Slides
Page 1
9 M 2 0 2 5 R E S U L T S P R E S E N T A T I O N N o v e m b e r 1 7 , 2 0 2 5 9 MONTHS OF DISCIPLINED EXECUTION
Page 2
9M 2025 Results Presentation 2 Net Profits Up +148% and On Track for 3GW Installed by year - end. Upward EBITDA guidance for 2025 We Connect our First Hybrid BESS in Spain K E Y H I G H L I G H T S RECORD 9M
Page 3
+1,123 9M 2025E BESS Addition Est. Capacity addition 2025E CASTILE AND LEÓN 1 11 MW/44 MWh 9M 2025 Results Presentation 3 3 GW Installed by Year-End S O L A R I A D E L I V E R S – R E C O R D 9 M Evolution of the capacity in operation (MW) +57% 1,928 GAROÑA 710 MW CATALUÑA 200 MW >Construction completed PERALVECHE 150 MW >Construction completed TUCANA 45 MW >Construction completed C&L 2 18 MW/72 MWh 3,062 +281 MW New capacity addition ytd +1,123 MW Est. capacity addition by year end First Hybrid Battery Installed In Spain + 11 First Battery Installed
Page 4
9M 2025 Results Presentation 4 4.4 GW In Operation and Under Construction S O L A R I A D E L I V E R S – R E C O R D 9 M 988 311 2025E Solar PV under construction BESS under construction Capacity in operation and under construction 3,062 VILLAVICIOSA 515 MW OLIVA 175 MW MANTIA 150 MW CIRCINUS & MENSA 120 MW MARTE & PALACIOS 28 MW HYBRID BESS SPAIN 4,361 BESS SOLAR PV Portfolio status (MW) SOLAR PV Crossing 3 GW in 2025 and 4.4 GW in sight positions Solaria firmly in Europe’s top tier. Scale drives pricing, procurement power, and returns.
Page 5
9M 2025 Results Presentation 5 Strong Revenues S O L A R I A D E L I V E R S – R E C O R D 9 M Production Energy production decreased by over 5% to 2,010 GWh in the first nine months of the year, mainly due to lower solar radiation (- 3%). Total Revenues + 65% In the first nine month of the year, Sales increased 65%. 9M 2025 9M 2024 % chg. Production (GWh) 2,010 2,120 -5% Total Revenues (EUR M) 258.9 157.4 +65% 49.1 47.4 9M 2024 9M 2025 Average selling price (€/MWh) 75% 25% Contracted/Merchant LT Contracted Merchant
Page 6
9M 2025 Results Presentation 6 Upward EBITDA guidance for 2025 S O L A R I A D E L I V E R S – R E C O R D 9 M Beating guidance 9M EBITDA already at 90-94% of full-year target. Net profit Net profit expanding 2.5x despite flat prices: pure operational execution. 9M 2025 9M 2024 % chg. EBITDA (EUR M) 230.7 131.6 +75% EBIT (EUR M) 193.3 100.3 +93% Net Profit (EUR M) 141.7 57.1 +148%
Page 7
9M 2025 Results Presentation 7 S O L A R I A D E L I V E R S – R E C O R D 9 M 1. Ex derivative financial instruments Average cost of debt Average residual tenor of project finance debt 3.7% 12y Fixed/Swapped rate debt 83% Project debt 90% Net financial debt EUR 1,316 M1 EUR 1,174 M exIFRS16 NFD to Last 12M EBITDA 4.5xSOUND FINANCIAL POSITION EUR 244 M INVESTMENT Cash 2024 CashEBITDA Net finance income/(expense) Working capital Capex Debt issue Debt payment Net Issue of promissory notes OPERATING CF 62.5 INVESTING CF (243.9) FINANCING CF 177.8 YTD Cash performance (EUR M) 54.3 230.7 (21.5) (146.7) (45.4) 55.8167.4 50.8
Page 8
9M 2025 Results Presentation 8 O U T L O O K We Are Going to Exceed our EBITDA Target 2020A 2021A 2022A 2023A 2024A 9M 2025A 2025E 201.3 49 93 147 200 245-255 EBITDA evolution (EUR M) 230.7 Solaria model compounds – megawatts , EBITDA, equity value . Same strategy, higher velocity. Solaria fundamentals confirm the trend: scale up, costs stable, capital intensity declining per MW, operational leverage improving across the fleet.
