All amounts expressed in U.S. dollars unless otherwise stated Q3 2026 Results Conference Call November 5, 2026 TSX: TXR OTCQX: TORXF
Page 2
1 Safe Harbor Statement NON-GAAP FINANCIAL MEASURES ARE FINANCIAL MEASURES WITH NO STANDARD MEANING UNDER INTERNATIONAL FINANCIAL REPORTING STANDARDS (“IFRS”) AS ISSUED BY THE INTERNATIONAL ACCOUNTING STANDARDS BOARD AND MIGHT NOT BE COMPARABLE TO SIMILAR FINANCIAL MEASURES DISCLOSED BY OTHER COMPANIES. THIS PRESENTATION INCLUDES, WITHOUT LIMITATION, THE FOLLOWING NON- GAAP FINANCIAL MEASURES (WITH THE RESPECTIVE COMPARABLE FINANCIAL MEASURE SET OUT IN SQUARE BRACKETS): ALL-IN SUSTAINING COSTS PER OUNCE SOLD (“AISC”) [PRODUCTION COSTS AND ROYALTIES]; SUSTAINING AND NON-SUSTAINING CAPITAL EXPENDITURES [ADDITIONS TO PROPERTY, PLANT AND EQUIPMENT], AISC MARGIN [REVENUE], FREE CASH FLOW [NET CASH GENERATED FROM OPERATING ACTIVITIES], NET (DEBT) CASH [CASH AND CASH EQUIVALENTS], AVAILABLE LIQUIDITY [CASH AND CASH EQUIVALENTS], AND ADJUSTED EARNINGS BEFORE INTEREST, TAXES, DEPRECIATION AND AMORTIZATION (“EBITDA”) [NET INCOME]. NON-GAAP MEASURES SHOULD NOT BE CONSIDERED IN ISOLATION OR AS A SUBSTITUTE FOR MEASURES PREPARED UNDER IFRS. FOR ADDITIONAL INFORMATION ON THESE NON-GAAP MEASURES, INCLUDING WITHOUT LIMITATION, COMPOSITION, THE USE OF SUCH NON-GAAP FINANCIAL MEASURES BY INVESTORS AND MANAGEMENT, A DETAILED RECONCILIATION OF EACH OF THESE NON-GAAP FINANCIAL MEASURES TO THE MOST DIRECTLY COMPARABLE FINANCIAL MEASURES UNDER IFRS, AND AN EXPLANATION OF CHANGES, IF ANY, PLEASE REFER TO THE “NON-GAAP FINANCIAL PERFORMANCE MEASURES” SECTION (THE “NGFPM SECTION”) IN THE COMPANY’S MANAGEMENT’S DISCUSSION AND ANALYSIS (THE “MD&A”) FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2026, DATED NOVEMBER 4, 2026, WHICH IS FILED ON SEDAR+ AT WWW.SEDARPLUS.CA AND POSTED ON THE COMPANY’S WEBSITE AT WWW.TOREX.COM. THE NGFPM SECTION IS INCORPORATED BY REFERENCE INTO THIS PRESENTATION. This presentation contains information and extracts from the technical report titled “ELG Mine Complex Life of Mine Plan and Media Luna Feasibility Study” with an effective date of March 16, 2022, and a filing date of March 31, 2022 (the “Morelos Technical Report”), and the technical report titled “Los Reyes Project: NI 43-101 Technical Report and Preliminary Economic Assessment, Sinaloa and Durango, Mexico“ with an effective date of April 25, 2026, and a filing date of July 7, 2026 (the “PEA” and, collectively with the Morelos Technical Report, the "Technical Reports"). The PEA is preliminary in nature, includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied that would enable them to be categorized as mineral reserves, and there is no certainty the PEA results will be realized. The Technical Reports have been filed on SEDAR+ (www.sedarplus.ca) and posted on the Company’s website at www.torex.com. Readers are encouraged to read the Technical Reports in their entirety, including all qualifications, assumptions and exclusions that relate to the mineral resources and mineral reserves. The Technical Reports are intended to be read as a whole, and sections should not be read or relied upon out of context. This presentation contains “forward-looking information” and “forward-looking statements” (collectively, “forward-looking information”) within the meaning of applicable Canadian securities legislation. Forward-looking information includes, without limitation, information with respect to the Company’s 2026 gold-equivalent production, AISC and capital expenditure guidance, including expectations regarding performance relative to that guidance; anticipated timing for Media Luna North production and first ore; the potential to upgrade Morelos mill capacity to approximately 14,500 tonnes per day; expected mine life, mining capacity and capital expenditure for Media Luna North; anticipated timing for field investigations, engineering activities and completion of a prefeasibility study for Los Reyes; free cash flow and capital expenditure forecasts; forecasted share buybacks; maintaining a minimum cash balance of $200 million; targeting $350 million of shareholder returns in 2026 through share buybacks and quarterly dividends; expected timing and amount of dividend