RNS Number : 1916TTungsten West PLC03 September 2026 3 September 2026 Tungsten West Plc("Tungsten West", the "Company" or the "Group") Financial Results for the Year Ended 31 March 2026 Release of Annual Report and Notice of Annual General Meeting Tungsten West (LON:TUN), the mining company focused on restarting production at the Hemerdon tungsten andtin mine ("Hemerdon" or the "Project") in Devon, UK, is pleased to announce its audited results for the yearended 31 March 2026 and the date of its forthcoming Annual General Meeting ("AGM"). The Company's AGM will be held at the offices of Tungsten West Plc, at Hemerdon Mine, Drakelands, Plympton,Devon, PL7 5BS at 1:00 p.m. on 29 September 2026. Copies of Tungsten West's Annual Report and Financial Statements for the Financial Year to 31 March 2026,Notice of AGM and Form of Proxy are available to download from the Company's website atwww.tungstenwest.com and will shortly be posted to shareholders. Financial Year Business Highlights · Strong safety record maintained with zero Lost Time Incidents as the Project commenced a significant ramp-upin activity with construction and operational readiness. · £43 million (gross) of equity funds were raised in February 2026 enabling the commencement of construction,positioning the Company to significantly advance the timeline to production. · Continued strength of the tungsten market and ammonium paratungstate (APT) pricing further reinforcing thesignificantly improved Project economics. · Year-end cash position strengthened markedly, with cash and cash equivalents increasing substantially to£25.5 million (2025: £0.02 million), driven predominantly by the Company's funding activities. · The Company recorded its first tungsten concentrate sales of £0.6 million in December 2025 from re-commissioning of the pre-existing Mineral Processing Facility ("MPF"). · Appointment of key leadership and operational roles including, Chief Financial Officer and Chief OperatingOfficer. · Execution of major equipment supply contracts for the MPF improvement plan, notably an Engineering,Procurement, and Construction ("EPC") contract with Duo Group for the New Build Crushing, Screening andOre Sorter Facility, a supply agreement with Gekko Systems Pty Limited for an In-Line Pressure Jig system andwith McHale Komatsu for the supply of mining equipment. Post-Financial Year Business Highlights · The Company has commenced operation of the fines gravity circuit and has produced tungsten and tinconcentrate as part of the Company's restart plans. · The Company remains on track to fully complete on time and within budget its restart constructionactivities by the end of Q1 2027. · In August 2026, the Company announced an investment of up to £71 million from the UK Government'sNational Wealth Fund. This investment ensured the Company is fully funded through to full production. Financial Year Summary · For the financial year ended 31 March 2026, the Company reported an operating loss of £7.9 million (2025:operating loss of £19 million) reflecting the main initiatives conducted during this period, including finalisingthe feasibility study (published in August 2025) and pre-operational readiness activities. · The Group completed multiple fundraising transactions during the year: o £5.2 million was raised from two tranches of Convertible Loan Notes ("CLN"s); o £4.0 million was committed under a bridge finance facility in December 2025. £2.0 million was drawnand repaid in February 2026;
Page 2
o The CLNs were converted into equity in December 2025 and February 2026. These conversionsresulted in the recognition of a non-cash finance adjustment of £167.3 million, arising from the fairvalue movement on the CLNs due principally to the significant appreciation in the Company's shareprice relative to the CLN conversion price. The charge was entirely non-cash and had no impact onthe Company's cash position; o £43 million (gross) of equity funds were raised in February 2026. Jeff Court, CEO of Tungsten West, commented: "The financial year ended 31 March 2026 was a period of significant progress for the Company. The Company isnow fully funded, following a funding journey that began during this reporting period and culminated in recentweeks with the National Wealth Fund's landmark investment of up to £71 million. We have achieved strongprogress and remain on-track and on budget for full commissioning in Q1 2027, most importantly, with no losttime injuries. We have also achieved the significant milestone of first production from our restart project alreadyin Q3 2026. "The financial results reported for the previous financial year reflect the strategic pivot of the Company to adevelopment project and full-scale production early next year. As a direct result of this journey, and the conversionof the Company's Convertible Loan Notes our financials reflect a non-cash finance adjustment of £167.3 million.Importantly, this is a non-cash accounting adjustment only and has had no impact whatsoever on the Company'scash position, liquidity or ability to execute its business plan. "I am delighted that we are positioned on a firm financial and operational footing to support the restart ofHemerdon. Initial production is already underway, and we look forward to the progress towards fullcommissioning in Q1 2027 (calendar year). "I would like to thank all our stakeholders for their continued support." Ends For further information, please contact: Tungsten West Jeff Court, Chief Executive Officer Phil Povey, Chief Financial Officer Tel: +44 (0) 1752 278500 Strand Hanson Limited (Nominated Adviser and Financial Adviser) James Spinney / James Dance / AbigailWennington Tel: +44 (0) 207 409 3494 BlytheRay (Financial PR) Megan Ray / Rachael Brooks Tel: +44(0) 20 7138 3204 Email: tungstenwest@blytheray.com Hannam & Partners (Broker) Andrew Chubb / Matt Hasson Tel: +44 (0)20 7907 8500 Chairman's Statement I am pleased to present the Group's audited results for the year ended 31 March 2026. This was a year of significant progress for Tungsten West. The Company completed the technical and commercial work needed to establish a credible pathway to restart the Hemerdon tungsten and tin mine, and made substantial progress towards securing the funding to get there. Alongside the updated Feasibility Study and the financing steps set out in the CEO's statement, the Group converted its outstanding convert- ible loan notes into equity during the year and completed a series of capital raisings. Together with the funding secured with National WealthFund Limited after the year end - comprising an equity raise of £36 million (before costs) and a 366-day, £25 million loan facility, with a £10 million uncommitted accordion - these transactions give the Company a clear route to bring Hemerdon back into production. We have also built the team to support this: more than 150 employees have joined to support the restart, a significant proportion from the local area, with further recruitment planned as the operation expands. Phased processing activities have commenced (fines gravity circuit), andcommissioning is scheduled to progress through to the first quarter of 2027. The strategic case for Hemerdon has also strengthened. China's introduction of tungsten export controls in February 2025 tightened supply outside China, reinforcing the need for secure Western sources of critical minerals and contributing to stronger tungsten prices - a further improvement to the Project's economics.
Page 3
Adrian Bougourd and Martin Wood will not be seeking re-election as Directors at the forthcoming AGM. On behalf of our Board and share- holders, I would like to thank Adrian and Martin for their significant contribution and commitment to Tungsten West. On behalf of the Board, I would like to thank all our stakeholders including our employees, local residents, regulators, contractors, advisers, financing partners and shareholders for their continued support. Stephen Harrison Non-Executive Chairman Chief Executive Officer's Report The financial year ended 31 March 2026 was a pivotal year for Tungsten West, as we advanced Hemerdon towards restart and strengthened the technical, operational and financial foundations needed to become a strategically important tungsten and tin producer. Hemerdon is a rare asset: a substantial resource, a long operating life, significant existing infrastructure and a location in a stable, well- regulated jurisdiction. Few undeveloped tungsten projects globally combine scale with this level of strategic relevance. Tungsten's hardness, density and heat resistance make it essential to cutting tools, aerospace, defence and advanced manufacturing, and Western governments and industrial customers are increasingly focused on securing supply outside a small number of overseas sources. That strategic case strengthened further during the year. China's introduction of tungsten export controls in February 2025 materially tightened supply outside China, reinforcing the need for secure Western sources and contributing to stronger tungsten prices - further improving the economic outlook for the Project. We also made concrete progress translating that opportunity into a deliverable plan. Our updated Feasibility Study, published in August 2025, incorporated the lessons of the mine's previous operation and confirmed a revised development plan built around a new crushing, screening and ore-sorting front end, additional gravity separation equipment, refurbishment of the pre-existing mineral processing facility, and enhanced environmental mitigation. Funding remains our most important objective, and we made substantial progress against it. During the year, the Group converted its outstanding convertible loan notes into equity and completed a series of capital raisings, which together enabled us to finalise the Feasibility Study, place orders with equipment suppliers, progress development works and advance discussions with debt providers. Following the year end, we built on this momentum: securing funding from National Wealth Fund Limited in August 2026, comprising an equity raise of £36 million (before costs) and a 366-day £25 million loan facility, with a £10 million uncommitted accordion. Together, these milestones give the Company afully funded runway to full scale production in Q1 2027. The strategic backdrop continues to strengthen more broadly. Governments across the UK, Europe and North America are placing growing emphasis on critical-mineral supply security, and a successful restart would give the UK a substantial domestic tungsten source and a more resilient Western supply chain. We are engaging with potential customers and partners accordingly, with an ambition to be a strategic supplier,not just a producer. Execution is now the defining task, and it is already under way. Initial processing and commissioning activities have commenced, with commissioning scheduled to progress from Q3 2026 to completion at the end of Q1 2027. We are building an operation that is technically robust, appropriately funded, on the lowest cost quartile of global tungsten producers and built to high standards of safety and environmentalperformance. Building the right team behind this restart has been as important as the technical work itself, and recruitment - drawing significantly on the local area - continues as the operation expands. Responsible development sits alongside this: mining activity affects neighbouring communities - noise, dust, traffic and change - and we take that seriously, committing to transparent engagement and appropriate independent monitoring asactivity increases. Hemerdon has real potential to deliver multi-generational benefits to the South West, from skilled jobs to local procurement, training and investment. Safety remains non-negotiable - no target or milestone takes precedence over it - and we continue to strengthen the systems, culture and accountability that underpin it, alongside our environmental and governance commitments. We enter the next phase with a clearer strategy, a stronger financial footing and a sharper focus on delivery. The task now is to convert Hemerdon's potential into performance. Thank you to our employees, contractors, advisers, financing partners and shareholders for their continued support and professionalism thisyear. Jeffery Court Chief Executive Officer Consolidated Statement of Comprehensive Income Year ended 31 March 2026 Note 2026£ 2025£
Page 4
Restated* Revenue 5 601,550 - Cost of sales (152,053) (244,174) Gross profit / (loss) 449,497 (244,174) Administrative expenses 8 (8,809,815) (9,268,993) Other operating income 6 420,000 6,235 Other gains/(losses) 7 35,000 (9,506,522) Operating loss 8 (7,905,318) (19,013,454) Finance income 9 297,031 898,195 Finance costs 9 (167,972,454) (6,842,326) Net finance cost 9 (167,675,423) (5,944,131) Loss before tax (175,580,741) (24,957,585) Income tax credit 13 134,470 264,572 Loss for the year (175,446,271) (24,693,013) Total comprehensive loss (175,446,271) (24,693,013) Loss attributable to: Owners of the Company (175,446,271) (24,693,013) £ £ Basic and diluted loss per share 14 (0.12) (0.13) The above results were derived from continuing operations. The notes on pages 37 to 67 are an integral part of these financial statements. *For details of restatement please refer to note 37 Consolidated Statement of Financial Position Year ended 31 March 2026 Note 31 March2026£ 31 March2025£Restated* 1 April2024£Restated* Assets Non-current assets Property, plant and equipment 15 14,640,161 9,455,736 19,266,279 Right-of-use assets 16 1,869,677 1,984,419 1,895,584 Intangible assets 17 8,850 64,760 138,832 Mining rights assets 18 2,272,784 2,306,715 4,189,431 Deferred tax assets 13 406,931 406,931 421,818 Escrow Cash 20 14,912,042 14,633,857 13,740,012 34,110,445 28,852,418 39,651,956 Current assets Inventories 23 29,850 29,850 29,850 Trade and other receivables 21 12,574,406 2,986,872 2,809,893 Cash and cash equivalents 22 25,485,511 18,442 1,581,535 38,089,767 3,035,164 4,421,278 Total assets 72,200,212 31,887,582 44,073,234
Page 5
