Note (1): Of the 5 arrived, 4 are on site; 1 remains in Lae awaiting transport Note (2): Arrived in late 2025 Note (3): Cat 730 (30t) trucks arrived on site in 2H 2025
Page 23
TSX: KNT OTCQX: KNTNF 23 Strong PNG Government and Key Stakeholder Support May 2026 Site Visit – Delegation Led by Minister for Mining Hon. Solen Loifa March 2025 Site Visit – Delegation Led by Governor of EHP Province Hon. Simon Sia TV Source: TVWAN Online Channel, https://www.youtube.com/watch?v=ExkCTbb1VY4. August 2025 Site Visit – Delegation Led by Minister for Mining Hon. Rainbo Paita
Page 24
TSX: KNT OTCQX: KNTNF 24 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 New Standalone Stage 3 Expansion Process Plant (1.2 mtpa) Pastefill Plant Process Capacity Ramp-up to 1.8 mtpa Mine Ramp-up to 1.8 mtpa Primary Ventilation Upgrades Ore/Waste Pass System (First Pass Operational) Internal Ramp (Connecting Twin Incline to Main Mine) Ancillary Infrastructure River Crossing Upgrades (Lower Baupa, Kasese Culvert & Kokomo Bridge) Haul Road Upgrades Near-Term Delivery of Stage 3 & 4 Expansions First saleable production from Stage 3 Expansion Process Plant recorded in early October Process Plant officially inaugurated on October 16th, 2025; Fully Operational since December 2025 Construction Commissioning / Ramp Up Steady-State or Design Nameplate 2025 2026 2027 Phase 2 Phase 4 +200 m3/s +350 m3/s Up to 600 m3/s Phase 1 +150 m3/s Maintenance Workshop Power Plant, Warehouse, New Camp Phase 3 Lower Baupa Kasese & Kokomo Stage 4 UpgradesStage 3 Expansion Road Upgrades
Page 25
TSX: KNT OTCQX: KNTNF 25 Stage 3 Expansion Process Plant New 1.2 Mtpa Process Plant Fully Operational Since December 2025
Page 26
TSX: KNT OTCQX: KNTNF 26 Ancillary Construction Projects Progressing Well Warehouse Construction - Complete Significant amount of ancillary packages are complete, supporting the next phase of expansion New Kumian Creek Camp – Complete (Further Expansion In Progress) Primary Standby Power Station - Complete Phase 1 Expansion Complete (10.7 MW Prime Power Output(1)) Phase 2 Expansion Complete (15.3 MW Prime Power Output(1)) New Maintenance Facilities - In Progress Note (1): Installed power capacity is 1.5 MW greater than prime power output as there has been an allowance made for one generator to be on standby, supporting continuous load operation and preventative maintenance programs.
Page 27
TSX: KNT OTCQX: KNTNF 27 Stage 3 Expansion Update – Underground Paste Plant Advancing Underground Paste Plant Surface Storage System Near Portal All long-lead items are on site and construction is progressing rapidly. Tailings filtration plant commissioning is underway, with the surface storage system and underground paste plant on schedule for commissioning in Q3 and Q4, respectively. Tailings Filtration Plant
Page 28
TSX: KNT OTCQX: KNTNF 28 Pastefill Plant Infrastructure Construction Advancing Tailings Filter Plant Filter Press Commissioning Tailings Filter Plant commissioning underway with first filter cake produced in late April. Total moisture limit testing has confirmed haulage specifications are met at 16-18% moisture. Once fully operational, the pastefill system will divert a majority of tailings underground, significantly reducing the mine's surface footprint.
Page 29
TSX: KNT OTCQX: KNTNF 29 Pastefill Plant Infrastructure Construction Advancing Surface Binder Blending Plant Near Portal Underground Silo Chamber Underground Binder Plant Structural, mechanical and piping works are well advanced at the Surface Binder Blending and Filter Cake Storage areas, with commissioning targeted for Q3 2026. Underground Paste Plant construction continues to advance rapidly, with Silo Chamber concrete works complete and binder mixers and screw conveyors installed. Remaining civil, structural and mechanical works are progressing as planned, with underground pastefill plant commissioning in Q4 2026.
Page 30
TSX: KNT OTCQX: KNTNF 30 Major Improvement to Mine-Mill Transport Capacity Underway Several roads and river crossings are concurrently being upgraded to improve haulage capacity and operational efficiency. Baupa bridge recently completed. Baupa Bridge - Complete Kokomo Bridge Kasese River Crossing 10m Diameter Culvert Pre-backfill
Page 31
TSX: KNT OTCQX: KNTNF 31 Multiple High Priority Near-Mine Targets Significant Resource Expansion at Highly Prospective Near-Mine Vein Field Established Infrastructure = Rapid Transition from Discovery to Mining Multiple High Priority Near-Mine Vein and Porphyry Targets 1 Kora & Kora Deeps (Vein) • Kora open to depth and along strike 2 Judd & Judd Deeps (Vein) • Subparallel to Kora, high-grade historical & recent intersections • ~150-200m from existing mine infrastructure3 Karempe (Vein) • Artisanal workings, presumed porphyry below high-grade veins • ~400-450m from existing mine infrastructure6 Kora South & Judd South (Vein) • Structure extends +1km beyond mining lease • Outcrop and historical mining, previously undrilled 4 Maniape and Arakompa (Vein) • Arakompa: +2km strike, +800m vertical, +400m wide mineralized corridor • Maniape: +1km strike, +200m vertical = Drilling Underway Airborne Geophysics and Target Locations 8 A1 (Porphyry) • Latest advanced mobile MT geophysics confirms A1 as our #1 porphyry target 7 Mati, Mesoan and Bona Creek (Vein) • Surface geochemical sampling being conducted ahead of drill program 5 Wera (Vein) • Large 3.5km x 3.5km low-sulphidation epithermal vein system • ~10km from Kora and Judd deposits
Page 32
TSX: KNT OTCQX: KNTNF 32 Exploration Target: Kora, Kora South, Kora North & Kora Deeps Multiple Highly Prospective Exploration Fronts Being Drilled Concurrently Kora Deeps, Kora North and South Deeps Underway from Twin Incline and Kora South Underway from 1205 Level Drill Drive Kora Deeps Drilling Has Commenced Targeting to 500m RL over the next 12 months Note: See slide 55 for complete grade information for intersections.
Page 33
TSX: KNT OTCQX: KNTNF 33 Judd and Judd South Vein System is Very Underexplored Judd is Sparsely Drilled, Has at Least 4 Known Veins and Open in All Directions Significant Amount of Drilling Completed Since the Judd Resource and Drill Defined Strike Length has Increased +130% Since End of 2021 Judd Deeps Drilling Has Commenced Targeting to 500m RL over the next 12 months Note: See slide 55 for complete grade information for intersections.
Page 34
TSX: KNT OTCQX: KNTNF 34 Copper Grade Tenor Increasing to the South towards A1 Porphyry K2 Vein Copper Grade (%) Long-Section (Looking West) Copper grades and tenor continue to increase south toward A1 with the K1 Vein returning higher copper grades at depth Kora South/Judd South Drill Drive Well Established for Step-Out Drilling K1 Vein Copper Grade (%) Long-Section (Looking West)
Page 35
TSX: KNT OTCQX: KNTNF 35 High Priority Exploration Targets: Arakompa and Maniape Arakompa and Maniape Veins Key Facts • Arakompa – Sparsely drilled, open along strike, at depth and along its width • Located ~4.5km from Kainantu process plant, with similar mineralization to the producing high-grade Kora and Judd vein systems • The target size is very large, with mineralization demonstrated from drill holes, rock samples and surface workings for at least 2 km of strike, hosted within a +400 m wide mineralized intense phyllic altered package, and exhibits a vertical extent of +800 m • Maiden resource estimate targeting 2H 2026 • Maniape – ~1100m strike & 220m known vertical • 16 holes drilled, including: 49 m at 4 g/t Au (incl. 12.5 m at 8 g/t Au) and 7 m at 22 g/t • Work to date indicates Maniape is similar geologically to Arakompa Note: See slide 56 for complete grade information for intersections.
Page 36
TSX: KNT OTCQX: KNTNF 36 Sizeable Bulk Tonnage Zone Defined & Porphyry-Style Mineralization Discovered Arakompa Target is Very Large: +2km Strike, +800m Vertical and +400m Wide Corridor – Open Along Strike, Depth & Width Latest drilling expanded the near-surface high-grade bulk zone, including 99.0m at 2.90 g/t AuEq and 105.4m at 2.26 g/t AuEq Porphyry vector drilling advanced with outer potassic zone intersected, 2nd rig being mobilized to target the high-grade core Note: See slide 56 for complete grade information for intersections.
Page 37
TSX: KNT OTCQX: KNTNF 37 Two Major High-Grade Veins Confirmed to Date – AR1 and AR2 Drilling at Arakompa has delineated two major sub-parallel veins AR1 and AR2, defined over extensive strike and depth AR1 near-surface high-grade zone outlined in long section spans up to 300m vertically and up to 400m strike, averaging 9.47 g/t AuEq at 4.32m true width Mineralization extends to surface, highlighting high-priority near-surface infill targets, with both veins remaining open in multiple directions with ~3 m average widths Note: See slide 56 for complete grade information for intersections.