Page 9
Appendix 9M 2025 Results Presentation 9
Page 10
A P P E N D I X 9M 2025 9M 2024 % chg. Capacity (MW) 1,928.0 1,658 +16% Spain 1,825.0 1,555 +17% Portugal and Greece 63.7 63.7 - Uruguay 22.7 22.7 - Italy 16.7 16.7 - Production (GWh) 2,010.0 2,120.5 -5% Spain 1,905.1 2,005.8 -5% Portugal and Greece 66.2 77.3 -14% Uruguay 22.8 20.5 11% Italy 15.9 16.8 -5% 10 Operating data 9M 2025 Results Presentation 9M 2025 9M 2024 % chg. Energy Sales (EUR M) 96.4 104.1 -7% Spain 84.6 89.0 -5% Portugal and Greece 1.8 2.3 -23% Uruguay 2.9 2.1 +37% Italy 7.2 10.6 -32% Average price (EUR/MWh) 48.0 49.1 -2% Spain 44.4 44.4 - Portugal and Greece 26.7 29.8 -10% Uruguay 126.1 102.4 +23% Italy 451.2 631.0 -28%
Page 11
A P P E N D I X 11 Income Statement 9M 2025 Results Presentation (EUR M) 9M 2025 9M 2024 Relative change (%) Total revenues 258.9 157.4 65 Personnel expenses (14.5) (13.6) 6 Operating expenses (13.8) (12.1) 14 EBITDA 230.7 131.6 75 Amortisation (37.4) (31.3) 19 EBIT 193.3 100.3 93 Financial Income/Loss (30.9) (26.1) 19 Profit before tax 162.4 74.2 119 Tax (20.72) (17.1) 21 NET PROFIT 141.7 57.1 148
Page 12
A P P E N D I X 12 Balance Sheet 9M 2025 Results Presentation Assets (Eur M) 9M 2025 FY 2024 Relative change (%) Non-current assets 2,125.5 1,806.9 18 Intangible assets 0.3 0.3 -7 Surface rights 140.0 144.1 -3 Tangible fixed assets 1,698.5 1,528.0 11 Other non-currents financial assets 240.4 87.5 175 Deferred tax assets 46.2 47.0 -2 Current assets 205.5 161.8 27 Non-current assets held for sale 28.9 28.9 0 Trade and other receivables 116.5 70.5 65 Other current assets (derivatives) 9.1 7.9 15 Cash and other equivalent assets 50.8 54.3 -6 Total Assets 2,330.9 1,968.6 18 Liabilities (Eur M) 9M 2025 FY 2024 Relative change (%) Equity 730.9 617.8 18 Capital and share premium 310.9 310.9 - Reserves 260.4 167.1 56 Treasury stock -34.3 - - Non-controlling interest 5.2 4.0 31 Profit for the year 141.7 88.6 60 Value adjustments 46.3 47.2 -2 Non-current liabilities 1,241.8 1,057.5 17 Obligations and long-term bonds 114.3 109.1 5 Financial liabilities with credit institutions 924.1 747.0 24 Financial lease creditors 135.1 138.7 -3 Derivative financial instruments 23.5 23.1 2 Deferred tax liability 44.8 39.7 13 Current liabilities 359.0 293.3 22 Obligations and short-term bonds 126.0 79.2 59 Financial liabilities with credit institutions 60.6 56.7 7 Financial lease creditors 6.8 16.8 -59 Derivative financial instruments 0.9 1.3 -32 Commercial creditors and other accounts payable 164.8 139.3 18 Total Equity and Liabilities 2,330.9 1,968.6 18
Page 13
D I S C L A I M E R 13 This document has been prepared by SOLARIA ENERGÍA Y MEDIO AMBIENTE, S.A. (“Solaria”) for information purposes only and it is not a regulated information or information that has been subject to prior registration or review by the Spanish Securities Market Commission. By attending a meeting where this document is presented, or by reading the slides contained herein, you will be deemed to have: (i) agreed to the following limitations and notifications and made the following undertakings; and (ii) acknowledged that you understand the legal and regulatory sanctions attached to the misuse, disclosure or improper circulation of this document. This document includes summarised audited and unaudited information. The financial and operational information, as well as the data on the acquisitions that have been carried out, included in the presentation, come from the accounting records of Solaria. Such information may in the future be subject to audit, limited review or any other control by an auditor or an independent third party and therefore, this information may be modified or amended in the future. The ordinary shares of Solaria are listed on the Madrid, Barcelona, Bilbao and Valencia Stock Exchanges (the “Spanish Stock Exchanges”), and Solaria is therefore required to publish certain business and financial information in accordance with the rules and practices of the Spanish Stock Exchanges and the Spanish Securities Market Commission (the “Exchange Information”), which includes its audited annual financial statements. This information is available, in both the Spanish and English languages, on Solaria’s website (www.solariaenergia.com). Neither this document nor any information contained herein may be reproduced in any form, used or further distributed to any other person or published, in whole or in part, for any purpose. Failure to comply with this obligation may constitute a violation of applicable securities laws and/or may result in civil, administrative or criminal penalties. This document is not an offer for the sale or the solicitation of an offer to subscribe for or buy any securities in the United States or to U.S. persons. The securities of Solaria may not be offered or sold in the United States absent registration or an exemption from registration under the U.S. Securities Act of 1933, as amended (the “Securities Act”). Neither this document nor any copy of it shall be taken, transmitted into, disclosed, diffused, published or distributed in the United States, Canada, Australia or Japan. The distribution of this document in other jurisdictions may also be restricted by law and persons into whose possession this document comes should inform themselves about and observe any such restrictions. This document is not a prospectus and does not constitute or form part of, and should not be construed as, any offer, inducement, invitation, solicitation or commitment to purchase, subscribe to, provide, sell or underwrite any securities, services or products or to provide any recommendations for financial, securities, investment or other advice or to take any decision. This document includes, in addition to historical information, forward-looking