Equity and liabilities Equity Share capital 28 15,047,487 1,887,313 1,870,741 Share premium 29 277,030,598 51,949,078 51,949,078 Share option reserve 28 226,999 319,526 256,278 Retained earnings (234,036,348) (58,590,077) (33,897,064) Equity attributable to owners of the Company 58,268,736 (4,434,160) 20,179,033 Non-current liabilities Loans and borrowings 25 1,742,223 1,870,366 1,803,533 Provisions 26 7,029,253 6,703,821 8,221,081 Deferred tax liabilities 13 406,931 406,931 421,818 9,178,407 8,981,118 10,446,432 Current liabilities Trade and other payables 24 4,648,342 2,570,049 1,754,903 Loans and borrowings 25 104,727 24,770,575 11,692,866 4,753,069 27,340,624 13,447,769 Total liabilities 13,931,476 36,321,742 23,894,201 Total equity and liabilities 72,200,212 31,887,582 44,073,234 *For details of restatement please refer to note 37. The notes on pages 37 to 67 are an integral part of these financial statements. The financial statements were approved by the Board on 2nd September 2026 and signed on its behalf by: Stephen Harrison Chairman Company Registration Number: 11310159 Consolidated Statement of Changes in Equity Year ended 31 March 2026 Share capital£ Share premium£ Share optionreserve£ Retainedearnings£ Total£ At 31 March 2025(restated*) 1,887,313 51,949,078 319,526 (58,590,077) (4,434,160) Loss for the year - - - (175,446,271) (175,446,271) Total comprehensiveloss - - - (175,446,271) (175,446,271) Conversion ofconvertible loan notes 25 8,181,588 189,030,853 197,212,441 New share capitalsubscribed net of issuecosts 28 4,978,586 36,050,667 - - 41,029,253 Share options charge - - (92,527) - (92,527) At 31 March 2026 15,047,487 277,030,598 226,999 (234,036,348) 58,268,736 At 01 April 2024 (asoriginally stated) 1,870,741 51,949,078 256,278 (32,764,067) 21,312,030 Prior year restatement (1,132,997) (1,132,997) At 01 April 2024(restated*) 1,870,741 51,949,078 256,278 (33,897,064) 20,179,033
Page 6
Loss for the year(restated*) - - - (24,693,013) (24,693,013) Total comprehensiveloss - - - (24,693,013) (24,693,013) New share capitalsubscribed 16,572 - - - 16,572 Share options charge - - 63,248 - 63,248 At 31 March 2025(restated*) 1,887,313 51,949,078 319,526 (58,590,077) (4,434,160) The nature and purpose of each reserve is set out in Note 28. The notes on pages 37 to 67 are an integral part of these financial statements. *For details of restatement please refer to note 37. Consolidated Statement of Cash Flows Year ended 31 March 2026 Note 2026 2025 £ £ Restated* Cash flows from operating activities Loss for the year (175,446,271) (24,693,013) Adjustments to cash flows from non-cash items Depreciation and amortisation 8 374,943 470,036 (Gain)/Loss on disposal of tangible fixed assets 8 (35,000) 5,181 Impairment of asset under construction 7 - 9,506,522 Finance income 9 (297,031) (898,195) Finance costs 9 167,972,454 6,842,326 share options charge' 10 (92,527) 63,248 Impact of foreign exchange 9 (25,746) (12,734) Income tax credit 13 (134,470) (264,572) (7,683,648) (8,981,201) Working capital adjustments Decrease in trade and other receivables 21 (9,587,534) (176,981) Increase in trade and other payables 24 2,212,763 1,079,720 Net cash outflow from operating activities (15,058,419) (8,078,462) Cash flows from investing activities Interest received 9 18,846 4,350 Acquisitions of property, plant and equipment 15 (5,633,715) (19,885) Proceeds from property, plant and equipment 280,000 - Acquisitions of intangibles 17 - (750) Net cash outflows from investing activities (5,334,869) (16,285) Cash flows from financing activities Interest paid 9 (155,154) (5,766) Proceeds from issue of ordinary shares, net of issue costs 28 41,029,253 16,572 Proceeds from the issue of convertible loan notes, net of issue costs 28 5,205,000 6,751,000 Proceeds from the issue of bridging loans, net of issues costs 25 2,000,000 - Repayment of bridging loans 25 (2,000,000) - Payments to hire purchase (6,397) (31,873) Payments to lease liabilities (212,345) (198,279) Net cash inflows from financing activities 45,860,357 6,531,654 Net increase/(decrease) in cash and cash equivalents 25,467,069 (1,563,093) Cash and cash equivalents at 1 April 18,442 1,581,535 Cash and cash equivalents at 31 March 25,485,511 18,442 *For details of restatement please refer to note 37 The notes on pages 37 to 67 are an integral part of these financial statements. Major non-cash items During the period, convertible loan notes with a carrying value of £197,212,441 immediately prior to conversion were converted into 584,831,728 ordinary shares and 490,402,989 B shares in the Company. This transaction did not involve the movement of cash and is therefore not reflected within financing activities in the Consolidated Statement of Cash Flows. The conversion resulted in the derecognition of the convertible loan note liability of £197,212,441 and the recognition of share capital and share premium in respect of the ordinary shares and B shares issued.
Page 7
Notes to the Consolidated Financial Statements Year ended 31 March 2026 1 General information Tungsten West plc ('the Company') is a public limited company, incorporated in England and Wales and domiciled in the United Kingdom. The address of its registered & principal place of business is: Hemerdon Mine Drakelands Plympton Devon PL7 5BS United Kingdom 2 Accounting policies Summary of significant accounting policies and key accounting estimates The principal accounting policies applied in the preparation of these financial statements are set out below. These policies have been consistently applied to all the years presented, unless otherwise stated. Application of new and revised UK adopted International Financial Reporting Standards (UK-adopted IFRS) New and amended Standards and Interpretations applied The following amendments are effective for the year beginning 1 January 2025: · Amendments to IAS 21 - Lack of Exchangeability The adoption of these new standards and amendments did not have a material impact on the Group. New and revised Standards and Interpretations in issue but not yet effective At the date of approval of these financial statements, the Company has not early adopted the following amendments to Standards and Interpretations that have been issued but are not yet effective: Standard or Interpretation Effective for annual periods commencing onor after Classification & Measurement of Financial Instruments (Amendmentsto IFRS 9 & IFRS 7) 1 January 2026 Annual Improvements - Volume 11 (IFRS 1, 7, 9, 10 & IAS 7) 1 January 2026 IFRS 18 Presentation and Disclosure in Financial Statements-Basisfor Conclusions 1 January 2027 The Group is assessing the impact of IFRS 18. The Directors do not currently expect the adoption of these standards and amendments to have a material impact on the Group's recognised assets, liabilities or profit, although additional presentation and disclosure requirements may arise. Basis of preparation The Group financial statements have been prepared in accordance with International Accounting Standards as adopted in the United Kingdom ('UK adopted IAS') and those parts of the Companies Act 2006 that are applicable to companies which apply UK adopted IAS. The financial statements are presented in Sterling, which is the functional currency of the Group and Company. Going Concern The Group and Company financial statements have been prepared on a going concern basis, which the Directors consider to be appropriate forthe reasons set out below, having given careful consideration to the Group's and Company's financial position, funding arrangements and future cash flow forecasts, covering a period of at least twelve months from the date of approval of these financial statements. The Group's principal asset is the Hemerdon Mine (also known as Drakelands Mine), operated by Drakelands Restoration Limited. During the year ended 31 March 2026 the Group was a developer with low levels of production. A phased restart of commissioning commenced from July2026 and will ramp up through the remainder of the calendar year and into 2027. During the year, the Group significantly strengthened its funding position. In February 2026, the Company completed an equity fundraise of approximately £43 million (gross). Separately, the Group's outstanding Convertible Loan Notes converted into equity during the year and were accordingly extinguished, removing the Group's prior reliance on convertible loan note financing and associated short-term bridging finance.Following the year end, the Group secured further funding from National Wealth Fund Limited ("NWF"), comprising an equity raise of approximately £36 million (before expenses) and a new 366-day £25 million loan facility, with a £10 million uncommitted accordion. Together, these transactions secured the funding required for the Group's remaining project capital expenditure at Hemerdon. As at the date of these accounts, the £25 million loan facility had been drawn down in full.
Page 8
The Directors have prepared detailed cash flow forecasts covering the going concern assessment period, based on the production, cost and pricing assumptions underpinning the Group's Feasibility Study, updated to reflect the phased restart plan, and the funding secured as describedabove. These forecasts have been sensitised for a range of downside scenarios, consistent with the sensitivity analysis performed as part of the Feasibility Study and the value in use assessment described in note 2, including delays to the production ramp-up schedule, lower than forecast metal prices and recoveries, and unfavourable movements in foreign exchange rates. The Directors have also modelled a downside scenario addressing the risk of delay to completion of the front-end crushing circuit. Under thisscenario, the Group would fall back on its existing mobile front-end crushing and in-pit crushing arrangements with a contractor - the process route already in use earlier in the year - pushing back the ramp-up of the permanent front-end by three months. This fallback route carries a higher per-tonne processing cost than the planned front-end/ore sorter route, increasing operating costs over the delay period by approximately £3 million. The Group has also modelled a corresponding pause to waste mining over the same period, which reduces drill and blast costs but is offset by increased haulage costs to the more distant processing facility under the fallback route; these two effects have been assessed asbroadly offsetting. Under each of the scenarios modelled, the Group retains sufficient liquidity throughout the going concern period, taking into account the £25 million NWF loan facility (with its £10 million uncommitted accordion) and the Group's cash resources. The Directors have also considered the maturity of the NWF loan facility, which is repayable 366 days from drawdown, and have concluded that the Group's forecast operating cash flows from production, together with the accordion facility and the Group's ongoing relationship with NWF, provide a reasonable basis to expect that the facility can be refinanced or repaid as it falls due. Having considered the matters set out above, the Directors have a reasonable expectation that the Group and Company have adequateresources to continue in operational existence for the going concern assessment period. Accordingly, the Directors continue to adopt the going concern basis in preparing these financial statements. This represents a change from the prior year, in which a material uncertainty relating to going concern was disclosed pending completion of the Group's longer-term funding arrangements. Basis of consolidation The Group financial statements consolidate the financial statements of the Company and its subsidiary undertakings drawn up to 31 March 2026. A subsidiary is an entity controlled by the Company. Control is achieved where the Company has the power to govern the financial and operating policies of an entity so as to obtain benefits from its activities. Accounting policies of subsidiaries have been changed where necessary to ensure consistency with the policies adopted by the Group. The purchase method of accounting is used to account for business combinations that result in the acquisition of subsidiaries of the Group. The cost of a business combination is measured as the fair value of the assets given, equity instruments issued and liabilities incurred or assumed as at the date of exchange. Identifiable assets acquired and liabilities and contingent liabilities assumed in a business combination are measured initially at their fair values at the acquisition date, including deferred tax if required. Any excess of the cost of the business combination over the acquirer's interest in the net fair value of the identifiable assets, liabilities and contingent liabilities is recognised as goodwill. Business Combinations Business combinations are accounted for using the acquisition method. The consideration transferred in a business combination is measured at fair value at the acquisition date and comprises the fair value of the assets transferred, liabilities incurred to former owners of the acquiree and equity interests issued by the Group. Identifiable assets acquired and liabilities assumed are recognised at their acquisition-date fair values, except where IFRS requires a different measurement basis. Goodwill is measured as the excess of the aggregate of the consideration transferred, the amount of any non- controlling interest and, in a business combination achieved in stages, the fair value of the Group's previously held interest in the acquiree, over the net fair value of the identifiable assets acquired and liabilities assumed. Where the net fair value of the identifiable assets acquired and liabilities assumed exceeds the aggregate consideration transferred, the excess is recognised immediately in profit or loss as a bargain purchase gain. Earnings per share Basic earnings per share is calculated by dividing the profit attributable to the owners of Tungsten West PLC, excluding any costs of servicing equity other than ordinary shares, by the weighted average number of ordinary shares outstanding during the financial year, adjusted for bonuselements in ordinary shares issued during the financial year. Diluted earnings per share adjust the figures used in the determination of basic earnings per share to take into account the after income tax effect of interest and other financing costs associated with dilutive potential ordinary shares and the weighted average number of shares assumed to have been issued for no consideration in relation to dilutive potential ordinary shares. Potential ordinary shares are anti-dilutive when the Group reports a loss and are therefore excluded from the calculation of diluted loss per share. Revenue recognition Revenue comprises proceeds from the sale of tungsten and tin concentrate produced by the Group. The sale of concentrate represents a single performance obligation, which is satisfied at the point in time when control of the product transfers to the customer, typically on collection from site or on delivery, in accordance with the agreed