Page 38
TSX: KNT OTCQX: KNTNF 38 Arakompa is Growing Very Rapidly Arakompa is rapidly and efficiently growing through expansion of bulk and high-grade vein mineralization, with additional porphyry exploration upside. Feb 2024 June 2024 Oct 2024 Feb 2025 (2 Holes Reported) (11 Holes Reported) (30 Holes Reported) (43 Holes Reported) Sept 2025 (67 Holes Reported) June 2026 (100 Holes Reported)
Page 39
TSX: KNT OTCQX: KNTNF 39 New Greenfields Discovery – Large Vein System at Wera Maiden Greenfields Exploration Program Has Defined a Large 3.5 km by 3.5 km Mineralized System Located 10km southwest from Kora and Judd – Drilling is underway Wera Vein System Key Facts • Wera – low-sulphidation epithermal gold system • Road accessible and located ~10km SW from Kora and Judd • Target identified from airborne geophysics MobileMT Survey and review of historical data • Maiden exploration program (commenced in July 2024), focusing on rock chip and trenching, has defined a large 3.5km by 3.5 km vein system that is open along strike in both directions • High-grade rock chip samples include: • 26.30 g/t Au, 25.06 g/t Au, 23.97 g/t Au, 22.06 g/t Au, 19.69 g/t Au, 19.23 g/t Au, 18.40 g/t Au, 18.40 g/t Au, 18.03 g/t Au, 16.05 g/t Au, and 13.83 g/t Au • Lies within the major NNE regional mineralized structural corridor that hosts Kora, Judd, and Arakompa • Maiden scout drill program is currently underway at Wera
Page 40
TSX: KNT OTCQX: KNTNF 40 Significant Pipeline of Highly Prospective Exploration Targets Large underexplored 836.8km2 land package Prospective for multiple deposit types with many high priority targets $31-35m in Exploration Expenditure Forecasted in 2026. Potential to Increase Exploration Budget to ~$40m after Stage 3 Delivery PROSPECTIVITY Kokofimpa Tankuanan Timpa Headwaters Efontera Yompossa (Yanabo)Kathnell Kapore Yauna Kokomo Kora/Judd Kora South / Judd South Karempe Mati Mesoan Ayena Yarr Tree OmemaBasangka Barapa Moimo Maniape Arakompa A1 Aifunka Wera Karempe Deeps Blue Lake Kora & Judd Deeps Vein Targets Porphyry Targets Skarn Epithermal & Skarn Current Exploration Focus Exploration Planned Within 24 months Operations Feasibility Pre-Feasibility Concept Resource Definition Advanced Target Target Testing Target Definition
Page 41
Appendix
Page 42
TSX: KNT OTCQX: KNTNF 42 Management Team John Lewins CEO & Director Mineral engineer with +35 years of global experience (Africa, Australia, Asia, N. America & former Soviet Union) at project development, operational and corporate level. Former GM of MIM Holdings, MD of Platinum Australia and Executive Director of African Thunder Platinum SA. Became CEO of K92 in Aug 2017; previously COO. David Medilek President & COO Mining professional with +19 years of mining capital markets, corporate strategy and technical operating experience. Former President and VP Business Development & Investor Relations of K92 Mining, Equity Research Analyst at Macquarie Group Limited, Mining Investment Banker at Cormark Securities Inc. and Mining Engineer at Barrick (Western Australia). Mr. Medilek is a licensed Professional Engineer in BC, Canada and CFA® charterholder*. Justin Blanchet CFO Previously CFO of several TSXV-listed mining companies. Mr. Blanchet has 20 yrs of financial reporting, audit, treasury, business development, and regulatory compliance experience in the mining industry and has worked on international projects throughout the world. Mr. Blanchet is a Canadian Chartered Professional Accountant and a U.S. Certified Public Accountant (Washington). Chris Kinver VP Projects & Engineering Mining engineer with 20 years of underground operations and mine development experience in PNG, Australia, South America, Africa and the United Kingdom. Former Project Director Kora Expansion, Mining Manager and Evaluation and Studies Manager at K92. Held roles of Project Manager with OceanaGold, Underground Mine Manager with BHP, Underground Mine Manager with Barrick and Principal Engineer at Wardell Armstrong LLP. Mr. Kinver holds a First Class Western Australian Mine Managers’ Certificate and registrations with the Institute of Engineers Australia, The Engineering Institution of Zambia, and Registered Engineers of Tanzania. Robert Smillie VP Exploration Mr. Smillie is a geologist with over 35 years of experience specializing in epithermal gold and copper-gold systems across the Asia Pacific. While at Ok Tedi Mining, his team discovered the Townsville project, a major copper-gold find and the company’s most significant near-mine discovery in over 30 years. He has led large exploration programs with budgets up to AUD$25 million and worked with OceanaGold, WMC Resources, Calibre Mining, and others. Mr. Smillie holds an MBA from Victoria University, an MSc and BSc in Geology from Otago University, and is a Fellow of SEG and AusIMM. Stanley Komunt VP Community Affairs and External Relations Mr. Komunt has over 25 years of experience in community and government relations in the mining industry. He served as Country Manager for Newcrest and Newmont in PNG, leading negotiations and managing regulatory, stakeholder, and community engagement. He has held senior roles at Nautilus Minerals, Morobe JV, Highlands Pacific, and Ok Tedi Mining. Mr. Komunt is a member of the Australian Institute of Company Directors and serves as VP PNG for the Australia PNG Business Council and Director of PNG MVIL. Philip Samar Senior Advisor, Government & Community Affairs Mr. Samar has spent 20 years through to 2018 working for the Mineral Resources Authority (MRA) of Papua New Guinea, the government body responsible for regulating the exploration and mineral sector. In his last six years as Managing Director, Mr. Samar had a significant leadership role within the country and has regularly interacted with multiple mining industry stakeholders including: government, international organizations, landowners and foreign investors. Management & Directors *CFA® and Chartered Financial Analyst® are registered trademarks owned by CFA Institute. Board of Directors Anne Giardini Chair Over 35 years' experience as a lawyer, senior executive, director, journalist and author. Former General Counsel and President of Weyerhaeuser's Canadian subsidiary. Ms. Giardini currently serves on the boards of Pembina Institute and CMHC and as Chair of the BC Achievement Foundation. Former Chair of the Greater Vancouver Board of Trade and served on numerous boards including Weyerhaeuser, Nevsun Resources, Thompson Creek Metals, HydroOne, and TransLink. Officer of the Order of Canada (2016) and admitted to the Order of British Columbia (2018). John Lewins See Management Team Cyndi Laval Lawyer with +25 yrs of experience specializing in areas of mining law, corporate finance, M&A, corporate governance and securities. Currently a Partner in Gowling WLG's Vancouver office. Ms. Laval was also named one of Vancouver's 30 leading lawyers by the National Post and is recognized as a leading lawyer in multiple publications. Prior to joining private law practice, Ms. Laval worked in the TSXV Exchange's policy department. Mark Eaton Experienced investment professional with +20yrs experience in equity capital markets, focused on the resource sector. Held the role of MD Global Mining Sales at CIBC, Manager of US Equity Sales at CIBC, and former Partner and Director of Loewen Ondaatje McCutcheon Ltd. Mr. Eaton is the current Executive Chairman and former CEO of Belo Sun Mining and has served as director or executive of several mining companies. Saurabh Handa Chartered Professional Accountant with diverse senior experience in finance, mergers and acquisitions and multi-jurisdictional public company disclosures. Currently Principal of Handa Financial Consulting Inc. Former CFO of Titan Mining Corp., VP Finance of Imperial Metals Corp., CFO of Meryllion Resources Corp., CFO of Yellowhead Mining Inc., Controller for SouthGobi Resources Ltd. and Senior Staff Accountant at Deloitte and Touche LLP. Nan Lee Professional Engineer with +30 years of experience as a mining and geo-environmental engineer, project manager, senior executive, and advisor in the mining industry. Ms. Lee's experience in the uranium sector includes 15 years as an independent consultant leading environmental assessments and managing preliminary feasibility studies for tailings management facilities and a greenfield mine development proposal. More recently, Ms. Lee was with UEX Corporation as VP of Project Development. Michael Carew Geologist with 25+ years of corporate, technical and capital markets experience in the mining industry. Worked with BHP Billiton, Mount Isa Mines and Ivanhoe Mines. Former Mining Research Analyst at Haywood Securities Inc. (2013–2020). Currently Director and Audit Committee member of Military Metals Corp. and CEO of Walhalla Gold Corp. Holds a PhD in Economic Geology from James Cook University, Australia.