payments and share repurchases under the Company’s normal course issuer bid; forecasted timing, expenditures and drilling metres, as applicable, for exploration at Morelos, including ELG Underground, Media Luna, Media Luna North, Media Luna West and the San Miguel Corridor, and at Los Reyes; development plans and expenditures for Media Luna North and Los Reyes; resource and exploration upside; potential to grow mineral reserves and mineral resources; and the timing and completion of the Company’s planned listing on the New York Stock Exchange, satisfaction of applicable exchange approvals and listing conditions, and the anticipated benefit of providing broader investor access. Generally, forward-looking information can be identified by the use of terminology such as “profile”, “plans”, “expect”, “outlook”, “estimate”, “long term”, “opportunity”, “potential”, “ability”, “beyond”, “goal”, “ongoing”, “focus”, “out to” and “target” or variations of such words, or statements that certain actions, events or results “can”, “may”, “would”, “will” occur or “will be” or “to be” taken or achieved. Any financial outlook or future-oriented financial information contained in this presentation, including production and cost guidance, , liquidity expectations, and return of capital targets, has been included to assist readers in understanding management’s current expectations regarding the Company’s financial and operating performance and plans for the periods indicated and may not be appropriate for other purposes. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information, including, without limitation, risks and uncertainties identified in the Technical Reports, the Company’s most recently filed annual information form (“AIF”) and MD&A, each of which is filed on SEDAR+ (www.sedarplus.ca) and posted to the Company’s website at www.torex.com. The material assumptions underlying the forward-looking information include forecast metal prices and foreign-exchange rates; expected ore grades, recoveries, mine sequencing, mining and processing rates; timely access to planned stopes; availability of labour, equipment and contractors; receipt and maintenance of required permits and community agreements; anticipated capital costs and project schedules; continued access to liquidity; and no material operational, security, regulatory or supply-chain disruptions. Material risks include variations in grades, recoveries and commodity prices; foreign-exchange movements; cost inflation; construction and commissioning delays; permitting, political, security and community risks in Mexico; availability of personnel and equipment; geological uncertainty; and the risks described in the Company’s latest AIF, MD&A and Technical Reports. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information, there may be other factors that cause results not to be as anticipated. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, whether as a result of new information or future events or otherwise, except as may be required by applicable securities laws. The scientific and technical information contained in this presentation has been reviewed and approved by Dave Stefanuto, P. Eng, Executive Vice President, Technical Services and Capital Projects of Torex, who is a “Qualified Person” as defined under National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”). Torex and the Bull/Moon logo are registered trademarks of the Company.
Page 3
2 Today’s Speakers Andrew Snowden President & CEO Dan Rollins CFO Shaun Silveira SVP, Corp. Dev. & IR
Page 4
Key Highlights & Operational Performance ANDREW SNOWDEN | President & CEO
Page 5
4 Key Highlights Production increased 37% and AISC1 declined 27% quarter-over-quarter • 132 koz AuEq2 produced, supported by higher grades and improved gold recoveries o 99 koz Au, 614 koz Ag, and 16 mlb Cu • AISC of $1,803/oz AuEq sold generating solid margin2 of 58% • $555M of revenue, supporting $344M adjusted EBITDA1 • $150M free cash flow1, supporting $95M in shareholder returns • $563M available liquidity1 including $226M of cash with credit facility undrawn • Six consecutive quarters without a lost-time injury, exceeding 21 million hours since last LTI Refer to endnotes 1 and 2.