Page 9
shipping terms. Revenue is recognised at the transaction price, net of any applicable discounts, price adjustments, provisional pricing adjustments or selling fees. Cost of sales Cost of sales comprises all costs incurred in bringing tungsten and tin concentrate to its present location and condition and is recognised in the period in which the related revenue is recognised. Cost of sales includes: · Direct mining costs, including drilling, blasting, loading and hauling of ore; · Processing costs, including crushing, milling, gravity separation and other beneficiation costs incurred in converting ore to saleable concentrate; · Directly attributable labour costs, including on-site operational and supervisory salaries, wages and related on-costs; · Consumables, reagents and maintenance spares consumed in mining and processing; · Depreciation of mining and processing property, plant and equipment, on a units-of-production or straight-line basis as appropriate to the useful economic life of the asset; · Site utilities, including power and water directly consumed in production. In the prior year, the Group had not yet commenced production and generated no revenue. The costs recognised within cost of sales in that period represented the direct costs of maintaining the mine and processing facility in a state of readiness for production - principally care and maintenance of the site - which are of a comparable nature to, and precursor to, the direct production costs incurred once mining operations commenced. These costs were therefore presented on a consistent basis with the current year's cost of sales, notwithstanding the absence of revenue in that period. Taxation Income tax expense consists of the sum of current tax and deferred tax. Current tax is based on taxable profit for the year. Taxable profit differs from profit as reported for accounting purposes because of items of income or expense that are taxable or deductible in other years and items that are never taxable or deductible. Current tax is calculated using tax rates that have been enacted or substantively enacted by the end of the reporting period. A provision is recognised for tax matters that are uncertain if it is considered probable that there will be a future outflow of funds to a tax authority. The provision is measured at the best estimate of the amount expected to become payable. The assessment is based on the judgement of management supported by the advice of tax professionals contracted by the company. Deferred tax liabilities are generally recognised for all taxable temporary differences and deferred tax assets are recognised to the extent that it is probable that taxable profits will be available against which deductible temporary differences can be utilised. Such assets and liabilities are not recognised if the temporary difference arises from the initial recognition of goodwill or from the initial recognition (other than in a business combination) of other assets and liabilities in a transaction that affects neither the taxable profit nor the accounting profit. The carrying amount of deferred tax assets is reviewed at each reporting date and reduced to the extent that it is no longer probable that sufficient taxable profits will be available to allow all or part of the asset to be recovered. Deferred tax is calculated at the tax rates that are expected to apply in the period when the liability is settled or the asset is realised based on tax laws and rates that have been enacted or substantively enacted at the reporting date. The Group recognises research and development tax credits when management considers that the claim is substantially agreed and there is no material uncertainty regarding its recovery. Generally this is considered to be upon receipt of cash. Property, plant and equipment Land and buildings are stated at cost less any depreciation or impairment losses subsequently accumulated (cost model). Land and buildings have been uplifted to fair value on consolidation. Plant and equipment is stated in the statement of financial position at cost, less any subsequent accumulated depreciation and subsequent accumulated impairment losses. The asset under construction relates to costs incurred to upgrade the mineral processing facility and, in accordance with IAS 16, costs have been capitalised if it is probable that future economic benefits associated with the item will flow to the entity and the cost can be measured reliably. Depreciation on the mineral processing facility will be calculated using the units of production ("UOP") method, reflecting the pattern in which the economic benefits of the asset are consumed. Under this method, the depreciable amount of the asset is allocated based on the actual production achieved in the period as a proportion of the total estimated recoverable production over the asset's useful life, capped by the estimated life of the mine. Deprecation will commence when we have successfully commissioned the mineral processing facility. Estimated recoverable units are based on proved and probable ore reserves, adjusted for expected process recovery rates, and are reviewed at Property, plant and equipment (continued)
Page 10
least annually or when there is an indication of significant change (e.g. reserve restatement, mine plan revision, or a change in processing recovery assumptions). Changes are accounted for prospectively as a change in accounting estimate under IAS 8. Depreciation commences when the asset is available for use in the manner intended by management. i.e. when commissioning is complete and the plant is capable of operating at a level consistent with commercial production. Depreciation Depreciation is charged so as to write off the cost of assets, other than land and assets under construction over their estimated useful lives, as follows: Asset class Depreciation method and rate Land None Building 2% - 5% Straight Line Furniture, fittings and equipment 5% - 20% Straight Line Computer equipment 33% Straight Line Motor vehicles 33% Straight Line Other property, plant and equipment 5% - 33% Straight Line Mineral Processing Facility UOP Intangible assets Software is recognised as an intangible asset when it is probable that the expected future economic benefitsattributable to the asset will flow to the Group and the cost of the asset can be measured reliably. Software is initiallymeasured at cost, including directly attributable costs incurred in acquiring and preparing the asset for its intendeduse. Following initial recognition, software is carried at cost less accumulated amortisation and any accumulatedimpairment losses. Amortisation is recognised on a straight-line basis over the asset's estimated useful economiclife of three years, reflecting the pattern in which the asset's future economic benefits are expected to be consumed.Software is amortised on a straight-line basis using a rate of 33%. Mining Rights The mining rights are subject to amortisation over the useful life of the mine which is 27 years (2025: 27 years).Amortisation will be charged from the date the mine is brought into use. Following full commissioning of the MineralProcessing Facility, the mining rights will be reclassified to property, plant and equipment, on the basis that theythen form part of the broader mine asset from which future production is derived, and depletion will thereafter becharged on a units-of-production basis, consistent with the basis applied to depreciation of the Mineral ProcessingFacility. Research and development activities All research costs are expensed. Current and non-current classification Assets and liabilities are presented in the statement of financial position based on current and non-current classification. An asset is classified as current when: it is either expected to be realised or intended to be sold or consumed in the consolidated entity's normal operating cycle; it is held primarily for the purpose of trading; it is expected to be realised within 12 months after the reporting period; or the asset is cash or cash equivalent unless restricted from being exchanged or used to settle a liability for at least 12 months after the reporting period. All other assets are classified as non-current. A liability is classified as current when: it is either expected to be settled in the consolidated entity's normal operating cycle; it is held primarily for the purpose of trading; it is due to be settled within 12 months after the reporting period; or there is no right at the end of the reporting period to defer the settlement of the liability for at least 12 months after the reporting period. All other liabilities are classified as non-current. Deferred tax assets and liabilities are always classified as non-current. Cash and cash equivalents Cash and cash equivalents comprise cash on hand and call deposits, and other short-term highly liquid investmentsthat are readily convertible to a known amount of cash and are subject to an insignificant risk of changes in value.
Page 11
Trade receivables Trade and other receivables where payment is due within one year do not constitute a financing transaction and arerecorded at the undiscounted amount expected to be received, less attributable transaction costs. Any subsequentimpairment is recognised as an expense in profit or loss. All trade and other receivables are subsequently measured at amortised cost, net of impairment. Trade payables Trade and other payables are initially recognised at fair value less attributable transaction costs. They aresubsequently measured at amortised cost. Convertible debt Convertible loan notes issued by the Group are assessed at the date of issuance to determine whether they contain liability and/or equity components in accordance with IAS 32 Financial Instruments: Presentation. Where the convertible loan notes' conversion feature does not meet the IAS 32 "fixed-for-fixed" test (variable conversion price, capped share allocation), the instrument is classified in full as a financial liability, with no separate equity component. The convertible loan notes are designated at fair value through profit or loss (FVTPL) on initial recognition, avoiding separate bifurcation of the embedded conversion derivative. Fair value movements are recognised in profit or loss at each reporting date. Fair value is estimated using a probability-weighted scenario model rather than an option-pricing model, as the conversion terms mean the payoff is not dependent on future share price movements. Two outcomes are modelled: conversion into equity, and cash redemption at maturity. Expected cash flows under each scenario are probability- weighted using Management's best estimate (based on financing and operational milestones) and discounted using a rate benchmarked to the internal rate of return implicit at issuance, itself derived using this same probability- weighted approach applied to the cash proceeds received. At each reporting date the same approach is reapplied over the shorter remaining period to maturity. Immediately before conversion, the conversion probability is updated to 100% and the discount period is shortened to the actual date of conversion. On conversion, the convertible loan note liability is derecognised. The consideration for derecognition is measuredas the fair value of the ordinary shares issued, determined by reference to the quoted market price of the Group'sshares at the conversion date. Any difference between the carrying value of the liability immediately beforeconversion and the fair value of shares issued is recognised as a gain or loss in profit or loss. This gain or lossprincipally reflects movement in the Group's quoted share price between the date the fair value model's conversionassumptions were set and the actual conversion date, rather than a change in the substantive terms of theinstrument. Provisions A provision is recognised when the Group has a present legal or constructive obligation as a result of a past event, it is probable that settlement will be required, and a reliable estimate can be made of the amount. Provisions are measured at the Directors' best estimate of the expenditure required to settle the obligation at the reporting date, discounted to present value where the effect is material. The Group recognises a provision for restoring and rehabilitating areas disturbed by its mining activities on a full life-of-mine basis, recognised when the disturbance giving rise to the obligation occurs. As the provision is measured on this basis at each reporting date, its balance moves principally through the unwinding of the discount and changes in the discount rate and inflation assumptions applied to an otherwise unchanged cost estimate; no corresponding restoration asset is recognised (see note 26 and note 37). The underlying cost estimate is only expected to change where there is a genuine change in the scope of restoration required - for example, disturbance beyond that currently approved and estimated, a regulatory change in restoration requirements, or a cost category not contemplated in the original estimate. Management does not expect such a change in the near term, but recognises this may arise if the Group expands operations or exercises options beyond the currently approved plan. The current mine life is 11 years, based on the mining permits currently held. Should the scope of restoration change, the corresponding cost would be capitalised within mining assets from the point the change is approved and depreciated over the mine's useful life as assessed at that time; useful life is reviewed at each reporting date and revised prospectively where a change in the approved mining plan, resource base, or permitted life extends or shortens it beyond the current 11-year estimate. The unwinding of the discount is recognised as a finance cost. Expenditure incurred is charged against the provision when it is incurred.