Page 43
TSX: KNT OTCQX: KNTNF 43 2030 GHG Emissions Reduction Target Kainantu has below industry average emissions and we are committed to improving our energy and GHG emissions profile further K92 has set a target to reduce Scope 1 and Scope 2 emissions by 25% on a business - as - usual basis by 2030 Note: Carbon intensity comparison based on S&P Global Market Intelligence 2020 data on a tCO2 equivalent per ounce of gold produced basis. 40% lower carbon intensity comparedto global average
Page 44
TSX: KNT OTCQX: KNTNF 44 Kora Deposit Overview & Mining Conditions Summary Deposit: Intermediate Sulphidation Multiple sub-vertical Au-Cu-Ag sulphide veins Focus is on the K1 and K2 veins, with the system also hosting other veins and link structures AuEq Reserve Grade: 8.6g/t – 6.6g/t Au, 19g/t Ag, 1.1% Cu (3.5g/t cut-off) with multiple higher-grade zones (+20g/t) Thickness: ~3-5m average range Orientation: Sub-Vertical Continuity: Highly Continuous Size Potential: +1.5km strike (open) by +1km vertical (open) Access: Incline ramp access (deposit at higher elevation than portal), providing significant operational efficiencies (dewatering and materials transport) through leveraging gravity Geotech: Competent – Amenable to long hole on both K1 and K2 Veins Kora has the ‘right ingredients’ for an efficient and productive underground mine
Page 45
TSX: KNT OTCQX: KNTNF 45 Judd Deposit Overview & Mining Conditions Summary Deposit: Intermediate Sulphidation Multiple sub-vertical Au-Cu-Ag sulphide veins, located ~150-200m east of Kora Focus is on the J1 vein, with the system also hosting at least three other veins AuEq Reserve Grade: 8.1g/t – 7.1g/t Au, 14g/t Ag, 0.5% Cu (3.5g/t cut-off) with higher grade zones (+15g/t) Thickness: ~3-5m average range Orientation: Sub-Vertical Continuity: Highly Continuous Size Potential: Open in all directions – high grade underground was discovered recently in Q4 2020 and limited exploration completed to date Access: Leverages Kora’s infrastructure resulting in limited waste development required to access the deposit. Like Kora, deposit is above main infrastructure, providing significant operational efficiencies (dewatering and materials transport) through leveraging gravity Geotech: Competent – Amenable to highly efficient long hole on J1 Solid Performance to Date from Production Stoping at Judd
Page 46
TSX: KNT OTCQX: KNTNF 46 Kora and Judd Independent Reserve Estimate Tonnes Gold Silver Copper Gold Equivalent mt g/t moz g/t moz % kt g/t moz Kora Deposit Proven 2.95 7.4 0.70 19 1.9 1.1 31 9.4 0.89 Probable 2.52 5.7 0.46 19 1.6 1.0 26 7.6 0.61 Proven & Probable 5.47 6.6 1.16 19 3.4 1.1 57 8.6 1.50 Judd Deposit Proven 0.24 8.3 0.06 17 0.1 0.6 1 9.4 0.07 Probable 0.47 6.5 0.10 13 0.2 0.5 2 7.5 0.11 Proven & Probable 0.71 7.1 0.16 14 0.3 0.5 4 8.1 0.18 Consolidated Total Proven 3.19 7.5 0.77 19 2.0 1.0 33 9.4 0.96 Total Probable 2.99 5.8 0.56 18 1.8 1.0 28 7.6 0.73 Total Proven & Probable 6.18 6.7 1.32 19 3.7 1.0 61 8.5 1.69 Kora and Judd Deposit Reserve Summary (January/2024) • The long-term metal prices used for calculating the financial analysis are USD $1,900/oz gold, USD $4.50/lb Copper, USD $25/oz Silver. • Gold Equivalents are calculated as AuEq = Au g/t + Cu % *1.62404 + Ag g/t*0.01316, based on commodity pricing. Metal payabilities and recoveries are not incorporated into this formula. • A minimum mining width of 3.0 m has been applied for stoping, inclusive of a 1.0 m dilution skin at contained Mineral Resource grade. • In addition to the 1.0 m dilution skin, dilution of 5% has been added for Avoca mined stopes and 2.5% for long hole stoping with pastefill. Where a stope is within 5.0 m proximity of the HW or FW of the fault gouge, an additional 1.0m of dilution was added at a grade averaging 1.42 g/t AuEq. This results in a total average dilution of 27.8%. • Mining recoveries of 90% have been applied to Avoca mined stopes, and 95% for long hole stoping with pastefill. • A cut-off grade of 3.5 g/t AuEq was used to define stoping blocks. Stope shapes with uneconomic development were excluded. The cut-off grade takes into account site operating costs, G&A costs, sustaining capital costs and relevant processing and revenue inputs. • Measured Mineral Resources were used to report Proven Mineral Reserves. • Indicated Mineral Resources were used to report Probable Mineral Reserves. No Measured Mineral Resources were used to report Probable Mineral Reserves. • Tonnage and grade estimates include dilution and recovery allowance. • The Mineral Reserves reported are not added to Mineral Resources.
Page 47
TSX: KNT OTCQX: KNTNF 47 Tonnes Gold Silver Copper Gold Equivalent mt g/t moz g/t moz % kt g/t moz Kora Deposit Measured 3.7 8.7 1.0 21 2.5 1.2 45 11.0 1.3 Indicated 3.1 7.0 0.7 22 2.2 1.3 41 9.4 1.0 Measured & Indicated 6.9 7.9 1.8 21 4.7 1.3 86 10.2 2.3 Inferred 14.3 5.6 2.6 29 13.2 1.6 231 8.6 3.9 Judd Deposit Measured 0.4 9.1 0.1 23 0.2 0.8 3 10.6 0.1 Indicated 0.8 6.4 0.2 16 0.4 0.7 6 7.8 0.2 Measured & Indicated 1.2 7.2 0.3 17 0.7 0.8 9 8.7 0.4 Inferred 2.3 6.3 0.5 16 1.1 0.8 17 7.7 0.6 Consolidated Total Measured 4.1 8.8 1.2 20 2.7 1.2 48 10.9 1.5 Total Indicated 4.0 6.9 0.9 21 2.6 1.2 47 9.1 1.2 Total Measured & Indicated 8.1 7.8 2.0 21 5.3 1.2 96 10.0 2.6 Total Inferred 16.5 5.7 3.0 27 14.3 1.5 248 8.5 4.5 Kora and Judd Deposit Resource Summary (September/2023) Kainantu Consolidated NI 43-101 Resources Note: Kora and Judd resource estimates - refer to technical report dated March 21 2025 and titled, “Independent Technical Report, Kainantu Gold Mine, Updated Definitive Feasibility Study, Kainantu Project, Papua New Guinea”.
Page 48
TSX: KNT OTCQX: KNTNF 48 2.6 moz AuEq, 9.1g/t 2.0moz Au, 6.8g/t 120 kt Cu, 1.3% 7 moz Ag, 26g/t 4.5 moz AuEq, 8.5g/t 3.0moz Au, 5.7g/t 248 kt Cu, 1.5% 14.3 moz Ag, 27g/t 2.6 moz 4.5 moz 1Q 2022 4Q 2023 2.3 moz AuEq, 9.3g/t 1.9moz Au, 7.7g/t 69 kt Cu, 0.9% 4.5 moz Ag, 18g/t 2.6 moz AuEq, 10.0g/t 2.0moz Au, 7.8g/t 96 kt Cu, 1.2% 5.3 moz Ag, 20g/t 0.3 moz 9.2 g/t2.3 moz 2.9 moz - 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 1Q 2022 4Q 2023 Production Depletion 2.3 moz AuEq, 9.3g/t 1.9moz Au, 7.7g/t 69 kt Cu, 0.9% 4.5 moz Ag, 18g/t 2.6 moz AuEq, 10.0g/t 2.0moz Au, 7.8g/t 96 kt Cu, 1.2% 5.3 moz Ag, 20g/t 2.6 moz AuEq, 9.1g/t 2.0moz Au, 6.8g/t 120 kt Cu, 1.3% 7 moz Ag, 26g/t 4.5 moz AuEq, 8.5g/t 3.0moz Au, 5.7g/t 248 kt Cu, 1.5% 14.3 moz Ag, 27g/t 0.3 moz 9.2 g/t 4.9 moz 7.4 moz 1Q 2022 4Q 2023 M&I Inferred Production Depletion Efficient and Systematic Exploration – Kora and Judd M&I – Kora and Judd (moz AuEq) K92 Has Successfully Executed on A Systematic Exploration Program Significantly Growing the Resource Base and Ramping Exploration While Keeping Discovery Costs Low at <US$7.5/oz AuEq Inferred – Kora and Judd (moz AuEq) Total – Kora and Judd (moz AuEq) (1) Note (1): Production depletion allocated entirely to M&I category for illustrative purposes. Kora and Judd resource estimates - refer to technical report dated March 21, 2025, with an effective date of January 1, 2024 and titled, “Independent Technical Report, Kainantu Gold Mine, Updated Definitive Feasibility Study, Kainantu Project, Papua New Guinea”
Page 49
TSX: KNT OTCQX: KNTNF 49 Latest Drilling Results Kora-Kora South – K1 Vein (February 18, 2026) Key Facts • All holes intersected mineralization • High-grade zone extended up-dip from main underground mining area with higher grades than resource model in multiple zones, including: • KMDD0893 – 4.95 m at 38.46 g/t AuEq (4.85 m true thickness) • KMDD0904 – 7.40 m at 14.04 g/t AuEq (7.27 m true thickness) • KMDD0894 – 4.16 m at 24.24 g/t AuEq (3.72 m true thickness) • Multiple thick, high-grade intercepts at Kora Deeps up to 350 m below the Twin Incline and 250 m below the 2023 MRE, defining ~400 m of strike to date, with several intersections returning elevated copper grades, including: • KMDD0909 – 8.00 m at 10.16 g/t AuEq (4.37 m true thickness) 5.43 g/t Au, 80 g/t Ag, 3.79% Cu • KMDD0913 – 13.75 m at 5.41 g/t AuEq (7.35 m true thickness) 2.76 g/t Au, 17 g/t Ag, 2.45% Cu • Multiple high-grade copper zone intersected to the south: • KMDD0873 – 7.90 m at 11.26 g/t AuEq (5.29 m true thickness) 2.57 g/t Au, 155 g/t Ag, 6.87% Cu • KMDD0888 – 8.15 m at 28.99 g/t AuEq (1.32 m true thickness) 26.16 g/t Au, 22 g/t Ag, 2.59% Cu • Multiple high-grade intersects along strike to the north: • KMDD0936 – 19.50 m at 34.04 g/t AuEq (5.60 m true thickness) • KMDD0867A – 15.33 m at 9.86 g/t AuEq (13.72 m true thickness) Note: See slide 56 for complete grade information for intersections.
Page 50
TSX: KNT OTCQX: KNTNF 50 Latest Drilling Results Kora-Kora South – K2 Vein (February 18, 2026) Exploration at Kora is significantly ramping up from twin incline at Kora Deeps and 1205 Drill Drive at Kora South Key Facts • All holes intersected mineralization • Dilatant zone now defined 100 m along strike by 200 m vertical extent, located ~50m from existing underground infrastructure — supporting near-term bulk mining potential: • KMDD0915 – 20.50 m at 14.04 g/t AuEq (16.19 m true thickness) • KMDD0914 – 10.70 m at 10.83 g/t AuEq (10.56 m true thickness) • Drilling at Kora-Kora South extended high-grade zones in multiple directions, including up-dip from main underground mining area: • KMDD0977 – 18.19 m at 11.70 g/t AuEq (13.49 m true thickness) • KMDD0882 – 29.30 m at 7.90 g/t AuEq (17.66 m true thickness) • KMDD0904 – 4.35 m at 29.62 g/t AuEq (4.27 m true thickness) • KMDD0906 – 16.90 m at 8.29 g/t AuEq (15.01 m true thickness) • Multiple high-grade intercepts recorded at the K1 Vein, extending mineralization along strike to the north and south: • KMDD0932 – 3.35 m at 37.07 g/t AuEq (2.70 m true thickness) • KMDD0869 – 6.00 m at 5.86 g/t AuEq (3.72 m true thickness) • KMDD0876 – 3.70 m at 14.13 g/t AuEq (1.92 m true thickness) Note: See slide 56 for complete grade information for intersections.