Page 6
5 2026 Guidance Tracking to the midpoint of production guidance and within AISC guidance range Gold equivalent production 329 koz AuEq (Q3 YTD 2026) All-in-sustaining cost $2,025/oz AuEq (Q3 YTD 2026) • 27% lower quarter-over-quarter 2026 Guidance Q3 2026 Q3 YTD 2026 Sustaining 135 to 145 38 107 Non-sustaining 165 to 175 41 97 Total capital expenditures 300 to 320 79 203 Capital expenditures (M$)1 • Q3YTD 2026 represents ~74% of guidance midpoint 329 445 420 470 Q3 2026:$1,803 YTD 2026: $2,025 $2,000 $2,100 annual production guidance annual AISC guidance 1. Excludes working capital and other
Page 7
6 Morelos Operational Performance – Mining Media Luna and ELG Underground consistently exceeding design capacity ELG Underground sustains mining above 3,000 tpdMedia Luna mining rate 10% above design • Mining rates averaged 8,244 tpd, up 7% quarter- over-quarter and above 7,500 tpd design rate • Gold equivalent grades1 increased to 4.4 gpt from 3.4 gpt as planned mine sequencing accessed higher-grade stopes • Mining rates averaged 3,055 tpd, broadly consistent with Q2 and above 2,800 tpd target • Gold equivalent grades1 increased to 5.0 gpt from 4.6 gpt 1. Refer to endnote 2
Page 8
7 Morelos Operational Performance – Processing Stable throughput and improved gold recoveries support stronger production Gold recovery improves to 88.2%Plant throughput remains above design • Throughput averaged 10,798 tpd, consistent with Q2 and above 10,600 tpd design rate • Processed gold equivalent grades1 increased to 4.6 gpt from 3.5 gpt, supporting higher production • Gold recovery increased 3%, reflecting transition to higher-grade, higher gold-recovery areas at Media Luna • Copper recovery remained strong at 94.8%, consistent quarter-over-quarter 11,304 10,705 10,492 10,793 10,798 Q3/25 Q4/25 Q1/26 Q2/26 Q3/26 Ore Processed (tpd) 10,600 tpd design Gold Silver Copper 1. Refer to endnote 2
Page 9
8 Project Updates Media Luna North and Los Reyes tracking to plan Media Luna North — first ore targeted for late 2026 Los Reyes — drilling and fieldwork support the PFS • Underground development and supporting infrastructure continue to advance • Ventilation, paste distribution and electrical infrastructure construction progressed during Q3 • Initial production equipment deliveries and workforce hiring and training are underway • $20M invested in Q3, bringing year-to-date project expenditures to $47M • Prefeasibility work commenced in July, with geotechnical drilling underway and key engineering consultants being engaged • 5,760 m drilled during Q3, supporting resource upgrades and the PFS resource model • Operating rigs increased from two to six during the quarter • Field investigations continue through Q4 to support engineering activities in 2027 • PFS targeted for completion in late 2027
Page 10
9 Morelos: Compelling Near-Term Growth Potential to increase plant capacity by up to ~35%1 Production Growth ~50 kozpa AuEq Additional ~100 kozpa AuEq Estimated CAPEX ~$5 – 10 M ~$100 M Key Upgrades Debottlenecking existing infrastructure Additional flotation / ancillary equipment Status Implemented by end of 2027 Decision targeted Q1 2028 • Commencement of mining at Media Luna North will add a third mining front, increasing operational flexibility and supporting a phased ramp-up in total mining rates. o Media Luna North is expected to average ~1,000 tpd in 2027, with further ramp- up in subsequent years toward its ~2,300 tpd design capacity. o Longer-term combined mining capacity: ~13,000 tpd • Phased expansion of the processing plant to up to 14,500 tpd provides a potential capital- efficient pathway to meaningfully increase annual production 10,600 tpd Current ~14,500 tpd Potential Expansion ~11,500-12,500 tpd Potential Debottlenecking +20% +15% 1. Refer to endnote 3
Page 11
10 Morelos – Media Luna Cluster Targeting to replace depletion and grow resources on the south side of Morelos Property • San Miguel corridor: results indicate potential to materially add to the Morelos resource inventory o 17,928 m drilled year-to-date. Highlighted intersections include 11.28 g/t AuEq over 31.2 m and 10.75 g/t AuEq over 20.2 m • Media Luna: drilling targets resource conversion and extensions beyond the current resource boundary • Media Luna North: drilling to de-risk stopes planned for the first year of production • Media Luna West: drilling to focus on expanding inaugural Inferred Resource declared this year • ELG Underground: drilling results support potential reserve replacement and resource growth, including 14.32 g/t AuEq over 35.0 m in SST-491 along the eastern Z71 fault
Page 12
Financial Performance DAN ROLLINS | CFO
Page 13
12 Financial Performance AISC declined 27% quarter-over-quarter as free cash flow increased to $150M • Revenue of $555M and adjusted EBITDA of $344M reflect the stronger operating quarter • AISC declined from $2,459/oz AuEq in Q2 to $1,803/oz AuEq in Q3, primarily driven by higher mined/processed grades and improved Au recovery • Operating cash flow of $231M supported $150M of free cash flow, bringing year-to-date free cash flow to $402M Free cash flow increased 60% over Q2 to $150M AISC of $1,803/oz AuEq sold supports a 58% margin