Page 12
Leases At the inception of a contract, the Group assesses whether the contract is, or contains, a lease. A contract contains a lease if it conveys the right to control the use of an identified asset for a period of time in exchange for consideration. The Group assesses whether it has the right to obtain substantially all of the economic benefits from use of the identified asset and the right to direct its use throughout the period of use. As a lessee, the Group recognises a lease liability and a corresponding right-of-use asset at the lease commencement date, except for short-term leases and leases of low-value assets, for which the recognition exemptions available under IFRS 16 are applied. The lease liability is initially measured at the present value of lease payments to be made over the lease term that are not paid at the commencement date. Lease payments included in the measurement of the lease liability comprise: · fixed lease payments, less any lease incentives receivable; · variable lease payments that depend on an index or rate; · amounts expected to be payable under residual value guarantees; · the exercise price of purchase options where the Group is reasonably certain to exercise such options; and · payments of penalties for terminating the lease, where the lease term reflects the exercise of a termination option. Lease payments are discounted using the interest rate implicit in the lease where that rate can be readily determined. Where this is not readily determinable, the Group applies its incremental borrowing rate, being the rate of interest that it would have to pay to borrow, over a similar term and with similar security, the funds necessary to obtain an asset of similar value in a similar economic environment. Subsequently, the lease liability is measured at amortised cost using the effective interest method. The carrying amount is increased to reflect interest accrued on the lease liability and reduced for lease payments made. The lease liability is remeasured when there is a change in future lease payments, a reassessment of a lease term, or a lease modification. Right-of-use assets primarily comprise the lease relating to the Hemerdon Mine together with other property leases. Right-of-use assets are initially measured at cost, comprising: · the amount of the initial lease liability; · lease payments made at or before the commencement date less any lease incentives received; · initial direct costs incurred in obtaining the lease; and · an estimate of costs to dismantle, remove or restore the underlying asset or site on which it is located, where applicable. Subsequently, right-of-use assets are measured at cost less accumulated depreciation and impairment losses and adjusted for certain remeasurements of the associated lease liabilities. Right-of-use assets are depreciated on a straight-line basis from the commencement date over the shorter of the lease term and the useful life of the underlying asset. Where ownership of the underlying asset transfers to the Group at the end of the lease term, or the cost of the right-of-use asset reflects that a purchase option will be exercised, depreciation is charged over the useful life of the underlying asset. The Group reviews right-of-use assets for impairment whenever events or changes in circumstances indicate that their carrying amount may not be recoverable. Payments associated with short-term leases and leases of low-value assets are recognised as an expense in profitor loss on a straight-line basis over the lease term. Inventories Inventories are stated at the lower of cost and net realisable value on a 'first in first out' basis. Cost comprises direct materials and delivery costs, direct labour, import duties and other taxes, an appropriate proportion of variable and fixed overhead expenditure based on normal operating capacity, and, where applicable, transfers from cash flow hedging reserves in equity. Costs of purchased inventory are determined after deducting rebates and discounts received or receivable. Cost is determined on the following basis: (a) Metal concentrate on hand is valued on an average total production cost method (b) Ore stockpiles are valued at the average cost of mining and stockpiling the ore, including haulage (c) A proportion of related depreciation and amortisation charge is included in the cost of inventory Stock in transit is stated at the lower of cost and net realisable value. Cost comprises of purchase and delivery costs, net of rebates and discounts received or receivable. Net realisable value is the estimated selling price in the ordinary course of business less the estimated costs of completion and the estimatedcosts necessary to make the sale. Impairment of non-current assets Property, plant and equipment is assessed for impairment under IAS 36 at each reporting date, or when indicators of impairment exist. For this purpose, assets are grouped into cash-generating units (CGUs), being the smallest group of assets generating largely independent cash inflows.The Group has determined that the Hemerdon Mine, comprising the mining operations and mineral processing facility, is managed and generates cash flows as a single CGU, as mined ore has no realisable value independent of processing through the mineral processing facility.
Page 13
Where an indicator of impairment is identified, the recoverable amount of the CGU (the higher of fair value less costs of disposal and value in use) is compared to its carrying amount, with any shortfall recognised in profit or loss. Share capital Ordinary Shares are classified as equity. Equity instruments are measured at the fair value of the cash or other resources received or receivable, net of the direct costs of issuing the equity instruments. If payment is deferred and the time value of money is material, the initial measurement is on a present value basis. Share options Share options granted to shareholders classified as equity instruments are accounted for at the fair value of cash received or receivable. Share options granted to shareholders which represent a future obligation for the Company outside of its control are recognised as a financial liability at fair value through profit and loss. Share options granted to employees are fair valued at the date of grant with the cost recognised over the vesting period. If the employee is employed in a subsidiary company, the cost is added to the investment value, in the financial statements of the parent, and the expense recognised in staff costs in the statements of the subsidiary. Warrants issued in return for a service are classified as equity instruments and measured at the fair value of the service received. Where the service received relates to the issue of shares the cost is debited against the proceeds received in share premium. Defined contribution pension obligation A defined contribution plan is a pension plan under which pension contributions are paid into a separate entity and the group has no legal or constructive obligations to pay further contributions if the fund does not hold sufficient assets to pay all employees the benefits relating to employee service in the current and prior periods. For defined contribution plans contributions are paid into publicly or privately administered pension insurance plans on a mandatory or contractual basis. The contributions are recognised as employee benefit expense when they are due. If contribution payments exceed the contribution due for service, the excess is recognised as an asset. Financial instruments Initial recognition Financial assets and financial liabilities comprise all assets and liabilities reflected in the statement of financial position, although excluding property, plant and equipment, intangible assets, right of use assets, inventories, deferred tax assets, prepayments, deferred tax liabilities and the mining restoration provision. The Group recognises financial assets and financial liabilities in the statement of financial position when, and only when, the Group becomes party to the contractual provisions of the financial instrument. Financial assets are initially recognised at fair value. For financial assets not measured at fair value through profit or loss, transaction costs that are directly attributable to the acquisition of the financial asset are added to the fair value on initial recognition. Financial liabilities are initially recognised at fair value. For financial liabilities not measured at fair value through profit or loss, directly attributable transaction costs are deducted from the fair value of the liability on initial recognition. Subsequent to initial measurement, financial assets and financial liabilities are measured at either amortised cost or fair value (either through other comprehensive income or through profit or loss). Derecognition Financial assets The Group derecognises a financial asset when: • the contractual rights to the cash flows from the financial asset expire; • it transfers the right to receive the contractual cash flows in a transaction in which substantially all of the risks and rewards of ownership of the financial asset are transferred; or • the Group neither transfers nor retains substantially all of the risks and rewards of ownership and it does not retain control of the financial asset. On derecognition of a financial asset, the difference between the carrying amount of the asset and the sum of the consideration received is recognised as a gain or loss in the profit or loss. Financial liabilities The Group derecognises a financial liability when its contractual obligations are discharged, cancelled, or expire. Significant accounting estimates and judgements The preparation of the financial statements requires management to make estimates and judgements that affect the reported amounts of certain financial assets, liabilities, income and expenses.
Page 14
The use of estimates and judgements is principally limited to the determination of provisions for impairment and the valuation of financial instruments as explained in more detail below: Significant accounting judgements Impairment of non-current assets Cash-generating units ("CGUs") are defined in the accounting policies note, with the Hemerdon Mine, comprising the mining operations and mineral processing facility, determined to be a single CGU (see note 2). Management makes regular checks on internal and external impairment indicators in respect of the Company's investment in subsidiary undertakings, mining rights and properties. During the year ended 31 March 2026 and as of the date of this report, management did not identify any internal or external indicators triggering a detailed impairment review. The group commenced phased commissioning at the Hemerdon Mine in August 2026, in line with management's phased restart plan, and the Group secured the funding required to complete its remaining project capital expenditure through the National Wealth Fund agreement entered into following the year end. Management is confident that the carrying amount of the Company's investment in subsidiaries continues to be fully recoverable, with no impairment of any assets being deemed necessary. Founder options The Directors consider the non-EMI portion of the founder options meet the definition of equity in the financialstatements of the Group on the basis that the 'fixed for fixed' condition is met and that they were awarded toshareholders relating to investing in the share capital of the Group. The accounting treatment has been applied inaccordance with IAS 32, which requires initial recognition at fair value of consideration paid less costs. As there wasno consideration received at inception, the value of the options is £nil. When exercised the shares are recognised atoption price. Please see note 30. Key sources of estimation uncertainty Restoration provision The restoration provision is the contractual obligation to restore the mining site back to its original state once mining ceases. The provision represents the expected outflows required to settle that obligation, discounted to present value. As restoration work will predominantly be completed towards the end of the mine's useful life, the calculation is subject to a high degree of estimation uncertainty. The key assumptions that would lead to significant changes in the provision are the discount rate, the timing of restoration relative to the term of the Mineral Lease, and the estimated restoration cost (see note 26). A 1% change in the discount rate applied to the Group's restoration estimate would result in an impact of £1.5 million to £2.0 million(2025: £1.5 million to £2.0 million) on the restoration provision. A 5% change in the estimated restoration cost would result in an impactof £0.4 million (2025: £0.3 million) on the provision for restoration. More information on the restoration provision is disclosed in note 26. Convertible loan notes During the year, the convertible loan notes converted into equity shares. Immediately prior to conversion, the instrument was remeasured to fair value, with the conversion scenario weighted at 100% probability and the discount period shortened to the actual conversion date. The resulting shares were recognised in equity at fair value, determined by reference to the Company's quoted share price at the conversion date. As the notes have now converted, no liability remains at the balance sheet date and there is no ongoing estimation uncertainty associated with future settlement. Prior to conversion, the notes were measured at fair value at each reporting date, with fair value calculated using ascenario pricing model. Management commissioned an external expert to calculate the fair value at the prior yearend, with key assumptions being the probabilities assessed for each underlying scenario, the discount rateselected, and the expected dates of conversion or redemption. Discount rates The Group has had to assess reasonable discount rates based on market factors to use under IFRS. These discount rates have been used on the value in use model, right-of-use assets and the restoration provision. The discount rate on the right-of-use asset is the rate for an equivalent debt instrument. The restoration provision is discounted at the risk-free rate, being the yield on an equivalent maturity UK government bond matched to the expected date of restoration expenditure. Inflation on the underlying cost estimate is derived independently, using the difference between nominal and index-linked government bond yields at the same date, rather than being included as a separate risk premium. No further risk premium has been added to the discount rate, on the basis the original contingency allowance included within the cost estimate is considered to address the specific risks associated with this liability.
Page 15
The discount rate applied to the value in use model reflects current market assessments of the time value of money and the risks specific to the Hemerdon Mine CGU that are not already reflected in the cash flow forecasts, being a post-tax discount rate derived by reference to a market participant's weighted average cost of capital. 3 Financial risk management Group This note presents information about the Group's exposure to financial risks and the Group's management of capital. Credit risk In order to minimise credit risk, the Group has adopted a policy of only dealing with creditworthy counterparties (banks and debtors) and it obtains sufficient collateral, where appropriate, to mitigate the risk of financial loss from defaults. The most significant credit risk relates to customers that may default in making payments for goods they have purchased. To date the Group has only made a small number of sales and therefore the credit risk exposure has been low. Liquidity risk The Directors regularly monitor forecast and actual cash flows and to match the maturity profiles of financial assets and liabilities to ensure proper liquidity risk management for the day-to-day working capital requirements. In the view of the Directors, the key risk to liquidity, in the medium term, is raising the additional capital required to meet its estimated Capex spend. The Group's continued future operations depend on the ability to raise sufficient capital through the issue of debt. At present the Group does not have sufficient capital to fund its estimated Capex spend therefore there is a liquidity risk which would result in the Group having to pause its future operations were it to not raise the necessary capital. At present, the Group is in discussions with financing partners to provide this additional capital. In the short term the key risk is raising sufficient finance to fund the operational costs of the business. Market risk Interest rate risk The Group is exposed to interest rate risk through the impact of rate changes on interest-bearing borrowings. The interest rates and terms of repayment are disclosed in note 23 to the financial statements. The Company's policy is to obtain the most favorable interest rates available for all liabilities. Except as outlined above, the Group has no significant interest-bearing assets and liabilities. Foreign exchange risk The Group in the future will also be exposed to exchange rate risk on the basis that tungsten prices are principally denominated in US Dollar. The Group will seek to manage this risk through the supply contracts it agrees with future customers. The Group does not use any derivative instruments to reduce its economic exposure to changes in interest rates or foreign currency exchange rates at the current time. Price risk The Group is exposed to the price fluctuation of its primary products being tungsten and tin. Given the Group is currently in the development phase and is not yet producing any revenue, the costs of managing exposure to commodity price risk exceed any potential benefits. The Directors monitor this risk on an ongoing basis and will review this as the Group moves towards production. Inflation risk The Group is exposed to inflationary pressures that impact the core materials required for the operations, mainly being reagents, power and diesel costs. The Directors monitor this risk on an ongoing basis and will review this as the group moves towards production.