Page 51
TSX: KNT OTCQX: KNTNF 51 Latest Drilling Results Judd-Judd South – J1 Vein (February 18, 2026) Judd, Judd South & Northern Deeps is very underexplored and open in all directions Key Facts • All holes intersected mineralization • Multiple thick, high-grade intercepts at Judd Deeps up to 300 m below the Twin Incline and 350 m below the MRE, defining 450 m of strike to date, remaining open at depth and in both directions, including: • KMDD0896 – 8.50 m at 8.64 g/t AuEq (3.50 m true thickness) • KMDD0944 – 6.80 m at 6.21 g/t AuEq (2.66 m true thickness) • Multiple high-grade intersections recorded continuing to extend high- grade mineralization up-dip from the main mine and to the north: • JDD0306 – 5.45 m at 66.99 g/t AuEq (3.78 m true thickness) • JDD0323 – 16.12 m at 14.38 g/t AuEq (2.76 m true thickness) • JDD0307 – 1.65 m at 185.79 g/t AuEq (1.16 m true thickness) • JDD0320 – 3.90 m at 56.75 g/t AuEq (1.83 m true thickness) • JDD0313 – 2.72 m at 24.55 g/t AuEq (2.24 m true thickness) • Multiple high-grade intercepts at Judd North, a prospective up-dip extension over 800 m strike and 250–500 m vertically; surface drilling planned for H2 2026. Highlights include: • JDD0355 – 20.29 m at 14.06 g/t AuEq (11.99 m true thickness) • JDD0360 – 3.05 m at 15.48 g/t AuEq (2.11 m true thickness) • Since the Dec 31, 2021 maiden resource, drilling has expanded strike by +130%, with Judd, Judd South and Northern Deeps still underexplored and open in all directions. Note: See slide 56 for complete grade information for intersections.
Page 52
TSX: KNT OTCQX: KNTNF 52 Airborne Geophysics Identifies Many New Targets Key Facts • Advanced MobileMT deep penetrating airborne geophysics flown over the entire ~830 km2 land package • First major geophysics program completed on property in +10 years • Results demonstrate an extensive untested potential strike length to Kora-Kora South and Judd-Judd South vein systems beyond the A1 porphyry for several kilometres to the SE. • This is demarcated via a High Conductivity Zone • Results also correlated well with other known mineral deposits and conductive bodies • Multiple new vein and porphyry targets on all licenses have also been identified. Geophysics has outlined the potential to extend Kora-Kora South & Judd-Judd South for kilometres
Page 53
TSX: KNT OTCQX: KNTNF 53 Blue Lake Porphyry Project - Significant Potential to Grow Resource Size 14.6 moz AuEq / 2.9 blbs CuEq Maiden Inferred Resource Declared in August 2022 Grade Tenor Increasing with Depth & High Grade Potassic Core is Open at Depth Note: Estimates are based on Technical Report titled, “Independent Technical Report, Mineral Resource Estimate Blue Lake Porphyry, Kainantu Project, Papua New Guinea”.
Page 54
TSX: KNT OTCQX: KNTNF 54 Blue Lake Porphyry Project – 14.6 moz Maiden Resource (August 2022) Large 14.6 moz AuEq Inferred Resource Nearly every hole hit – Discovery Cost of ~$650/oz AuEq per m or <$1/oz AuEq In - pit resource and higher grade core open at depth In Papua New Guinea, Porphyries Tend to Cluster – Multiple Targets Nearby • Estimates are based on Technical Report titled, “Independent Technical Report, Mineral Resource Estimate Blue Lake Porphyry, Kainantu Project, Papua New Guinea”. • The Independent and Qualified Person responsible for the mineral resource estimate is Simon Tear, P.Geo. of H & S Consultants Pty. Ltd., Sydney, Australia, and the effective date of the Mineral Resource is 1st August, 2022. • Mineral resources are not mineral reserves and do not have demonstrated economic viability. • Resources were compiled at 0.1, 0.2, 0.3, 0.4, 0.5, 0.6 g/t AuEq cut-off grades. • Density was based on 2,473 measured density data recordings (weighed core trays and measured core) which were composited and subsequently modelled unconstrained using Ordinary Kriging. Reported tonnage and grade figures are rounded from raw estimates to reflect the order of accuracy of the estimate. • Minor variations may occur during the addition of rounded numbers. • Estimations used metric units (metres, tonnes and g/t) • Gold equivalents are calculated as AuEq = Au g/t + Cu%*2.0629 + Ag g/t*0.0125. Gold price US$1,600/oz; Silver US$20/oz; Copper US$3.75/lb. Metal recoveries are incorporated in the formula and are Au 67%, Ag 67% and copper 86% respectively. Tonnes Gold Silver Copper Gold Equivalent mt g/t moz g/t moz % mt g/t moz Blue Lake Inferred 686 0.19 4.2 2.4 53.6 0.21 1.4 0.66 14.6 Blue Lake Resource Summary (August 2022)
Page 55
TSX: KNT OTCQX: KNTNF 55 Kora and Judd Highlight Intersections From Presentation Images Drill Hole ID Interval (m) True width (m) Gold g/t Silver g/t Copper % Gold Eq KMDD0867A 15.33 13.72 8.96 19 0.69 9.86 KMDD0869 6.00 3.72 1.62 79 3.31 5.86 KMDD0873 7.90 5.29 2.57 155 6.87 11.26 KMDD0876 3.70 1.92 13.28 13 0.70 14.13 KMDD0880A 17.20 8.86 4.41 18 0.41 5.04 KMDD0881 2.70 1.21 2.74 23 3.49 6.49 KMDD0882 29.30 17.66 5.84 22 1.81 7.90 KMDD0883 4.00 2.45 14.79 16 1.82 16.80 KMDD0883 6.05 3.71 2.27 80 2.56 5.78 KMDD0888 8.15 1.31 26.16 22 2.59 28.99 KMDD0891 3.35 2.37 6.19 14 1.66 8.01 KMDD0892 6.10 4.46 5.09 29 1.97 7.40 KMDD0893 4.95 4.85 37.99 6 0.40 38.46 KMDD0893 2.85 2.80 11.77 38 4.61 16.81 KMDD0894 4.16 3.72 23.04 14 1.03 24.24 KMDD0894 3.70 3.30 7.95 28 2.17 10.44 KMDD0895 5.05 2.56 3.10 35 1.85 5.35 KMDD0896 8.50 3.50 8.02 11 0.49 8.64 KMDD0896 9.10 4.21 2.90 24 2.85 6.03 KMDD0903 1.86 1.43 12.58 5 1.11 13.75 KMDD0903 2.60 1.99 21.64 12 0.67 22.44 KMDD0904 7.40 7.27 13.56 6 0.41 14.04 KMDD0904 4.35 4.27 26.34 23 3.01 29.62 KMDD0905 3.90 3.81 8.58 52 4.59 13.77 KMDD0906 0.67 0.60 15.39 16 3.73 19.29 KMDD0906 16.90 15.01 7.20 5 1.03 8.29 KMDD0907 1.14 1.03 10.57 11 1.15 11.84 KMDD0907 11.92 10.82 4.47 6 1.20 5.74 KMDD0908 6.85 5.71 7.95 12 0.75 8.83 KMDD0909 1.20 0.58 5.05 17 3.12 8.35 KMDD0909 8.00 4.37 5.43 80 3.79 10.16 KMDD0910 0.57 0.44 5.11 1 0.20 5.32 KMDD0910 8.00 6.17 11.47 13 