Page 14
13 Cash Flow Generation Strong cash generation funded $95M in shareholder returns1 and increased cash to $226M Strong cash generation during the quarter supported: • $57M increase in cash • Generated $150M in FCF after $67M in CAPEX • $95M returned to shareholders, comprised of $11M in dividends and $84M in share buybacks 1. Refer to endnote 4
Page 15
14 Balance Sheet & Liquidity $226M cash and an undrawn credit facility provide flexibility for growth and shareholder returns Ahead of year-end cash balance to target of $200M Available liquidity increases to $563M • Cash increased $57M quarter-over-quarter to $226M • The cash balance increased while funding growth investment and returning capital to shareholders • Liquidity comprises $226M cash and $337M of available credit, net of letters of credit • The $350M revolving credit facility remains fully undrawn and matures in June 2030 1 1. Refer to endnote 5
Page 16
15 Peer-Leading Return of Capital Repurchased ~5% of shares outstanding to date in 2026 $10 $32 ~$43$34 $239 ~$307 $44 $271 $350 2025 Q3 YTD 2026 2026 Target Dividends Paid Shares Repurchased Total Capital Returned Share Buybacks • 2025: 825,769 shares purchased at C$57/sh • Q3 YTD 2026: 4,888,626 shares purchased at ~C$68/sh Dividend • Quarterly dividend of C$0.16/sh Capital Returned (M$)
Page 17
All amounts expressed in U.S. dollars unless otherwise stated Key Catalysts ANDREW SNOWDEN | President & CEO
Page 18
17 Key Catalysts Near-term execution and project milestones support the next phase of growth Q4 2026 Morelos operations Media Luna North first ore Improve ore supply and sequencing flexibility Capital markets Planned NYSE listing Broader investor access, subject to exchange approval Q1 2027 Morelos growth Plant debottlenecking Implementation expected to begin Reserves & resources Year-end resource update Targeting reserve replacement and resource growth H2 2027 Los Reyes Prefeasibility study Advance project design and development decisions Upgrade resources and evaluate opportunities to enhance project economics Early 2028 Processing plant optionality Potential expansion decision Increase total capacity to ~14,500 tpd. Decision following further drilling and engineering Decision drivers Resource confidence and growth Ore availability and economics to inform potential plant expansion Throughout 2027: San Miguel Corridor Drilling to evaluate the resource endowment near existing infrastructure and inform future Morelos expansion decisions Morelos growth Plant debottlenecking Ramp-up total capacity to ~11,500 to 12,500 tpd
Page 19
All amounts expressed in U.S. dollars unless otherwise stated Questions? Shaun Silveira | SVP, Corporate Development & Investor Relations shaun.silveira@torex.com
Page 20
19 Endnotes 1. These measures are non-GAAP financial measures with no standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. Refer to “Non-GAAP Financial Performance Measures” for further information and a detailed reconciliation to the comparable IFRS measures. 2. Q3 2026 gold equivalent ounces produced and sold include production and sales of silver (Ag) and copper (Cu) converted to a gold equivalent based on a ratio of the average market prices for each commodity sold in the period. For the three months ended September 30, 2026, market prices averaged $4,262/oz gold (Au), $62.59/oz Ag, and $6.40/lb Cu, and AuEq (oz) = Au (oz) + 1,000 * (62.59 / 4,262) x Ag (koz) + 1,000,000 x (6.40 / 4,262) x Cu (mlb). For the nine months ended September 30, 2026, market prices averaged $4,545/oz Au, $73.24/oz Ag, and $6.09/lb Cu, and AuEq (oz) = Au (oz) + 1,000 * (73.24 / 4,545) x Ag (koz) + 1,000,000 x (6.09 / 4,545) x Cu (mlb). Q2 2026 gold equivalent ounces produced and sold include production and sales of silver (Ag) and copper (Cu) converted to a gold equivalent based on a ratio of the average market prices for each commodity sold in the period. For the three months ended June 30, 2026, market prices averaged $4,506/oz gold (Au), $73.15/oz Ag, and $6.05/lb Cu, and AuEq (oz) = Au (oz) + 1,000 * (73.15 / 4,506) x Ag (koz) + 1,000,000 x (6.05 / 4,506) x Cu (mlb). For the six months ended June 30, 2026, market prices averaged $4,693/oz Au, $78.83/oz Ag, and $5.93/lb Cu, and AuEq (oz) = Au (oz) + 1,000 * (78.83 / 4,693) x Ag (koz) + 1,000,000 x (5.93 / 4,693) x Cu (mlb). 3. Potential plant expansions could increase throughput capacity by up to ~35%, subject to ongoing technical studies and investment approval. Incremental production will depend on achieved throughput, feed grade, recovery, and mill feed availability. 4. For more information on the Company's return of capital program, see the Company’s news release titled “Torex Gold Reports Enhanced Return of Capital Program” issued on May 6, 2026, and filed on SEDAR+ at www.sedarplus.ca and on the Company’s website at www.torexgold.com. 5. Available credit of $337M reflects the fully undrawn $350M revolving credit facility, net of $13M in outstanding letters of credit.