Page 16
4 Operating segments The Chief Economic Decision Maker of the Group is the Board of Directors which considers that the Group is comprised of one operating segment representing the Group's mining activities at the Hemerdon Mine. All operations and assets are located in the United Kingdom and all revenues are originated in the United Kingdom. Revenue from customers accounting for 10% or more of Group revenue was as follows: 2026£ 2025£ Customer A 601,550 - 5 Revenue from contracts with customers The analysis of the Group's revenue for the year from continuing operations is as follows: 2026£ 2025£ Tungsten 601,550 - Sale of goods 601,550 - 6 Other income The analysis of the Group's other operating income for the year is as follows: 2026£ 2025£ Sale of scrap metal - 3,600 Sublease rental income - 2,635 Other contract income 420,000 - 420,000 6,235 Other contract income of £420,000 (2025: £nil) was received during the year. The income represents consideration received under an agreement in connection with a contractor's mobilisation on site and the associated transfer of a crusher. The related gain on disposal of the crusher is presented separately within other gains and losses on disposal of assets. See note 6. 7 Other gains and losses The analysis of the Group's other gains and losses for the year is as follows: 2026 £ 2025 £ Impairment on assets under construction (property, plant andequipment) - (9,506,522) Gains on disposal of assets 35,000 - Other gains and losses 35,000 (9,506,522) 8 Operating loss Arrived at after charging/(crediting) 2026£ 2025£ Depreciation of property, plant and equipment 204,290 318,725 Depreciation of right-of-use assets 114,743 76,489 Loss on disposal of right-of-use asset - 79,712 (Gain)/Loss on disposal of tangible fixed assets (35,000) 5,181 Impairment of asset under construction assets and deposits - 9,506,522
Page 17
Amortisation of intangibles 55,910 74,822 Staff costs 2,587,137 2,481,436 9 Finance income and costs 2026£ 2025£ Finance income on financial instruments measured atamortised cost: Notional interest income on the escrow funds receivable 278,185 893,845 Other interest income 18,846 4,350 297,031 898,195 Finance costs on financial instruments measured atamortised cost: Interest expense on other financing liabilities (107,849) (111,491) Interest expense on bridging loan (150,000) - Notional cost on the restoration provision (359,363) (365,456) Bank charges (5,155) (5,766) Foreign exchange losses (25,746) (12,734) Finance costs on financial instruments measured at fairvalue through profit or loss: Fair value movement in convertible loan notes designated fairvalue through profit and loss (167,324,341) (6,346,879) Total finance costs (167,972,454) (6,842,326) Net finance costs (167,675,423) (5,944,131) 10 Staff costs The aggregate payroll costs (including Directors' remuneration) were as follows: 2026£ 2025£ Wages and salaries 2,280,452 2,074,586 Social security costs 312,649 253,935 Pension costs, defined contribution scheme 86,563 92,332 Share based payment - 63,248 Forfeiture of share options (92,527) - 2,587,137 2,484,101 The average number of persons employed by the Group (including Directors) during the year, analysed by category, was as follows: 2026No. 2025No. Project, maintenance, administration and support 32 26 Directors 9 6 41 32 11 Directors' remuneration The Directors' remuneration for the year was as follows: 2026£ 2025£ Remuneration 770,949 705,726 Pension contribution 22,729 22,541 Benefits in kind - 1,489
Page 18
Total cash remuneration 793,678 729,756 Total remuneration 793,678 729,756 Included in the remuneration above was £nil (2025: £nil) paid in shares rather than cash. Remuneration by each Director is as follows: 2026Salary£ 2026Pension£ 2026Total£ Richard Maxey 29,333 - 29,333 Alistair Stobie 89,425 3,646 93,071 David Cather 29,333 - 29,333 Martin Wood 32,666 - 32,666 Kevin Ross 29,333 - 29,333 Jeffery Court** 350,000 17,500 367,500 Guy Edwards 65,333 - 65,333 Philip Povey 65,526 1,583 67,109 Stephen Harrison 80,000 - 80,000 770,949 22,729 793,678 ** Denotes the highest paid Director. Alistair Stobie and Philip Povey were only partly employed as a director during the year. All directors salaries represent short term employment benefits whilst pension represents long term. There were no share option costs during the year attributable to the directors. Directors' interests in share options and warrants are disclosed in the Directors' Report. Please see page 26. 2025Salary£ 2025Pension£ 2025Benefits£ 2025Total£ Richard M Maxey 24,000 - - 24,000 Alistair Stobie 175 916 8,046 - 183,962 David Cather 45,000 - - 45,000 Martin Wood 29,000 - - 29,000 Kevin Ross 24,000 - - 24,000 Jeffery Court 171,410 4,375 - 175,785 Neil Gawthorpe** 202,400 10,120 1,489 214,009 Guy Edwards 24,000 - - 24,000 Stephen Harrison 10,000 - - 10,000 705,726 22,541 1,489 729,756 ** Denotes the highest paid Director. Directors' interests in share options and warrants are disclosed in the Directors' Report. 12 Auditors' remuneration 2026£ 2025£ Audit of these financial statements (predecessor auditor) - 71,000 Audit of these financial statements (current auditor) 130,000 - Other fees to auditors Audit of subsidiary financial statements and other assuranceservices (previous auditor) - 82,900 Total Auditors' Remuneration 130,000 153,900 13 Income tax Tax charged/(credited) in the income statement:
Page 19
2026£ 2025£ Current taxation Adjustments in respect of prior periods (134,470) (264,572) The tax on profit for the year is higher (2025: higher) than the standard rate of corporation tax in the UK of 25% (2025: 25%). The differences are reconciled below: 2026£ 2025£ Loss before tax (175,580,741) (24,957,585) Corporation tax at standard rate (43,895,185) (6,239,396) Fixed asset differences (10,178) 2,433,186 Increase from effect of expenses not deductible indetermining taxable profit (tax loss) 42,159,453 1,663,040 Other differences (27,355) 750 Surrender of tax losses for R&D tax credit refund (107,416) (264,572) Adjustments in respect of prior periods (deferred tax) 7,744 - Decrease/(increase) from tax losses for which no deferredtax asset was recognised 1,738,467 2,142,420 Total tax credit (134,470) (264,572) Deferred tax Group 2026Intangibles£ 2026Tangibles£ 2026Losses£ 2026Total£ At 1 April 2025restated* - 406,931 (406,931) - Charged to profitand loss - - - - At 31 March 2026 - 406,931 (406,931) - The net deferred tax of £nil is made up of a liability of £406,930 and asset of £406,930. The unrecognised deferred tax asset for carried forward losses at 31 March 2026 was £12,590,909 The rate used for the deferred tax is 25% (2025: 25%). 2025Intangibles£ 2025Tangibles£ 2025Losses£ 2025Total£ At 1 April 2024restated* - 421,818 (421,818) - Charged to profitand loss - (14,887) 14,887 - At 31 March 2025restated* - 406,931 (406,931) - The net deferred tax of £nil is made up of a liability of £406,930 and asset of £406,930. The unrecognised deferred tax asset for carried forward losses at 31 March 2025 was £10,281,434. The Group has assessed the potential impact of the OECD Pillar Two global minimum tax rules and the legislation enacted in the jurisdictions in which it operates. Based on this assessment, the Group does not expect Pillar Two legislation to have a material impact on its financial position, results of operations or cash flows. The Group has
Page 20
applied the temporary mandatory exception under IAS 12 from recognising and disclosing deferred tax assets and liabilities related to Pillar Two income taxes. *For details of restatement please refer to note 37. 14 Earnings per share Basic and diluted loss per share is calculated as follows: 2026£ 2025£ Restated* Loss for the year (175,446,271) (24,693,013) Weighted average number of shares in issue 1,504,748,756 188,731,307 Basic and diluted loss per share (0.12) (0.13) The diluted loss per share calculations exclude the effects of share options, warrants and convertible debt on the basis that such future potential share transactions are anti-dilutive. Information on share options and warrants is disclosed in note 30. *For details of restatement please refer to note 37. 15 Property, plant and equipment See note 2 for accounting policy on property, plant and equipment. Group Land andbuildings£ Furniture,fittings andequipment£ Computerequipment£ Motorvehicles£ Otherproperty,plant andequipment£ Asset underconstruction£ Total£ Cost or valuation At 1 April 2024 5,189,361 114,762 312,363 141,500 251,181 16,411,032 22,420,199 Additions - - - - - 19,885 19,885 Disposal - - (23,478) - - - (23,478) At 31 March 2025 5,189,361 114,762 288,885 141,500 251,181 16,430,917 22,416,606 Additions - 1,021 28,068 - - 5,604,626 5,633,715 Disposal - - - - - (245,000) (245,000) At 31 March 2026 5,189,361 115,783 316,953 141,500 251,181 21,790,543 27,805,321 Depreciation At 1 April 2024 445,117 35,298 183,574 82,130 140,931 2,266,870 3,153,920 Charge for the year 105,428 22,951 89,376 46,695 54,275 - 318,725 Disposal - - (18,297) - - - (18,297) Impairment - - - - - 9,506,522 9,506,522 At 31 March 2025 550,545 58,249 254,653 128,825 195,206 11,773,392 12,960,870 Charge for the year 105,429 22,675 34,753 12,675 28,758 - 204,290 At 31 March 2026 655,974 80,924 289,406 141,500 223,964 11,773,392 13,165,160 Carrying amount At 31 March 2026 4,533,387 34,859 27,547 - 27,217 10,017,151 14,640,161 At 31 March 2025 4,638,816 56,513 34,232 12,675 55,975 4,657,525 9,455,736 At 31 March 2024 4,744,244 79,464 128,789 59,370 110,250 14,144,162 19,266,279 Impairment - Asset under construction The amount of impairment loss included in profit and loss is £nil (2025: £9,506,522). The Group has previously capitalised all costs to Asset Under Construction that relate to the ongoing project to upgrade the processing plant and mine site. The impairment in 2025 principally related to consulting and design work for a new front-end crushing circuit undertaken in 2021/2022 and 2022/2023 which will not now be implemented.