1.58 13.20 KMDD0911 0.27 0.23 38.20 190 0.33 40.81 Drill Hole ID Interval (m) True width (m) Gold g/t Silver g/t Copper % Gold Eq JDD0302 4.82 4.00 6.34 3 0.36 6.74 JDD0303 9.00 6.71 12.43 14 0.23 12.82 JDD0304 17.62 12.67 4.94 4 0.14 5.13 JDD0305 1.60 1.31 26.98 1 0.12 27.11 JDD0306 5.45 3.78 66.08 16 0.73 66.99 JDD0307 1.65 1.16 183.17 79 1.68 185.79 JDD0308 3.37 2.11 5.78 2 0.29 6.09 JDD0313 2.72 2.24 24.34 7 0.13 24.55 JDD0314 3.66 3.44 10.49 37 2.61 13.52 JDD0316 1.90 0.63 0.30 226 5.33 8.32 JDD0320 3.90 1.83 55.74 7 0.93 56.75 JDD0321 1.65 0.99 6.62 5 0.52 7.19 JDD0322 4.33 2.76 14.11 20 0.69 15.03 JDD0323 16.12 10.01 14.22 1 0.15 14.38 JDD0325 2.80 2.20 4.07 27 1.40 5.79 JDD0326 2.70 1.66 2.28 67 2.15 5.22 JDD0327 1.68 1.31 4.44 21 0.35 5.04 JDD0355 20.29 11.99 12.68 32 1.00 14.06 JDD0359 0.40 0.30 2.97 38 2.99 6.40 JDD0360 3.05 2.11 12.77 120 1.28 15.48 KUDD0038 28.70 18.08 2.85 25 0.85 4.53 KUDD0038 14.00 8.82 0.91 35 2.58 5.49 KUDD0053 78.50 11.86 24.94 116 0.38 27.03 KUDD0056 34.00 10.20 5.45 130 0.65 8.14 KUDD0058 51.00 29.58 0.82 48 3.58 7.04 KUDD0033 27.90 19.25 4.65 76 3.03 10.48 KUDD0035 50.05 31.53 1.60 34 2.01 5.25 KMDD0495 30.55 11.80 4.15 78 4.79 12.82 KMDD0752 13.50 13.42 14.93 199 1.00 19.02 KMDD0751 9.50 9.47 2.26 42 2.63 7.00 KMDD0746 14.40 13.50 9.58 54 1.15 12.09 KMDD0709 12.14 9.18 4.73 7 0.72 5.97 KMDD0709 16.10 12.26 11.48 40 2.28 15.63 KMDD0844 12.80 8.33 25.97 58 3.35 31.89 Drill Hole ID Interval (m) True width (m) Gold g/t Silver g/t Copper % Gold Eq KMDD0911 7.02 5.95 4.79 11 1.62 6.54 KMDD0912A 0.30 0.23 1.18 13 3.70 5.02 KMDD0913 13.75 7.35 2.76 17 2.45 5.41 KMDD0914 10.70 10.56 9.97 41 0.36 10.83 KMDD0915 20.50 16.19 13.00 16 0.84 14.04 KMDD0916 1.38 0.90 6.10 3 0.42 6.55 KMDD0932 3.35 2.70 36.00 21 0.83 37.07 KMDD0934 1.30 0.94 10.09 6 1.21 11.36 KMDD0936 19.50 5.60 33.46 26 0.27 34.04 KMDD0944 6.80 2.66 5.28 42 0.43 6.21 KMDD0976 1.53 1.02 1.50 25 3.96 5.74 KMDD0976 5.40 3.60 8.17 11 1.25 9.55 KMDD0977 18.19 13.49 10.40 8 1.21 11.70 KMDD0880A 7.60 3.36 3.61 21 0.36 4.22 KMDD0887 4.80 3.52 2.16 13 2.09 4.39 KMDD0944 12.40 4.85 2.32 18 1.58 4.11 JDD0296 1.68 1.16 5.50 3 0.97 6.51 KMDD0843 10.10 7.49 14.01 82 0.84 16.29 KMDD0843 3.30 2.45 21.58 14 3.21 26.78 KMDD0692 8.90 8.13 3.73 81 2.41 8.60 KMDD0743 14.05 13.10 3.14 56 1.07 5.56 KMDD0712 7.25 6.98 3.05 77 0.98 5.58 EKDD0002 4.70 4.23 4.98 17 0.02 5.22 KODD0055 9.85 7.58 7.37 2 0.13 7.58 JDD0178 6.36 2.21 22.43 19 0.25 23.07 KUDD0023 19.90 14.10 2.69 22 0.58 3.89 KUDD0017 25.00 17.69 18.53 27 0.64 20.89 KUDD0040 22.00 14.30 2.05 21 1.75 5.14 KUDD0040 57.80 37.57 1.16 12 0.89 2.73 KUDD0040 2.40 1.56 344.40 75 0.02 345.36 KUDD0001 66.55 43.26 3.65 9 0.78 5.02 KUDD0032 30.30 16.06 3.49 27 1.43 6.13 KMDD0830 7.17 4.95 37.93 69 0.5 39.5 KMDD0831 11.63 7.42 3.76 6 0.22 4.18
Page 56
TSX: KNT OTCQX: KNTNF 56 Arakompa Highlight Intersections From Presentation Images Hole_ID From (m) To (m) Interval (m) True width (m) Gold g/t Silver g/t Copper % Gold Eq KARDD0002 5.2 225 219.8 112.14 1.45 3 0.07 1.59 KARDD0002 5.2 154.6 149.4 78.35 1.93 3 0.09 2.12 KARDD0002 143.6 150.8 7.2 3.46 24.44 13 0.10 24.76 KARDD0003 89 169.5 80.5 51.52 1.09 3 0.03 1.18 KARDD0003 161 169.5 8.5 5.44 7.23 12 0.06 7.48 KARDD0004 0 46.5 46.5 29.76 0.96 7 0.03 1.1 KARDD0004 215 332 117 74.88 0.89 3 0.04 1 KARDD0004 281.6 292.8 11.2 7.17 5.64 6 0.11 5.89 KARDD0005 207 248 41 26.24 0.96 4 0.07 1.12 KARDD0005 245.3 247 1.7 1.09 9.90 11 0.01 10.06 KARDD0006 0 94.4 94.4 60.42 3.06 3 0.02 3.14 KARDD0006 5 17.6 12.6 8.06 19.79 3 0.02 19.87 KARDD0006 265.9 266.8 0.9 0.58 12.21 12 0.02 12.39 KARDD0008 0 60 60 30 1.06 6 0.03 1.18 KARDD0009 132.9 240 107.1 42.84 1.59 3 0.09 1.76 KARDD0009 210.5 217.2 6.7 2.68 14.19 9 0.03 14.35 KARDD0010 320 386 66 40.26 1.86 4 0.12 2.1 KARDD0010 325.7 331.1 5.4 3.29 4.62 5 0.10 4.83 KARDD0010 344.2 346 1.8 1.1 15.37 21 0.35 16.18 KARDD0010 357.5 384.3 26.8 16.35 2.17 7 0.21 2.59 KARDD0011 98.8 185.4 86.6 46.76 2.03 1 0.05 2.12 KARDD0011 98.8 102.5 3.7 2 40.84 17 0.82 42.35 KARDD0013 0 36.9 36.9 29.52 1.40 3 0.04 1.53 KARDD0013 12.9 20 7.1 5.68 5.47 13 0.04 5.69 KARDD0014 74.2 75.5 1.3 1.17 2.36 50 1.37 5.19 KARDD0014 218 219.4 1.4 1.26 11.06 19 0.13 11.51 KARDD0015 312.5 345.2 32.7 17.66 1.97 4 0.10 2.19 KARDD0015 318.2 322.4 4.2 2.27 6.08 12 0.20 6.55 KARDD0015 340 343.1 3.1 1.67 5.07 2 0.01 5.11 KARDD0016 101.5 121.2 19.7 12.02 0.73 11 0.11 1.06 KARDD0018 66.8 123.8 57 39.33 1.47 5 0.02 1.58 KARDD0018 66.8 70.8 4 2.76 6.15 30 0.04 6.59 KARDD0018 122.5 123.8 1.3 0.9 35.29 17 0.14 35.72 KARDD0019 255.7 272.9 17.2 11.87 0.67 15 0.17 1.12 KARDD0020 116.1 150 33.9 23.39 0.73 22 0.06 1.1 KARDD0020 148.3 151 2.7 1.86 4.28 175 0.09 6.61 KARDD0023 78 110.4 32.4 19.44 0.83 5 0.06 1 KARDD0023 328 347.6 19.6 11.76 0.72 8 0.14 1.04 KARDD0023 78 78.8 2 1.2 12.44 60 0.88 14.6 KARDD0025 191 299.8 100.8 50.4 1.71 3 0.10 1.92 KARDD0025 191 214.6 23.6 11.8 5.89 8 0.35 6.57 KARDD0025 199 211 12 6 10.49 11 0.33 11.16 KARDD0025 199 200.4 1.4 0.7 65.62 64 1.01 68.05 KARDD0025 296.9 299.8 2.9 1.45 11.26 9 0.06 11.47 KARDD0027 0 23.3 23.3 11.65 0.98 2 0.02 1.05 KARDD0028 83 128.9 45.9 32.13 1.72 5 0.06 1.88 KARDD0028 101.2 107.8 6.6 4.62 2.95 3 0.05 3.08 KARDD0028 113 120 7 4.9 5.04 10 0.06 5.26 KARDD0029 240.6 261.2 20.6 8.24 8.90 29 0.38 9.87 KARDD0029 240.6 251.3 10.7 4.28 13.81 25 0.53 14.97 KARDD0030 216.5 328.12 111.62 78.13 1.35 4 0.08 1.53 KARDD0030 46.5 47.9 1.4 0.98 30.77 13 0.04 30.99 KARDD0030 233.1 238.5 5.4 3.78 5.01 15 0.43 5.88 KARDD0030 255.57 261.1 5.53 3.87 3.38 13 0.31 4.04 KARDD0030 326.5 328.12 1.62 1.13 33.38 4 0.05 33.52 KARDD0031 133 136.5 3.5 2.1 3.15 4 0.03 3.25 KARDD0033 295.6 353.3 57.7 34.62 1.28 3 0.08 1.44 KARDD0033 332.6 343.7 11.1 6.66 5.37 8 0.29 5.93 KARDD0033 332.6 335.9 3.3 1.98 10.92 3 0.12 11.15 KARDD0035 58.5 143.8 85.3 59.71 1.00 4 0.08 1.19 KARDD0035 93.2 123.1 29.9 20.93 2.09 7 0.20 2.49 Hole_ID From (m) To (m) Interval (m) True width (m) Gold g/t Silver g/t Copper % Gold Eq KARDD0035 93.2 94.2 1 0.7 1.00 48 2.72 5.85 KARDD0035 112 123.1 11.1 7.77 4.50 10 0.19 4.93 KARDD0035 120 121.7 1.7 1.19 12.55 15 0.19 13.04 KARDD0036 158.3 206 47.7 28.62 0.74 4 0.14 1.02 KARDD0036 345 359.7 14.7 8.82 0.82 11 0.11 1.14 KARDD0036 158.3 165.2 6.9 4.14 2.43 11 0.31 3.05 KARDD0036 203.7 206 2.3 1.38 2.16 18 1.04 4 KARDD0037 96.3 117.2 20.9 12.54 1.08 2 0.04 1.17 KARDD0037 177 233.2 56.2 33.72 0.96 7 0.15 1.28 KARDD0037 110.5 112.1 1.6 0.96 6.44 9 0.07 6.67 KARDD0037 182.5 192.1 9.6 5.76 2.69 11 0.49 3.6 KARDD0037 185.1 187.4 2.3 1.38 7.92 24 1.46 10.49 KARDD0038 304.6 369.6 65 41.6 4.04 3 0.05 4.15 KARDD0038 51.6 53.8 2.2 1.41 6.43 17 0.13 6.86 KARDD0038 311 313.6 2.6 1.66 3.44 20 0.32 4.2 KARDD0038 355.1 369.6 14.5 9.28 17.17 4 0.07 17.33 KARDD0038 355.1 362 6.9 4.42 34.73 7 0.11 34.99 KARDD0038 368.4 369.6 1.2 0.77 6.90 4 0.07 7.06 KARDD0039 416 449.5 33.5 20.1 0.85 5 0.09 1.06 KARDD0039 253.5 255.8 2.3 1.38 7.55 23 0.74 9 KARDD0039 448 449.5 1.5 0.9 13.44 33 0.17 14.16 KARDD0040 87.8 102.5 14.7 11.76 1.18 4 0.08 1.36 KARDD0040 99.5 102.5 3 2.4 4.78 6 0.10 5.03 KARDD0040 161.4 162.6 1.2 0.96 4.47 2 0.03 4.53 KARDD0042 185.9 236.3 50.4 40.32 1.58 6 0.15 1.9 KARDD0042 111.3 112.3 1 0.8 5.14 6 0.03 5.27 KARDD0042 191.4 194 2.6 2.08 9.06 41 1.48 11.91 KARDD0042 232.5 236.3 3.8 3.04 7.65 25 0.15 8.21 KARDD0043 227 267.5 40.5 32.4 1.20 3 0.03 1.28 KARDD0043 230.2 235.3 5.1 4.08 5.38 13 0.07 5.67 KARDD0043 257.8 260.8 3 2.4 2.96 3 0.05 3.08 KARDD0041 407.5 440 32.5 19.5 1.06 43 0.11 1.73 KARDD0041 373 374.6 1.6 0.96 4.77 4 0.05 4.89 KARDD0041 407.5 415.5 8 4.8 3.28 170 0.25 5.65 KARDD0041 407.5 411 3.5 2.1 5.74 385 0.51 10.99 KARDD0041 519.3 521.6 2.3 1.38 1.68 15 1.00 3.42 KARDD0045 462.1 475.4 13.3 9.709 0.84 4 0.10 1.03 KARDD0045 470.5 474.15 3.65 2.6645 2.31 8 0.16 2.65 KARDD0046 329.4 391.6 62.2 49.76 0.87 5 0.10 1.08 KARDD0046 332.8 338.3 5.5 4.4 2.88 5 0.15 3.17 KARDD0046 346 348.6 2.6 2.08 2.56 16 0.59 3.66 KARDD0046 369.5 375.6 6.1 4.88 2.12 3 0.09 2.29 KARDD0047 123.9 185.9 62 42.78 0.19 13 0.02 0.37 KARDD0047 294.2 319.6 25.4 17.526 1.23 8 0.13 1.52 KARDD0047 154.8 155.8 1 0.69 0.09 540 0.25 6.73 KARDD0047 307.6 311.4 3.8 2.622 6.38 44 0.61 7.84 KARDD0048 378 423.42 45.42 32.2482 0.99 1 0.03 1.05 KARDD0048 215.1 216.3 1.2 0.852 11.80 3 0.00 11.84 KARDD0048 234.2 235.1 0.9 0.639 13.65 3 0.01 13.70 KARDD0048 393.7 395.3 1.6 1.136 11.15 2 0.04 11.24 KARDD0048 413 417.8 4.8 3.408 3.11 1 0.06 3.22 KARDD0049 320.6 351.8 31.2 22.152 1.17 3 0.11 1.38 KARDD0049 334 342.5 8.5 6.035 1.13 6 0.23 1.55 KARDD0049 345.1 351.8 6.7 4.757 3.35 2 0.11 3.55 KARDD0049 345.1 346.2 1.1 0.781 14.45 6 0.19 14.80 KARDD0050 612 637.3 25.3 18.975 0.61 5 0.21 1.00 KARDD0050 93.7 98.7 5 3.75 1.17 11 0.11 1.48 KARDD0050 290.1 297.3 7.2 5.4 0.41 14 0.20 0.88 KARDD0050 351.7 358 6.3 4.725 1.26 6 0.05 1.40 KARDD0050 409.1 410.2 1.1 0.825 2.94 1 0.02 2.97 KARDD0050 466 467.4 1.4 1.05 2.69 21 0.21 3.26 Hole_ID From (m) To (m) Interval (m) True width (m) Gold g/t Silver g/t Copper % Gold Eq KARDD0050 530.1 537.4 7.3 5.475 0.98 6 0.14 1.27 KARDD0050 580 586.1 6.1 4.575 1.11 5 0.32 1.68 KARDD0050 622 626.2 4.2 3.15 1.12 9 0.35 1.76 KARDD0050 633 634.4 1.4 1.05 3.11 28 1.06 5.10 KARDD0051 394.3 409.2 14.9 11.175 0.59 5 0.23 1.01 KARDD0051 388.4 389.2 0.8 0.6 0.79 6 0.44 1.55 KARDD0051 395.3 398.1 2.8 2.1 1.48 6 0.52 2.37 KARDD0051 403.2 408 4.8 3.6 0.68 10 0.34 1.33 KARDD0051 501.2 501.7 0.5 0.375 2.39 6 0.01 2.47 KARDD0051 509.7 510.7 1 0.75 2.82 45 0.83 4.65 KARDD0051 524 525.1 1.1 0.825 2.34 29 0.33 3.20 KARDD0052 533 608.4 75.4 45.24 0.58 5 0.25 1.04 KARDD0052 111.1 112.2 1.1 0.66 2.37 22 0.17 2.88 KARDD0052 372 375 3 1.8 0.91 17 0.22 1.45 KARDD0052 542.4 546.3 3.9 2.34 0.74 35 0.20 1.46 KARDD0052 557.7 562 4.3 2.58 0.73 4 0.45 1.47 KARDD0052 590.2 592 1.8 1.08 1.02 5 0.18 1.37 KARDD0052 601.8 608.4 6.6 3.96 2.31 19 0.72 3.66 KARDD0052 606.2 608.4 2.2 1.32 4.71 51 1.81 8.12 KARDD0053 480.4 490 9.2 6.9 0.88 1 0.11 1.06 KARDD0053 130 132.1 2.1 1.575 1.80 35 0.27 2.62 KARDD0053 461.3 466 4.7 3.525 0.97 3 0.08 1.12 KARDD0053 480.8 489 8.2 6.15 0.93 1 0.11 1.12 KARDD0054 310.4 328.4 18 13.5 0.90 2 0.04 1.00 KARDD0054 182.6 184.9 2.3 1.725 0.69 16 0.11 1.04 KARDD0054 317.9 324.3 6.4 4.8 2.21 4 0.10 2.42 KARDD0054 323.1 324.3 1.2 0.9 9.85 8 0.17 10.21 KARDD0055 572.2 592 19.8 13.86 0.88 2 0.08 1.02 KARDD0055 643.4 659.8 16.4 11.48 0.54 4 0.27 1.02 KARDD0055 299 300.3 1.3 0.91 2.15 24 0.38 3.03 KARDD0055 572.2 575.8 3.6 2.52 3.80 3 0.13 4.05 KARDD0055 617.4 618 0.6 0.42 1.39 14 0.90 2.96 KARDD0055 644.4 647.1 2.7 1.89 0.63 3 0.27 1.09 KARDD0055 650.9 656.1 5.2 3.64 1.03 10 0.56 2.02 KARDD0055 658.6 659.8 1.2 0.84 1.15 2 0.14 1.39 KARDD0056 345.5 417.6 72.1 51.912 0.80 10 0.05 1.00 KARDD0056 345.5 346.9 1.4 1.008 1.51 32 0.25 2.27 KARDD0056 353.5 361.2 7.7 5.544 5.25 61 0.04 6.02 KARDD0056 353.5 355 1.5 1.08 22.29 224 0.01 24.90 KARDD0056 375.6 377.7 2.1 1.512 1.54 34 0.19 2.23 KARDD0056 410.2 412.3 2.1 1.512 0.73 7 0.34 1.35 KARDD0056 481.5 485.3 3.8 2.736 0.91 14 0.20 1.38 KARDD0056 528.6 534.6 6 4.32 0.34 24 0.38 1.21 KARDD0057 588.8 711.1 122.3 88.056 0.16 2 0.18 0.46 KARDD0057 127.9 133.1 5.2 3.744 5.06 26 0.14 5.57 KARDD0057 317.2 319 1.8 1.296 1.69 31 0.44 2.74 KARDD0057 493.6 495.3 1.7 1.224 1.13 14 0.28 1.72 KARDD0057 551.2 551.7 0.5 0.36 5.17 38 2.17 9.01 KARDD0057 616.1 617.6 1.5 1.08 0.67 35 0.35 1.62 KARDD0058 427.1 483.8 56.7 40.824 0.39 2 0.08 0.54 KARDD0058 141.5 142.7 1.2 0.864 5.34 29 0.25 6.06 KARDD0058 361.8 363.6 1.8 1.296 0.96 3 0.04 1.06 KARDD0058 427.1 428.7 1.6 1.152 1.09 2 0.20 1.42 KARDD0058 441.2 442.5 1.3 0.936 0.87 1 0.13 1.10 KARDD0058 480.2 483.8 3.6 2.592 1.04 3 0.10 1.22 KARDD0059 476 498.2 22.2 15.984 0.72 5 0.16 1.02 KARDD0059 281.3 283.4 2.1 1.512 0.78 29 0.46 1.83 KARDD0059 353.8 357.2 3.4 2.448 0.93 12 0.02 1.11 KARDD0059 459.5 