statements about revenue and earnings of Solaria and about matters such as its industry, business strategy, goals and expectations concerning its market position, future operations, margins, profitability, capital expenditures, capital resources and other financial and operating information. Forward-looking statements include statements concerning plans, objective, goals, strategies, future events or performance, and underlying assumptions and other statements, which are other than statements of historical facts. The words “believe”, “expect”, “anticipate”, “intends”, “estimate”, “forecast”, “project”, “will”, “may”, “should” and similar expressions identify forward-looking statements. Other forward looking statements can be identified from the context in which they are made. These forward-looking statements are based on numerous assumptions regarding the present and future business strategies of Solaria and the environment in which Solaria expects to operate in the future. These forward-looking statements involve known and unknown risks, uncertainties, assumptions, estimates and other factors, which may be beyond Solaria’s control and which may cause the actual results, performance or achievements of Solaria, or industry results, to be materially different from those expressed or implied by these forward-looking statements. None of the future projections, expectations, estimates or prospects in this document should be taken as forecasts or promises nor should they be taken as implying any indication, assurance or guarantee that the assumptions on which such future projections, expectations, estimates or prospects have been prepared are correct or exhaustive or, in the case of the assumptions, fully stated in the document. Many factors could cause the actual results, performance or achievements of Solaria to be materially different from any future results, performance or achievements that may be expressed or implied by such forward- looking statements. Should one or more of these risks or uncertainties materialise, or should underlying assumptions prove incorrect, actual results may vary materially from those described herein as anticipated, believed, estimated, expected or targeted. As a result of these risks, uncertainties and assumptions, you should not place undue reliance on these forward-looking statements as a prediction of actual results or otherwise. The information in this document has not been independently verified and will not be updated. The information in this document, including but not limited to forward-looking statements, applies only as of the date of this document and is not intended to give any assurances as to future results. Solaria expressly disclaims any obligation or undertaking to disseminate any updates or revisions to the information, including any financial data and any forward-looking statements, contained in this document, and will not publicly release any revisions that may affect the information contained in this document and that may result from any change in its expectations, or any change in events, conditions or circumstances on which any forward-looking statements are based or whichever other events or circumstances arising on or after the date of this document. Market and competitive position data used in this document not attributed to a specific source, if any, are estimates of Solaria and have not been independently verified. While Solaria believes, acting in good faith, that such estimates are reasonable and reliable, they and their underlying methodology and assumptions have not been verified by independent sources for accuracy or completeness and are subject to change. Additionally, certain data in this document has been obtained from third parties. While such data is believed, in good faith, to be reliable for the purposes for which they are used in this document, Solaria expressly disclaims any liability as to the accuracy or completeness of such data. Accordingly, you should not place undue reliance on this information. Certain financial and statistical information contained in this document is subject to rounding adjustments. Accordingly, any discrepancies between the totals and the sums of the amounts listed are due to rounding. Certain management financial and operating measures included in this document have not been subject to a financial audit nor have been independently verified by a third party. This document discloses neither the risks nor other material issues regarding an investment in the securities of Solaria. The information included in this presentation is subject to, and should be read together with, all publicly available information, including the Exchange Information. However, you should be aware that (i) Solaria’s business and results of operations are dependent on the regulatory environment and (ii) Solaria’s pipeline involves numerous risks and uncertainties. Regulation The development, construction and operation of solar PV parks are highly regulated activities and Solaria conducts its operations in many countries and jurisdictions, which are governed by different laws and regulations. Such laws and regulations require licenses, permits and other approvals to be obtained and maintained in connection with the operation of its activities. The procedures for obtaining such licenses, permits and other approvals vary from country to country, making it onerous and costly to track the requirements of individual localities and comply with the varying standard. In addition, this regulatory framework imposes significant actual, day-to-day compliance burdens, costs and risks on us. In particular, in the countries where Solaria operates, solar PV parks are subject to strict EU (for those located in Spain, Italy and Greece), national, regional