Page 21
16 Right-of-use assets Property£ Total£ Cost or valuation At 1 April 2024 2,334,763 2,334,763 Additions 165,324 165,324 Write off (79,712) (79,712) At 31 March 2025 2,420,375 2,420,375 At 31 March 2026 2,420,375 2,420,375 Depreciation At 1 April 2024 439,179 439,179 Charge for the year 76,489 76,489 Write off (79,713) (79,713) At 31 March 2025 435,955 435,955 Charge for the year 114,743 114,743 At 31 March 2026 550,699 550,699 Carrying amount At 31 March 2026 1,869,677 1,869,677 At 31 March 2025 1,984,419 1,984,419 Depreciation on right-of-use assets charged through the profit and loss totals £114,742 (2025: £76,489). Interest expense on lease liabilities charged through the profit and loss totals £107,849 (2025: £111,491). Certain assets held under right-of-use leases are secured by charges held in favour of Hargreaves (UK) Services Limited or the Trustees of Newnham Estate Trust. 17 Intangible assets Group Software£ Total£ Cost At 1 April 2024 (restated*) 231,474 231,474 Additions 750 750 At 31 March 2025 (restated*) 232,224 232,224 At 31 March 2026 232,224 232,224 Amortisation At 1 April 2024 92,642 92,642 Amortisation charged to the profit and loss 74,822 74,822 At 31 March 2025 167,464 167,464 Amortisation charged to the profit and loss 55,910 55,910 At 31 March 2026 223,374 223,374 Carrying amount At 31 March 2026 8,850 8,850 At 31 March 2025 (restated*) 64,760 64,760 At 31 March 2024 (restated*) 138,832 138,832 Software amortisation of £55,910 (2025: £74,822) has been charged to the profit and loss presented in administrative expenses. 18 Mining rights assets Group Mining rights£ Total£ Cost & carrying amount
Page 22
At 1 April 2024 (restated*) 4,189,431 4,189,431 Additions - - Decrease in restoration provisioncapitalised against mining rights (1,882,716) (1,882,716) At 31 March 2025 (restated*) 2,306,715 2,306,715 Increase in restoration provisioncapitalised against mining rights (33,931) (33,931) At 31 March 2026 2,272,784 2,272,784 The mining rights will begin to be amortised on a units-of-production basis over proved and probable reserves once mining operations restart. Following full commissioning of the Mineral Processing Facility, the mining rights will be reclassified from intangible assets to property, plant and equipment, on the basis that they then form part of the broader mine asset from which future production is derived. See note 2 for more details. Recoverability of Mining Assets Management makes regular checks on internal and external impairment indicators. During the year ended 31 March 2026 and as of this report date, Management did not note any internal or external indicators triggering a detailed impairment review. Management is confident on the carrying amounts of its subsidiaries being fully recoverable, with no impairment of any assets being deemed necessary. *For details of restatement please refer to note 37. 19 Investments Group subsidiaries Details of the Group subsidiaries as at 31 March 2026 are as follows: Proportion of ownershipinterest and voting rights held Name of subsidiary Principal activity Registered office 2026 2025 DrakelandsRestoration Limited* Company number11854467 Mining of tungstenand tin Hemerdon Mine.Drakelands,Plympton, DevonUnited KingdomPL7 5BSEngland and Wales 100% 100% Tungsten WestServices Limited** Company number12430582 Provisionof services to theGroup Hemerdon Mine.Drakelands,Plympton, DevonUnited KingdomPL7 5BSEngland and Wales 100% 100% Aggregates WestLimited** Company number12575686 Sales ofaggregates Hemerdon Mine.Drakelands,Plympton, DevonUnited KingdomPL7 5BSEngland and Wales 100% 100% * Indicates direct investment of Tungsten West plc in the subsidiary. ** Tungsten West Services Limited and Aggregates West Limited are exempt from the Companies Act 2006 requirements relating to the audit of their individual accounts by virtue of Section 479A of the Act as Tungsten West plc has guaranteed the subsidiary company under Section 479C of the Act. 20 Escrow Cash 31 March2026£ 31 March2025£ Restated* Non-current financial assets Escrow Cash (held in escrow) 14,912,042 14,633,857
Page 23
The Group holds funds with an escrow agent held on trust in connection with the Group's restoration obligations in respect of the Hemerdon Mine. The funds are held partly in a fixed-term deposit account and partly in a current account and are not available for the Group's general corporate use. The escrow balance is recognised as a financial asset under IFRS 9 and is measured at amortised cost, being the cash balance held by the escrow agent plus accrued interest income. As the balance represents actual cash deposits held on the Group's behalf rather than a long-term receivable subject to significant discounting, no separate discount unwind is recognised. Interest income is recognised as it accrues on the underlying deposit. 21 Trade and other receivables 31 March2026£ 31 March2025£ Trade receivables 346 5,074 Deposits 10,642,212 2,765,284 Prepayments 107,340 145,317 Other receivables 1,824,508 71,197 12,574,406 2,986,872 The increase in deposits and other receivables during the year primarily reflects deposits paid against capital expenditure purchase orders placed in connection with the plant rebuild, together with a corresponding increase in VAT recoverable as a result of the increased level of capital spend. The average credit period on sales of goods is 30 days (2025: 30 days). No interest is charged on outstanding trade receivables. The carrying amount of trade and other receivables approximates the fair value. As the Group is in the early phases of operation and making a few minor sales, expected credit losses are being considered on a customer-by-customer basis. At the year-end, trade receivables include a provision of £66,751 (2025: £66,751). 22 Cash and cash equivalents 31 March2026£ 31 March2025£ Cash at bank 25,485,511 18,442 23 Inventories 31 March2026£ 31 March2025£ Inventories 29,850 29,850 24 Trade and other payables 31 March2026£ 31 March2025£ Trade payables 1,861,191 1,177,693 Accrued expenses 2,616,051 1,089,820 Social security and other taxes 155,255 284,625 Outstanding defined contribution pension costs 15,845 17,744 Other payables - 167 4,648,342 2,570,049 Trade payables and accruals comprise amounts outstanding for trade purchases and ongoing costs. The average credit period for trade purchases is 45 days (2025: 45 days). No interest is charged on overdue amounts. The carrying amount of trade and other payables approximates the fair value.
Page 24
25 Loans and borrowings 31 March2026£ 31 March2025£ Non-current loans and borrowings Lease liabilities 1,742,223 1,863,807 Hire purchase - 6,559 Total Non-current loans and borrowings 1,742,223 1,870,366 31 March2026£ 31 March2025£ Current loans and borrowings Lease liabilities 79,477 62,387 Hire purchase 25,250 25,088 Convertible loan notes - 24,683,100 Total Current loans and borrowings 104,727 24,770,575 Lease liabilities 2026Future lease payments£ 2026Discount£ 2026Lease liability£ Within one year 184,309 (104,832) 79,477 In two to five years 405,080 (295,509) 109,571 In over five years 3,329,803 (1,697,151) 1,632,652 3,919,193 (2,097,493) 1,821,700 2025Future lease payments£ 2025Discount£ 2025Lease liability£ Within one year 163,664 (101,277) 62,387 In two to five years 459,003 (276,523) 182,480 In over five years 2,908,135 (1,226,808) 1,681,327 3,530,802 (1,604,608) 1,926,194 2026£ 2025£ Opening lease liability as at 1 April 1,926,194 1,852,083 Revaluation - 165,324 Interest charged in statement of comprehensive income 101,747 107,066 Lease payments (206,241) (198,279) Closing lease liability as at 31 March 1,821,700 1,926,194 The lease liabilities are presented as follows: 31 March2026£ 31 March2025£ Current liabilities 79,477 62,387 Non-current liabilities 1,742,223 1,863,807 1,821,700 1,926,194
Page 25
Convertible loan notes Throughout the last three financial years the Group has issued 8 tranches of Convertible Loan Notes with a nominal value of £22,312,043 of which £5,205,000 was issued in the current year. The notes bore interest at 20% per annum and were secured by a charge over certain assets of the Group held by the security agent, Kroll Trustee Services Limited. During July 2023 the Group notified Lansdowne Partners, the majority holder, of multiple breaches of the terms of the loan, arising from measures taken by management to conserve cash flow to match available sources of finance. The note holders agreed successive waivers of these breaches. On 31 December 2025, the Company completed a partial conversion of the Notes at a price of 3 pence per ordinary share, issuing 584,831,728 new Ordinary Shares to noteholders. Any conversion that would have triggered an obligation under Rule 9 of the City Code on Takeovers and Mergers was restricted: Lansdowne Partners and the two key members of the Drakewood Concert Party were capped such that each held approximately 29.90% of the Company's issued share capital immediately following the conversion, with a Rule 9 waiver not being available in the circumstances. The remaining £12.9 million of Notes held by these parties (including accrued interest, held by Lansdowne, Drakewood Investments Limited and Henry Maxey) was instead converted into 490,402,989 non-voting B-Shares, following shareholder approval of this new class of capital, extinguishing the Notes in full. See note 28 for details of B-shares. As the instrument was designated as a single instrument at fair value through profit or loss, comprising a host liability and an embedded derivative option, the liability continued to be fair valued through profit or loss up to the date of conversion. On conversion, the liability was derecognised and equity recognised at the same fair value, such that no separate gain or loss arose on conversion itself, distinct from the fair value movements recognised in the period up to that date. Movement in liability 31 March2026£ 31 March2025£ Brought forward 24,683,100 11,587,221 Cash received (Convertible Loan Notes) 5,205,000 6,751,000 Fair value movement in year 167,324,341 6,346,879 Conversion (197,212,441) (2,000) Carried forward - 24,683,100 The fair value movement of £167,324,341 (2025: £6,346,879) in the year principally reflects the remeasurement of the Notes to fair value immediately prior to conversion, with the conversion scenario weighted at 100% probability, the discount period shortened to the actual conversion date, and fair value determined by reference to the Company's quoted share price at the conversion date. On conversion, the liabilityof £197,212,441 (2025: £2,000) was derecognised and equity recognised at the same fair value, such that no separate gain or loss arose on conversion itself, distinct from the fair value movements recognised in the period up to that date. Bridge Facility In order to provide sufficient working capital to secure the Project Financing commitments and continue to progress the Project's development, the Company agreed a bridge loan facility of up to £4.0 million with Lansdowne Partners (UK) Ltd, Drakewood Investments Limited and Henry Maxey, being the three largest noteholders (or affiliated entities) and, as such, related parties of the Company. The facility was unsecured and accrued interest at 15% per annum, capitalising monthly (increasing by 2% in the event of default), and wasrepayable on the earlier of six months from drawdown or completion of any debt or equity raise equal to or greater than the facility balance, with any smaller equity raise applied as a prepayment. The facility was available in two tranches of £2.0 million each, the first available immediately and the second from 31 January 2026 subject to conditions including completion of the Conversion process of the Notes. The Company drew down only the first tranche of £2.0 million ("Tranche 1"), which was used to fund project restart costs included within theFeasibility Study. Tranche 1, together with accrued interest, was repaid from the net proceeds of the fundraise. 26 Provisions Group Restoration provision£ Total£ At 1 April 2025 (restated*) 6,703,821 6,703,821 Change in inflation and discount rate (33,931) (33,931) Increase due to passage of time or unwinding of discount 359,363 359,363 At 31 March 2026 7,029,253 7,029,253 Non-current liabilities 7,029,253 7,029,253
Page 26
Restoration provision£ Total£ At 1 April 2024 (restated*) 8,221,081 8,221,081 Change in inflation and discount rate (1,882,716) (1,882,716) Increase due to passage of time or unwinding of discount 365,456 365,456 At 31 March 2025 (restated*) 6,703,821 6,703,821 Non-current liabilities 6,703,821 6,703,821 This provision is for the obligation to restore the mine to its original state once mining operations cease, discounted back to present value based on the term of the Mineral Lease. The Directors' cost estimate is based on the original technical assessment of restoration costs commissioned for the site, adjusted to remove the inflation and VAT embedded within that estimate: prior to inflation, this real cost base is £8,208,833 (2025: £8,208,833), comprising direct costs and a contingency allowance. The provision has been discounted using a nominal discount rate that reflects current market assessments of the time value of money, being the yield on UK government bonds matched to the expected date of expenditure. Inflation on the cost base is derived independently, using the difference between nominal and index-linked UK government bond yields at the same date, rather than being included as a separate assumption. The ultimate costs to restore the mine remain uncertain, and cost estimates can vary in response to many factors, including the extent and cost of rehabilitation activities, technological and regulatory change, and cost increases outside of general inflation. Management has considered these risks and concluded that the original contingency allowance included within the cost base continues to represent an appropriate allowance for this uncertainty, rather than applying a separate risk premium to the discount rate; this treatment will be kept under review. The discount rate used was 5.65% (2025: 5.4%), with inflation derived from market gilt yields at each reporting date rather than a fixed assumed range, and restoration expenditure is assumed to occur towards the end of the Mineral Lease's term, rather than by reference to an estimated mining period based on the site's original operator's business plan. At the reporting date, these assumptions represent management's best estimate of the present value of the future restoration costs. 27 Retirement benefits Defined contribution pension scheme The Group operates a defined contribution pension scheme. The pension cost charge for the year represents contributions payable by the Group to the scheme and amounted to £86,563 (2025: £92,332). Contributions totaling £15,845 (2025: £17,744) were payable to the scheme at the end of the year and are included in creditors. 28 Share capital Allotted, called up and fully paid shares 31 March 2026 31 March 2025 No. £ No. £ Ordinary Shares of£0.01 each 1,247,672,923 12,476,729 188,731,307 1,887,313 B shares of £0.01 each 257,075,833 2,570,758 - - The holders of Ordinary Shares are entitled to receive dividends as declared from time to time and are entitled to one vote per share at meetings of the Company. All Ordinary Shares rank equally with regard to the Company's residual assets. Following the partial conversion of the Convertible Loan Notes on 31 December 2025, the Company issued 490,402,989 B Shares. The B Shares carry the same economic rights as Ordinary Shares, including in respect of dividends, on a winding up, and in a takeover situation, and rank pari passu with the Ordinary Shares, but carry no right to vote at general meetings. They are transferable but are not listed or admitted to any trading facility. B Shares convert into Ordinary Shares on a one-for-one basis at the holder's election, subject to the holder (together with any transferee and persons acting in concert) remaining below the mandatory offer threshold under Rule 9 of the City Code, or the Company ceasing to be subject to the Code; a holder may also elect to convert sufficient B Shares to exceed that threshold where it wishes to make a mandatory offer in compliance with the Code.