460.2 0.7 0.504 4.18 39 1.00 6.21 KARDD0059 489.6 493.3 3.7 2.664 3.34 22 0.84 4.92 KARDD0060 608.7 633.6 24.9 16.185 0.45 8 0.30 1.01 Hole_ID From (m) To (m) Interval (m) True width (m) Gold g/t Silver g/t Copper % Gold Eq KARDD0060 462 466.6 4.6 2.99 1.34 10 0.16 1.70 KARDD0060 476.7 478.5 1.8 1.17 1.97 46 0.83 3.80 KARDD0060 501.1 503 1.9 1.235 3.72 21 0.52 4.78 KARDD0060 541.5 543.7 2.2 1.43 0.48 14 0.31 1.14 KARDD0060 614 618.4 4.4 2.86 1.39 24 0.54 2.51 KARDD0061 343 439.1 96.1 76.88 2.48 4 0.07 2.64 KARDD0061 343 345 2 1.6 3.78 3 0.03 3.86 KARDD0061 374.3 375.5 1.2 0.96 0.80 5 1.24 2.80 KARDD0061 414.6 421.66 7.06 5.648 27.48 18 0.15 27.92 KARDD0061 416.5 419.1 2.6 2.08 64.60 42 0.27 65.50 KARDD0061 431.1 431.5 0.4 0.32 14.90 5 0.02 14.99 KARDD0061 437.2 438.1 0.9 0.72 13.01 48 1.36 15.70 KARDD0062 334.6 367.4 11.9 9.52 0.69 7 0.15 1.00 KARDD0062 334.6 337.8 3.2 2.56 1.25 17 0.08 1.57 KARDD0062 341.7 346.5 4.8 3.84 0.76 5 0.28 1.25 KARDD0062 362.2 367.4 5.2 4.16 0.79 11 0.28 1.35 KARDD0062 493.7 495.6 1.9 1.52 0.74 11 0.03 0.92 KARDD0063 503.8 514.5 10.7 7.49 0.97 4 0.11 1.20 KARDD0063 291 292.1 1.1 0.77 5.84 10 0.11 6.12 KARDD0063 471.6 473 1.4 0.98 2.83 7 0.11 3.09 KARDD0063 476.4 476.9 0.5 0.35 8.25 16 0.15 8.68 KARDD0063 510.5 514.5 4 2.8 2.12 5 0.16 2.44 KARDD0064 387.7 414 26.3 19.988 0.62 6 0.17 0.96 KARDD0064 355.6 356.9 1.3 0.988 2.16 18 0.32 2.86 KARDD0064 387.7 390 2.3 1.748 4.49 18 0.57 5.59 KARDD0064 408.3 410 1.7 1.292 0.76 13 0.27 1.33 KARDD0065 297 987.4 690.4 641.2 0.17 2 0.17 0.30% CuEq KARDD0065 349.7 745 395.3 363.3 0.24 2 0.20 0.38% CuEq KARDD0065 429.8 479 49.2 37.392 0.82 4 0.18 1.15 KARDD0065 429.8 435.9 6.1 4.64 3.33 21 0.36 4.14 KARDD0065 446.1 452.8 6.7 5.09 1.31 2 0.16 1.59 KARDD0065 476.7 479 2.3 1.75 2.96 8 1.05 4.70 KARDD0066 435.8 484.6 48.8 37.088 0.26 3 0.02 0.32 KARDD0066 221.6 223.2 1.6 1.216 0.79 6 0.06 0.96 KARDD0066 379.6 381.4 1.8 1.368 0.73 8 0.16 1.07 KARDD0066 405.2 406.8 1.6 1.216 0.46 8 0.01 0.56 KARDD0066 443 445 2 1.52 2.09 2 0.01 2.13 KARDD0066 473.5 475.2 1.7 1.292 1.05 7 0.01 1.15 KARDD0066 479.3 480.5 1.2 0.912 0.68 13 0.08 0.96 KARDD0067 554.9 603.2 48.3 36.708 0.80 5 0.30 1.34 KARDD0067 272.4 274.3 1.9 1.444 0.49 9 0.20 0.89 KARDD0067 557.4 575 17.6 13.376 1.64 9 0.50 2.53 KARDD0067 561.3 563 1.7 1.292 5.49 17 0.32 6.18 KARDD0067 584.3 585.6 1.3 0.988 1.49 16 0.64 2.67 KARDD0067 601.9 603.2 1.3 0.988 1.09 24 1.41 3.57 001AD92 11.2 48 36.8 25.55 2.31 2 0.03 2.38 002AD92 4 74 70 49 0.44 3 0.03 0.52 003AD92 36 98 62 43.4 0.66 2 0.02 0.72 004AD92 0 55.5 55.5 38.85 2.43 3 0.07 2.57 005AD92 18 59.9 41.9 29.33 2.12 2 0.04 2.20 006AD92 49 85 36 25.2 1.21 27 0.05 1.60 007AD92 9 34.75 25.75 18.025 0.46 1 0.01 0.50 008AD92 10.9 51 40.1 28.07 1.04 2 0.03 1.11 009AD92 7 26 19 13.3 3.05 5 0.05 3.18 010AD92 0 38 38 26.6 2.66 3 0.08 2.83 011AD92 0 48 48 33.6 1.11 3 0.02 1.18 012AD92 0 64.65 64.65 45.255 0.83 3 0.04 0.93 013AD92 7 31 24 16.8 3.53 3 0.06 3.65 014AD92 9 45 36 25.2 2.61 7 0.04 2.76 015AD92 23 43 20 14 0.60 5 0.05 0.73 016AD92 54 91.2 37.2 26.04 3.00 9 0.29 3.56 017AD92 12 42 30 21 0.18 1 0.01 0.21 018AD92 161 247 86 60.2 0.45 3 0.04 0.55 KARDD0068 211.6 212.6 1 0.7 4.90 17 0.05 5.16 KARDD0068 414.2 414.8 0.6 0.42 2.32 9 0.21 2.64 KARDD0068 448 449.3 1.3 0.91 3.52 2 0.06 3.60 KARDD0068 457.9 458.7 0.8 0.56 11.73 39 1.70 13.88 KARDD0069 467 483 16 12.16 1.00 3 0.03 1.07 KARDD0069 218.7 220.2 1.5 1.14 3.30 1 0.02 3.33 KARDD0069 366.8 368.2 1.4 1.064 1.23 5 0.02 1.31 KARDD0069 391 392 1 0.76 1.21 8 0.02 1.32 KARDD0069 467 470.1 3.1 2.356 4.75 12 0.09 4.99 KARDD0070 455.5 466 10.5 8.4 1.00 1 0.12 1.13 KARDD0070 455.5 457.8 2.3 1.84 3.27 2 0.31 3.60 KARDD0070 487.6 490.4 2.8 2.24 0.94 2 0.11 1.07 KARDD0070 527 529 2 1.6 1.64 1 0.03 1.68 KARDD0071 470 481.6 11.6 9.28 0.47 16 0.34 1.00 KARDD0071 389.3 390.9 1.6 1.28 0.90 11 0.07 1.10 KARDD0071 470.9 475.5 4.6 3.68 0.87 39 0.79 2.13 KARDD0072 492.8 515.8 23 15.87 0.80 6 0.16 1.04 KARDD0072 382.6 383.9 1.3 0.897 1.13 5 0.03 1.22 KARDD0072 435.8 438.6 2.8 1.932 2.58 40 0.15 3.21 KARDD0072 477.6 479.9 2.3 1.587 1.41 5 0.20 1.67 KARDD0072 507.3 510.9 3.6 2.484 1.91 6 0.08 2.06 KARDD0072 514.2 515.8 1.6 1.104 3.51 26 1.12 4.94 KARDD0073 247 303 56 39.2 0.86 8 0.06 1.02 Hole_ID From (m) To (m) Interval (m) True width (m) Gold g/t Silver g/t Copper % Gold Eq KARDD0073 247 255 8 5.6 5.78 46 0.39 6.72 KARDD0073 377.4 380 2.6 1.82 1.93 14 0.15 2.25 KARDD0074 358 477.8 119.8 91.048 0.14 2 0.16 0.32 KARDD0074 481.6 852 370.4 370.4 0.15 2 0.17 0.34 KARDD0074 358 852 494 464.336 0.15 2 0.17 0.34 KARDD0075 442.2 519.4 77.2 54.04 0.85 5 0.11 1.01 KARDD0075 377.3 378.4 1.1 0.77 2.05 2 0.03 2.11 KARDD0075 471.3 476.3 5 3.5 2.29 4 0.25 2.59 KARDD0075 493 503.2 10.2 7.14 3.47 2 0.08 3.57 KARDD0075 508.2 519.4 11.2 7.84 0.50 20 0.30 1.05 KARDD0076 90.7 189.7 99 68.31 2.76 4 0.09 2.90 KARDD0076 90.7 93.3 2.6 1.794 1.73 4 0.02 1.79 KARDD0076 95.8 100.5 4.7 3.243 6.75 8 0.07 6.92 KARDD0076 120 124 4 2.76 3.33 10 0.32 3.76 KARDD0076 134.4 138 3.6 2.484 6.37 12 0.15 6.67 KARDD0076 144.6 156.5 11.9 8.211 14.00 9 0.18 14.30 including 145.3 147 1.7 1.173 91.55 44 0.35 92.43 KARDD0076 166.1 174 7.9 5.451 2.06 8 0.20 2.35 KARDD0077 289 439.3 150.3 150.3 0.14 1 0.18 0.33 KARDD0077 523.6 636.2 112.6 84.45 0.19 3 0.18 0.40 KARDD0077 741 1440.2 699.2 699.2 0.10 2 0.16 0.28 KARDD0077 289 1440.2 1151.2 1102.57 0.11 2 0.16 0.29 KARDD0077 481.6 482.3 0.7 0.525 0.44 5 0.63 1.12 KARDD0077 552.8 554 1.2 0.9 0.44 2 0.50 0.96 KARDD0077 628.5 633.5 5 3.75 0.97 33 0.38 1.74 KARDD0078 119.7 156.1 36.4 25.48 0.83 3 0.13 1.00 KARDD0078 175.1 246 70.9 49.63 0.89 4 0.07 1.01 KARDD0078 203.9 209 5.1 3.57 6.56 16 0.07 6.81 KARDD0078 232.1 238.9 6.8 4.76 2.08 20 0.46 2.78 KARDD0079 386 408 22 15.4 0.32 3 0.03 0.38 KARDD0079 217 218.2 1.2 0.84 0.82 47 0.02 1.41 KARDD0079 255 256 1 0.7 0.77 2 0.02 0.81 KARDD0080 475.4 501.9 26.5 18.55 0.72 5 0.22 1.00 KARDD0080 