and local regulations relating to their operation and expansion (including, among other things, land use rights, regional and local authorizations and permits necessary for the construction and operation of facilities, permits on landscape conservation, noise, hazardous materials or other environmental matters and specific requirements regarding the connection and access to the electric transmission and/or distribution networks). Non- compliance with such regulations could result in the revocation of permits, sanctions, fines or even criminal penalties. Compliance with regulatory requirements may result in substantial costs to Solaria’s operations that may not be recovered. In addition, Solaria cannot predict whether the permits will attract significant opposition (public or otherwise including on account of litigation) or whether the permitting process will be lengthened due to administrative complexities and appeals. Additionally, changes to these laws and requirements or of its interpretation by regulatory authorities and courts or the implementation of new such regulations affecting the solar PV parks in Solaria’s portfolio may result in significant additional expenses and may have a material adverse effect on Solaria’s business, financial condition, results of operations and cash flows to the extent that Solaria cannot comply with such laws. Thus, laws and regulations could be changed to provide for new rate programs that undermine the economic returns for both new and existing solar PV parks in operation by charging additional, non- negotiable fixed or demand charges or other fees or reductions in the number of solar PV projects allowed under net metering policies. These changes may make the development of a solar PV park infeasible or economically disadvantageous and any expenditure Solaria may have made on such solar PV park may be wholly or partially written off. Solaria also faces regulatory risks imposed by various transmission providers and operators, including regional transmission operators and independent system operators, and their corresponding market rules. These regulations may contain provisions that limit access to the transmission grid or allocate scarce transmission capacity in a particular manner, which could materially and adversely affect Solaria’s business, financial condition, results of operations and cash flows. To the extent Solaria enters into new markets in different jurisdictions, Solaria will face different regulatory regimes, business practices, governmental requirements and industry conditions. As a result, Solaria’s prior experiences and knowledge in other jurisdictions may not be relevant, and Solaria may spend substantial resources familiarizing itself with the new environment and conditions. Pipeline Solaria’s current business strategy requires the successful completion of the development and operation of the projects in its portfolio and its plans to further organically grow such portfolio of solar PV parks. As part of Solaria’s growth plan, Solaria may acquire solar PV parks in different development stages. The development of the projects in Solaria’s pipeline involves numerous risks and uncertainties and requires extensive funding, research, planning and due diligence. Solaria may be required to incur significant amounts of capital expenditure for land viability analysis, land and interconnection rights, preliminary engineering, permitting, legal and other expenses before it can determine whether a solar PV park is economically, technologically or otherwise feasible. Difficulties that Solaria may face when executing this development and growth strategy include: • obtaining and maintaining required construction, environmental and other permits, licenses and approvals; securing suitable project sites, necessary rights of way and satisfactory land rights (including land use) in the appropriate locations with capacity on the transmission grid; • unanticipated changes in project plans; • connecting to the power grid on schedule and within budget; • connecting to the power grid if there is insufficient grid capacity; • identifying, attracting and retaining qualified development specialists, technical engineering specialists and other key personnel; • entering into PPAs or other arrangements that are commercially acceptable and adequate to obtain third-party financing therefor; • securing cost-competitive financing on attractive terms; • the availability of solar PV modules and other specialized equipment, increases in their prices and negotiating favorable payment terms with suppliers; • negotiating satisfactory engineering, procurement and construction (“EPC”) agreements; • satisfactorily completing construction on schedule, avoiding defective or late execution by providers and contractors labor, including equipment and materials supply delays, shortages or disruptions, work stoppages or labor disputes; • cost over-runs, due to any one or more of the foregoing factors; • operating and maintaining solar PV parks efficiently to maintain the power output and system performance; and • accurately prioritizing geographic markets for entry, including estimates on addressable market demand. Accordingly, some of the pipeline solar PV projects may not be completed or even proceed to construction and Solaria may not be able to recover any of the amounts invested. All the foregoing shall be taking into account by those persons or entities which have to take decisions or issue opinions relating to the securities issued by Solaria. All such persons or entities are invited to consult all public documents and information of the Company registered within the Spanish Securities Market Commission, including the Exchange Information. 9M 2025 Results Presentation