Page 27
During the year, 233,327,156 B Shares were converted into Ordinary Shares leaving 257,075,833 B Shares in issue at 31 March 2026. The B Shares, comprising the core settlement tranche and the Additional B Shares, have been classified as equity instruments in accordance with IAS 32, on the basis they carry no obligation to deliver cash, no mandatory redemption feature, and convert into Ordinary Shares on a fixed one-for-one basis. A reconciliation of the number of shares outstanding at the end of each year is presented as follows: 31 March2026 31 March2026 31 March2025 31 March2025 Ordinary Shares B shares Ordinary Shares B Shares Number of shares brought forward 188,731,307 - 187,074,111 - Issue of ordinary shares, founder share incentives, on 22 May 2024 at£0.01 per share - - 1,657,196 - Issue of ordinary shares, founder share incentives, on 24 December2025 at £0.01 per share 1,657,196 - - - Issue of ordinary shares in respect of convertible loan note conversion,on 06 January 2026 584,831,728 - - - Issue of B shares in respect of convertible loan note conversion, on 03February 2026 - 490,402,989 - - Issue of Ordinary shares, following the equity raise, on 11 February 2026 100,000,000 - - - Issue of Ordinary shares, following the equity raise, on 27 February 2026 139,125,536 - - - Issue or Ordinary shares, following the conversion of B shares, on 24February 2026 199,520,870 (199,520,870) - - Issue or Ordinary shares, following the conversion of B shares, on 17March 2026 33,806,286 (33,806,286) - - Number of shares carried forward 1,247,672,923 257,075,833 188,731,307 - A reconciliation of the cash and non-cash movement of Share Capital is presented as follows 31 March2026 31 March2026 31 March2026 31 March2026 Ordinary Shares B shares Cash Non Cash Number Number £ £ Issue of ordinary shares, founder share incentives, on 24 December2025 at £0.01 per share 1,657,196 - 16,572 - Issue of ordinary shares in respect of convertible loan note conversion,on 06 January 2026 584,831,728 - - 67,255,649 Issue of B shares in respect of convertible loan note conversion, on 03February 2026 - 490,402,989 - 129,956,792 Issue of Ordinary shares, following the equity raise, on 11 February 2026 100,000,000 - 18,000,000 - Issue of Ordinary shares, following the equity raise, on 27 February 2026 139,125,536 - 25,042,596 - Issue costs from equity raise - - (2,029,915) - Issue or Ordinary shares, following the conversion of B shares, on 24February 2026 199,520,870 (199,520,870) Issue or Ordinary shares, following the conversion of B shares, on 17March 2026 33,806,286 (33,806,286) - - Total movement during the year 1,058,941,616 257,075,833 41,029,253 197,212,441 During the year the Company issued 1,058,941,616 Ordinary shares (2025: 1,657,196) and 490,402,989 B shares (2025: nil). The charge to share capital and premium comprised £41,029,253 cash and £197,212,441 non-cash on conversion of convertible loan notes. Of the B shares issued, 33,806,286 were converted into Ordinary shares on 17 March 2026 for nil consideration. This represents a movement between share classes rather than a new issue of capital, and has been excluded from the cash and non-cash totals above. As a result, 257,075,833 B shares remained in issue at 31 March 2026. 29 Reserves
Page 28
Share premium Share premium represents the excess of consideration received over the nominal value of shares issued, net of issue costs. Share option reserve The share option reserve represents the cumulative fair value of share options granted by the Group that have been recognised in accordance with IFRS 2. The reserve increases as the related expense is recognised over the vesting period and is transferred within equity upon exercise, lapse or expiry of the awards. Retained earnings Retained earnings represents cumulative profits and losses recognised in the consolidated income statement, less dividends paid and other distributions to shareholders. 30 Share-based payments Founder share incentives - Details and movements The founder shareholders have a right to receive shares at a nominal value once certain milestones are hit. The movements in the number of share options during the year were as follows: 31 March2026No. 31 March2025No. Outstanding, start of year 16,571,952 18,229,148 Exercised during the year (1,657,196) (1,657,196) Outstanding, end of year 14,914,756 16,571,952 Upon admission to AIM, the original founder agreement was terminated and the Company granted replacement founder options to the founder shareholders with effect from admission. The founder options meet the definition of equity in the financial statements of the Company on the basis that the 'fixed for fixed' condition is met. No consideration was received for the founder options at grant date, therefore no accounting for the issue of the equity instruments is required under IFRS. On exercise, the shares are recognised at the fair value of consideration received, being the option price of £0.01. EMI share options - Details and movements Share options have been issued to key employees as an incentive to stay with the Company. These options can be exercised within four years following the grant date once the option has vested. The movements in the number of share options during the year were as follows: 31 March2026No. 31 March2025No. Outstanding, start of year 400,002 400,002 Outstanding, end of year - 400,002 Share options have been valued using the Black Scholes model. Inputs to the pricing model were as follows: Date of grant 2022 Share price at date of grant £0.45 - £0.60 Exercise price £0.01 - £0.45 Risk-free interest rate 1.5% Expected life of options 1-4 years Volatility 33%
Page 29
Volatility has been estimated based upon observable market volatilities of similar entities. The exercise price of share options outstanding at 31 March is £0.45 (2025: £0.45) and their remaining contractual life is estimated at 24 months (2025: 24 months). 31 March 2026 31 March 2025 Average Exercise Price £ Options Average Exercise Price £ Options Outstanding, start of year 0.45 400,002 0.37 1,533,335 Lapsed during the year (0.45) (400,002) (0.34) (1,133,333) Outstanding, end of year - - 0.45 400,002 CSOP share options - Details and movements Share options have been issued to key employees as an incentive to stay with the Company. These options can be exercised within ten years following the grant date once the option has vested. 31 March2026No. 31 March2025No. Outstanding, start of year 333,330 333,330 Lapsed during the year (116,666) - Outstanding, end of year 216,664 333,330 Share options have been valued using the Black Scholes model. Inputs to the pricing model were as follows: Date of grant 2023 Share price at date of grant £0.275 Exercise price £0.275 Risk-free interest rate 3.5% Expected life of options 3 years Volatility 62% Volatility has been estimated based upon observable market volatility of Tungsten West PLC. The exercise price of share options outstanding at 31 March was £0.275 (2025: £0.275) and their remaining contractual life was 6 months (2025: 6 months). The options lapse after 7 years and 6 months from the balance sheet date (2025: 7 years and 6 months). 31 March 2026 31 March 2025 Average ExercisePrice £ Options Average ExercisePrice £ Options Outstanding, start of year 0.275 333,330 0.275 333,330 Outstanding, end of year 0.275 216,664 0.275 333,330 The total amount recognised in profit or loss in respect of share-based payment arrangements was a net credit of £92,527 (2025: charge of £60,583), comprising a credit arising on the forfeiture of previously expensed share options during the year (2025: an expense recognised inrespect of options vesting over the period). 31 Commitments Capital commitments As at 31 March 2026 the Group contracted to purchase plant and machinery amounting to £nil (2025: £1,178,774). Of this an amount of £nil (2025: £123,320) is dependent on the commencement of mining operations. As at 31 March 2026 the Group contracted to purchase buildings amounting to £2,550,000 (2025: £nil). Other financial commitments
Page 30
The total amount of other financial commitments not provided in the financial statements was £5,550,000 (2025: £8,329,000), comprising of: £1,000,000 payable in respect of a prepaid royalty, conditional on the commencement of mining operations; £1,000,000 further committed payment to the funds held in the Escrow Account under the Escrow Agreement; £2,550,000 payable in respect of property transactions; and £1,000,000 payable to the mining contractor under the Mining Services Contract. Of the above, £nil (2025: £3,000,000) is payable between one and five years after mining operations commence, and £5,550,000 is payable within one year (2025: £5,329,000). Subsequent to the year end, the prepaid royalty of £1,000,000 was paid as a condition of restarting mining operations; the restoration top-up of £1,000,000 remains committed, payable within 30 days of reaching financial close of the debt facility; of the £2,500,000 property commitment, £1,100,000 has completed, with £1,400,000 remaining under contractual negotiation; and the commitment to the mining contractor was settled following termination of the Mining Services Contract. See note 36 for more details. Contingent liabilities As at 31 March 2026 the Group had an obligation to dispose of waste materials found onsite. It is the intention of management to dispose of the waste through the onsite Mine Waste Facility. If external disposal is required, the Company would incur third party disposal fees estimated at £1,000,000 (2025: £700,000). As third-party costs were not deemed probable no provision is included in the financial statements but are considered to represent a contingent liability at the year end. As at 31 March 2025, the Group was liable for payment of any withholding tax arising on the convertible loan notes then in issue, and had estimated the contingent liability, based on interest accrued to that year-end, at £1,000,000, on the basis that it considered the likelihood of a withholding tax liability arising as unlikely and accordingly made no provision. During the year, the convertible loan notes converted into equity, and as at 31 March 2026 the Group has no outstanding convertible loan notes and therefore no contingent withholding tax liability in respect of them (2025: £1,000,000). 32 Reconciliation of liabilities arising from financing activities At 1 April2025£ InterestAccrued£ Financingcash flows£ Newfinance£ Repayments£ Fair valuemovement (P&L)£ Otherchanges£ At 31 March2026£ Leaseliabilities 1,957,841 - (212,639) - - - 101,748 1,846,950 Convertibleloan notes 24,683,100 - - 5,205,000 - 167,324,341 (197,212,441) - Bridgingloan 250,000 (250,000) 2,000,000 (2,000,000) - - - 26,640,941 250,000 (462,639) 7,205,000 (2,000,000) 167,324,341 (197,110,693) 1,846,950 At 1 April2024£ Financingcash flows£ New finance£ Otherchanges£ At 31 March2025£ Lease liabilities 1,909,178 (227,792) - 276,455 1,957,841 Convertible loan notes 11,587,221 - 6,751,000 6,344,879 24,683,100 13,496,399 (227,792) 6,751,000 6,621,334 26,640,941 33 Classification of financial and non-financial assets and liabilities The classification of financial assets and liabilities for the year ending 31 March 2026 was as follows: 2026Financial assetsat amortised cost£ 2025Financial assetsat amortised cost£ 2026Financial assetsat FVTPL£ 2025Financial assetsat FVTPL£ Assets Non-current assets Escrow Cash 14,912,042 14,633,857 - -
Page 31
Current assets Trade and otherreceivables 12,574,406 2,986,872 - - Cash and cashequivalents 25,485,511 18,442 - - 52,971,959 17,639,171 - - 2026Financial liabilitiesat amortised cost£ 2025Financial liabilitiesat amortised cost£ 2026Financial liabilitiesat FVTPL£ 2025Financial liabilitiesat FVTPL£ Liabilities Non-current liabilities Loans and borrowings (1,742,223) (1,870,366) - - Current liabilities Trade and otherpayables (4,648,341) (2,570,049) - - Loans and borrowings (104,727) (87,475) - - Convertible loan notes - (24,683,100) (6,495,291) (4,527,890) - (24,683,100) Fair value of financial assets and financial liabilities that are measured at fair value on a recurring basis IFRS 13 requires the provision of information about how the company establishes the fair values of financial instruments. Valuation techniques are divided into three levels based on the quality of inputs: • Level 1 inputs are quoted prices (unadjusted) in active markets for identical assets or liabilities. • Level 2 inputs are inputs other than quoted prices included in level 1 that are observable, directly or indirectly. • Level 3 inputs are unobservable. The group's convertible loan notes are measured at fair value of £nil (2025: £24,683,100). These are classified as level 3. They are valued based on a scenario pricing model. A number of inputs such as the market value of shares are observable inputs but there are also significant unobservable inputs such as the discount rate and the probabilities assessed for each scenario. 34 Financial risk review Group This note presents information about the Group's exposure to financial risks and the Group's management of capital. Credit risk In order to minimise credit risk, the Group has adopted a policy of dealing only with creditworthy counterparties (including banks and customers) and obtains sufficient collateral, where appropriate, to mitigate the risk of financial loss arising from default. The Group's most significant credit risk relates to customers that may default on payments for goods sold. To date, the Group has made only a limited number of sales and, accordingly, its exposure to credit risk has been low. Liquidity risk The Directors regularly monitor forecast and actual cash flows and align the maturity profiles of financial assets and liabilities to ensure effective liquidity management and maintain adequate cash reserves and borrowing facilities. In the Directors' view, the principal liquidity risk relates to meeting short-term cash flow requirements. Further discussion of short-term liquidity risk is included in the going concern assessment in note 2. Market risk Other than the convertible loan notes, the Group has no significant interest-bearing financial assets or liabilities. In the future, the Group may also be exposed to foreign exchange risk, as tungsten prices are principally denominated