585.5 791 205.5 205.5 0.15 1 0.17 0.34 KARDD0080 380.5 382 1.5 1.05 1.96 10 0.23 2.30 KARDD0080 426.25 428 1.75 1.225 1.45 1 0.13 1.59 KARDD0080 482.9 484.2 1.3 0.91 9.24 51 2.02 11.86 KARDD0080 499.34 499.9 0.56 0.392 7.03 49 1.98 9.59 KARDD0080 552.2 553.8 1.6 1.12 0.38 1 0.48 0.87 KARDD0081 125 148.2 23.2 16.24 1.36 3 0.05 1.44 KARDD0082 472 498.6 26.6 18.62 0.73 5 0.22 1.01 KARDD0082 173.3 180.8 7.5 5.25 0.96 3 0.04 1.03 KARDD0082 308.6 309.8 1.2 0.84 2.13 39 1.24 3.83 KARDD0082 396.9 398.1 1.2 0.84 1.49 7 0.08 1.65 KARDD0082 431 433.4 2.4 1.68 2.81 8 0.34 3.25 KARDD0082 491 492.4 1.4 0.98 9.77 57 2.30 12.74 KARDD0082 552 554 2 1.4 0.51 9 0.31 0.92 KARDD0083 209.9 222.9 13 10.4 0.81 3 0.15 1.00 KARDD0083 282 308 26 20.8 1.00 6 0.02 1.08 KARDD0083 177.6 178.2 0.6 0.48 0.93 4 0.16 1.14 KARDD0083 214.8 217.8 3 2.4 2.78 10 0.56 3.46 KARDD0083 304.9 308 3.1 2.48 6.89 36 0.04 7.35 KARDD0084G 258.6 364 105.4 55.728 2.17 2 0.06 2.26 KARDD0084G 7.9 9.4 1.5 0.81 5.02 1 0.03 5.06 KARDD0084G 141 142.1 1.1 0.594 2.46 16 0.19 2.84 KARDD0084G 258.6 260 1.4 0.756 0.96 1 0.07 1.05 KARDD0084G 263.6 268.3 4.7 2.538 41.46 4 0.38 41.90 including 265.4 266.4 1 0.54 163.44 15 1.19 164.80 KARDD0084G 315.3 317 1.7 0.918 1.28 9 0.16 1.54 KARDD0084G 342.2 343.5 1.3 0.702 5.01 21 0.08 5.34 KARDD0084G 358.6 364 5.4 2.916 0.84 10 0.18 1.14 KARDD0086 412 455.8 43.8 35.478 0.88 3 0.10 1.01 KARDD0086 347.3 351 3.7 2.997 1.76 2 0.00 1.79 KARDD0086 425 431.7 6.7 5.427 1.06 2 0.13 1.21 KARDD0086 445.5 447.5 2 1.62 7.48 8 0.24 7.82 KARDD0086 449.4 452.6 3.2 2.592 2.84 11 0.34 3.30 KARDD0087 281.6 421.4 139.8 102.054 0.13 2 0.02 0.17 KARDD0087 122 123 1 0.73 0.52 19 0.14 0.88 KARDD0087 281.6 282.7 1.1 0.803 0.77 28 0.01 1.11 KARDD0087 319.9 320.3 0.4 0.292 1.18 10 0.07 1.37 KARDD0087 418.9 421.4 2.5 1.825 2.10 27 0.22 2.64 KARDD0087 457.5 458.5 1 0.73 1.41 5 0.74 2.21 KARDD0088 250.7 350.2 99.5 52.735 0.28 3 0.05 0.36 KARDD0088 4 9.9 5.9 3.127 2.52 3 0.03 2.58 Hole_ID From (m) To (m) Interval (m) True width (m) Gold g/t Silver g/t Copper % Gold Eq KARDD0088 21 23 2 1.06 3.04 1 0.01 3.06 KARDD0088 262 263.9 1.9 1.007 3.18 2 0.05 3.25 KARDD0088 340.4 344.4 4 2.12 0.94 17 0.18 1.32 KARDD0088 349 350.2 1.2 0.636 1.74 3 0.14 1.93 KARDD0089 345 364 19 15.77 0.91 5 0.05 1.02 KARDD0089 233.4 235.7 2.3 1.909 0.96 15 0.28 1.41 KARDD0089 240.9 242.3 1.4 1.162 0.86 3 0.19 1.09 KARDD0089 352.4 364 11.6 9.628 1.38 7 0.07 1.54 including 352.4 353.9 1.5 1.245 4.45 8 0.02 4.56 KARDD0090 109.5 216 106.5 82.005 2.11 3 0.07 2.22 KARDD0090 8.4 10.4 2 1.54 12.88 1 0.02 12.92 KARDD0090 111.8 115 3.2 2.464 9.22 5 0.08 9.37 KARDD0090 123 128 5 3.85 5.35 3 0.03 5.41 KARDD0090 153 156.4 3.4 2.618 20.21 5 0.03 20.31 including 153.7 154.6 0.9 0.693 71.40 16 0.04 71.63 KARDD0090 162.5 165.9 3.4 2.618 1.51 6 0.03 1.62 KARDD0090 172.7 175.9 3.2 2.464 3.62 24 0.51 4.42 KARDD0090 203.4 212 8.6 6.622 6.40 8 0.29 6.79 KARDD0090 214.3 216 1.7 1.309 1.41 2 0.03 1.46 KARDD0091 104.8 154.1 49.3 32.538 1.79 7 0.08 1.95 KARDD0091 60.6 61.5 0.9 0.594 1.54 25 0.31 2.15 KARDD0091 63.6 65.9 2.3 1.518 4.68 7 0.12 4.89 KARDD0091 104.8 108.6 3.8 2.508 5.23 26 0.10 5.65 KARDD0091 112 116 4 2.64 13.21 26 0.38 13.90 including 112 113.8 1.8 1.188 28.84 57 0.83 30.35 KARDD0091 152.7 154.1 1.4 0.924 6.12 55 0.73 7.51 KARDD0093G 261.7 1062.4 800.7 800.7 0.14 1 0.17 0.33 KARDD0093G 753 1062.4 309.4 309.4 0.19 2 0.19 0.40 KARDD0094 160.4 297.75 137.35 101.639 0.95 3 0.08 1.07 KARDD0094 187.5 193.2 5.7 4.218 1.57 1 0.02 1.61 KARDD0094 199 203.02 4.02 2.9748 1.99 2 0.02 2.03 KARDD0094 213 217.1 4.1 3.034 2.55 2 0.04 2.60 KARDD0094 232 237 5 3.7 2.20 3 0.15 2.39 KARDD0094 238.92 246.8 7.88 5.8312 5.60 22 0.77 6.63 including 239.25 241.4 2.15 1.591 12.92 17 0.41 13.54 KARDD0094 269 274 5 3.7 2.29 4 0.13 2.47 KARDD0094 276 280.53 4.53 3.3522 0.88 10 0.11 1.11 KARDD0095 68 100.3 32.3 20.349 0.36 2 0.03 0.41 KARDD0095 78.2 79.4 1.2 0.756 3.35 17 0.26 3.82 KARDD0095 95.9 98 2.1 1.323 1.38 3 0.03 1.45 KARDD0096 103 224 121 60.5 0.49 3 0.05 0.57 KARDD0096 103 130 27 13.5 0.82 3 0.03 0.89 KARDD0096 158 173.5 15.5 7.75 0.60 5 0.07 0.72 KARDD0096 211.6 224 12.4 6.2 0.78 1 0.02 0.82 KARDD0099 207.5 248 40.5 26.73 0.98 2 0.02 1.03 KARDD0099 207.5 210 2.5 1.65 13.22 6 0.03 13.33 KARDD0099 232.7 233 0.3 0.198 3.64 46 0.10 4.29 KARDD0099 288 289 1 0.66 0.97 3 0.11 1.11 KARDD0099 297.4 303.2 5.8 3.828 0.71 4 0.16 0.91 KARDD0099 315.8 319.7 3.9 2.574 0.88 2 0.14 1.05 KARDD0100 121.45 299 177.55 88.775 0.90 2 0.08 1.01 KARDD0100 125.7 128.6 2.9 1.45 4.60 11 0.43 5.17 KARDD0100 139 144 5 2.5 1.05 9 0.38 1.54 KARDD0100 146 162.5 16.5 8.25 7.53 8 0.43 8.06 including 155.7 158.7 3 1.5 17.23 14 0.63 18.03 KARDD0100 373.7 376 2.3 1.15 1.07 2 0.18 1.27 KARDD0101 275.8 351 75.2 56.4 0.15 3 0.02 0.20 KARDD0101 286.2 289.4 3.2 2.4 1.72 9 0.10 1.93 KARDD0101 302.2 303 0.8 0.6 3.03 40 0.21 3.72 KARDD0101 325 330.78 5.78 4.335 0.25 1 0.05 0.32 KARDD0101 423.5 424.5 1 0.75 0.56 8 0.37 1.03 KARDD0104 120 283.5 163.5 114.45 0.97 2 0.03 1.02 KARDD0104 120.8 123 2.2 1.54 6.89 2 0.02 6.92 KARDD0104 137 139 2 1.4 1.88 1 0.01 1.90 KARDD0104 179 185.8 6.8 4.76 15.11 6 0.04 15.21 including 179 181 2 1.4 48.79 14 0.04 49.00 KARDD0104 261 263 2 1.4 0.78 2 0.13 0.93 KARDD0104 271.6 274.1 2.5 1.75 0.85 5 0.11 1.02 KARDD0104 301 302.2 1.2 0.84 18.66 53 0.53 19.82 KARDD0105 58.4 91.6 33.2 22.244 0.80 7 0.16 1.04 KARDD0105 68.9 78.8 9.9 6.633 1.13 2 0.12 1.27 KARDD0105 85 88.6 3.6 2.412 3.45 56 0.91 5.02 KARDD0106 24 164.1 140.1 84.06 1.21 2 0.03 1.27 KARDD0106 24 25.1 1.1 0.66 0.27 46 0.14 0.97 KARDD0106 92.3 96 3.7 2.22 1.49 8 0.13 1.71 KARDD0106 102 112 10 6 15.11 4 0.06 15.21 including 102 106 4 2.4 36.50 6 0.09 36.65 KARDD0106 138 140 2 1.2 0.88 1 0.03 0.92
Page 57
John Lewins CEO & Director Contact: David Medilek, P.Eng., CFA President & COO E - m a i l : d m e d i l e k @ k 9 2 m i n i n g . c o m P h o n e : + 1 ( 6 0 4 ) 4 1 6 4 4 4 5