Page 32
in US dollars. The Group intends to manage this risk through the terms agreed in supply contracts with future customers. The Group does not currently use derivative financial instruments to manage its exposure to changes in interest rates or foreign exchange rates. The Group may require additional borrowings in the future to fund upgrades to its mineral processing facilities and, as a result, may be exposed to increases in interest rates. 35 Related party transactions Convertible loan notes During the year, the Group issued convertible loan notes of £5,205,000 (2025: £5,250,000) to entities connected with certain Directors of the Group. Interest of £nil (2025: £2,057,797) accrued on these convertible loan notes during the year. Bridge loan facility During the year, the Group agreed an unsecured bridge loan facility of up to £4.0 million with Lansdowne Partners (UK) Ltd, Drakewood Investments Limited and Henry Maxey, being the three largest noteholders (or affiliated entities) and, as such, related parties of the Group. The facility accrued interest at 15% per annum, capitalising monthly (increasing by 2% in the event of default), and was repayable on the earlier of six months from drawdown or completion of any debt or equity raise equal to or greater than the facility balance, with any smaller equity raise applied as a prepayment. The facility was available in two tranches of £2.0 million each: the first available immediately, and the second from 31 January 2026, subject to conditions including completion of the Conversion process of the Notes. The Group drew down only the first tranche of £2.0 million ("Tranche 1"), which was used to fund project restart costs included within the Feasibility Study. Tranche 1, together with accrued interest, was repaid from the net proceeds of the fundraise. Key management personnel Key management personnel are deemed to be the Directors. Their remuneration can be seen in note 11. 36 Post balance sheet events Mining Service Contract Subsequent to the year end, the Group has agreed with Hargreaves Services plc ("Hargreaves") to terminate the existing mining service contract. As per the terms of the contract, the Company made payments to Hargreaves of £3.0 million in April 2026, after which they released security held over the mineral lease, and a further payment of £7.0 million by 15 May 2027. LTIP grant to Directors On 22 July 2026, subsequent to the balance sheet date, the Company granted options under its Long Term Incentive Plan (approved by shareholders on 30 January 2026 and 26 February 2026) to three Directors, as follows: Director Total Awards Exercisable at 3p Exercisable at 18p* Stephen Harrison (Non-Executive Chairman) 30,260,695 30,260,695 - Jeffery Court (CEO) 75,651,737 60,521,388 15,130,349 Philip Povey (CFO) 37,825,868 30,260,695 7,565,173 *Options subject to 'stretch' performance targets, representing performance significantly in excess of the Group's base case business plan. The Awards are subject to performance conditions linked to commercial production and operational milestones, as assessed by the Remuneration Committee. Awards lapse on the fifteenth anniversary of grant unless they lapse earlier under their terms, and vesting accelerates on a change of control, subject to the LTIP rules and relevant option agreements. This is a non-adjusting post balance sheet event under IAS 10, as the grant occurred, and the grant date (for IFRS 2 purposes) arose, after 31 March 2026. No liability or expense has been recognised in these financial statements in respect of these Awards. A share-based payment charge will be recognised prospectively over the relevant vesting period(s) in future reporting periods, based on the fair value of the Awards at grant date. Funding Subsequent to the year end, in August 2026, the Group secured funding from National Wealth Fund Limited ("NWF"), comprising an equity raise of approximately £36 million and a new 366-day £25 million loan facility, with a
Page 33
£10 million accordion. This funding secured the amount required to complete the Group's remaining project capital expenditure at Hemerdon. As at the date of these accounts, the £25 million loan facility had been drawn down in full. 37 Prior year adjustments Restoration Provision and Escrow Cash Management reviewed the application of IAS 37 to the restoration obligation assumed by Drakelands Restoration Limited ("DRL") under the Mineral Lease at Hemerdon Mine, and to DRL's related entitlement to reimbursement from an Escrow Account. A restoration provision and a corresponding escrow receivable had previously been recognised in the financial statements. A subsequent review identified errors in the assumptions, inputs and methodology applied in measuring both balances. Restoration Provision The restoration provision had been determined using the escrow balance as a proxy for the underlying restoration obligation, rather than being based on an independent estimate of expected restoration costs. In addition, the provision incorporated inflation and risk adjustments applied more than once, and included amounts relating to VAT, resulting in an overstatement of the liability. Management has recalculated the restoration provision at £8,221,081 as at 31 March 2024, using the cost estimate obtained by the previous site operator, adjusted to exclude the inflation embedded within it and VAT, and independently inflated and discounted using market-observable gilt rates at the relevant valuation date, with drawdown timing aligned to the contractual term of the Mineral Lease. The resulting correction to the restoration provision as at 1 April 2024 has been recognised through opening retained earnings, as the corresponding adjustment relates to the correction of an error existing at that date rather than a change arising during a subsequent period. The subsequent remeasurement of the restoration provision during the year ended 31 March 2025 has been recognised as an adjustment to the related mining rights asset, consistent with the Group's accounting policy under IFRIC 1, rather than through profit or loss or retained earnings, on the basis that this remeasurement reflects a change in the estimated timing or amount of the restoration obligation arising after initial recognition. Escrow Cash The escrow receivable had been measured as a discounted long-term receivable, rather than by reference to the underlying escrow cash balances. The corresponding credit arising on initial recognition had not been recognised through the income statement. As a result, both the asset and retained earnings were misstated. DRL's entitlement under the Escrow Agreement has been reassessed as a financial asset under IFRS 9. The escrow funds are held by the escrow agent, partly in a fixed-term deposit account and partly in a current account, and are not available for the Group's general use. As the balance represents actual cash deposits held on the Group's behalf, rather than a long-dated receivable requiring separate discounting, it is measured at the underlying cash balance confirmed by the escrow agent, plus accrued interest income. Consequently, the prior period statement of financial position has been restated in accordance with IAS 8. The restatement corrected the restoration provision to £8,221,081 and reclassified the escrow receivable from a discounted long-term receivable to £13,740,012, presented within cash and cash equivalents, being the escrow cash balance confirmed by the escrow agent, with the corresponding adjustments recognised through opening retained earnings. Goodwill On review of Goodwill, management identified that the purchase price allocation performed on acquisition of DRL, under the Group's previous GAAP (FRS 102), had not correctly identified and measured all separable identifiable assets acquired, including intangible assets such as mining rights, ahead of determining the residual goodwill balance. Drakelands Restoration Limited was acquired prior to the Group's date of transition to IFRS. On first-time adoption of IFRS, the Group elected to apply the exemption available under IFRS 1 and therefore did not restate business
Page 34
combinations that occurred before the transition date. Accordingly, the acquisition continued to be accounted for using the carrying amounts arising under the previous GAAP purchase price allocation as deemed cost at the date of transition. The previous calculation did not correctly sequence this allocation, resulting in £1,075,520 being recognised as goodwill that should instead have been allocated to mining rights and the associated deferred tax balances. Management has recalculated the purchase price allocation applying the correct sequencing required under FRS 102, reallocating the goodwill balance of £1,075,520 in full, with £345,097 allocated to mining rights and the balance reflected through the associated deferred tax asset and liability. There was no impact on retained earnings P&L Cost Classification During the year, management identified that a mining service fee of £1.0m, previously classified within cost of sales in the year ended 31 March 2025 related to a period in which mining activities had not yet commenced and the site was under care and maintenance only. As the cost did not relate to production activity, it has been reclassified to administrative expenses as this better reflects its nature. This reclassification has no impact on reported profit, net assets or earnings per share for the prior year. The combined impact of these restatements is set out below: Impact on Balance Sheet, Profit and Loss and Retained Earnings Impact as at 31 March 2024 Restatement As previously reported£ Adjustment£ As restated£ Restoration provision (5,137,646) (3,083,435) (8,221,081) Escrow reimbursement asset 11,059,151 2,680,861 13,740,012 Goodwill 1,075,520 (1,075,520) - Mining rights 3,844,334 345,097 4,189,431 Deferred tax asset 1,382,901 (961,083) 421,818 Deferred tax liability (1,382,901) 961,083 (421,818) Retained earnings (opening, cumulative impact) (32,764,067) (1,132,997) (33,897,064) Impact as at 31 March 2025 Restatement As previously reported£ Adjustment£ As restated£ Restoration provision (4,006,771) (2,697,050) (6,703,821) Escrow reimbursement asset (capped, IFRIC 5.9) 13,237,420 1,396,437 14,633,857 Goodwill 1,075,520 (1,075,520) 0 Mining rights 3,844,334 (1,537,619) 2,306,715 Deferred tax asset 1,368,014 (961,083) 406,931 Deferred tax liability (1,368,014) 961,083 (406,931) Profit and loss (21,912,258) (2,780,755) (24,693,013) Retained earnings (cumulative impact) (54,676,325) (3,913,752) (58,590,077) Impact on Cashflow The prior period restatements described above are all non-cash in nature, relating to the correction of the restoration provision, the associated escrow cash reclassification, and the goodwill and mining rights reallocation. As these adjustments do not represent cash inflows or outflows, they are reflected as reconciling items within the reconciliation of loss for the year to net operating cash flow, with no impact on the total net cash flows from operating, investing or financing activities as previously reported. Company Statement of Financial Position Year ended 31 March 2026 Note 2026£ 2025£ Non-current assets Tangible fixed assets 41 26,985 28,935 Investments in subsidiary undertakings 42 4,190,460 4,190,460 Receivables due after more than one year 43 52,159,851 35,941,304 56,377,296 40,160,699 Current assets
Page 35
Receivables due within one year 43 1,641,150 167,076 Cash at bank and in hand 44 24,806,505 13,093 26,447,654 180,169 Total Assets 82,824,950 40,340,868 Equity and liabilities Equity Share capital 47 15,047,487 1,887,313 Share premium 277,030,598 51,949,078 Share option reserve 226,999 319,526 Retained earnings (210,340,421) (39,398,958) Equity attributable to owners of the Company 81,964,663 14,756,959 Current liabilities Trade and other payables 45 860,287 900,809 Convertible loan notes 46 - 24,683,100 Total liabilities 860,287 25,583,909 Total equity and liabilities 82,824,950 40,340,868 The Company has taken the exemption in section 408 of the Companies Act 2006 and has not presented its individual profit and loss account. The Company made a loss for the financial year of £170,941,463 (2025: £10,601,728). The notes on pages 70 to 76 are an integral part of these financial statements. The Company accounts were approved by the Board on 2nd September 2026 and signed on its behalf by: Philip Povey Director Company Registration Number: 11310159 Company Statement of Changes in Equity Year ended 31 March 2026 Share capital£ Sharepremium£ Share optionreserve£ Retainedearnings£ Total£ At 31 March 2024 1,870,741 51,949,078 256,278 (28,797,230) 25,278,867 Loss for the year - - - (10,601,728) (10,601,728) Total comprehensive income - - - (10,601,728) (10,601,728) New share capital subscribed 16,572 - - - 16,572 Share options charge - - 63,248 - 63,248 At 31 March 2025 1,887,313 51,949,078 319,526 (39,398,958) 14,756,959 Loss for the year - - - (170,941,463) (170,941,463) Total comprehensive income - - - (170,941,463) (170,941,463) Conversion of convertible loan notes 8,181,588 189,030,853 - - 197,212,441 New share capital subscribed net ofissue costs 4,978,586 36,050,667 41,029,253 Share options charge - - (92,527) - (92,527)
Page 36
At 31 March 2026 15,047,487 277,030,598 226,999 (210,340,421) 81,964,663 The nature and purpose of each reserve is set out in Note 49. The notes on pages 70 to 76 are an integral part of these financial statements. Notes to the Company Financial Statements Year ended 31 March 2026 38 General information Tungsten West plc ('the Company') is a public limited company, incorporated in England and Wales and domiciled in the United Kingdom. The address of itsregisteredoffice and principal place ofbusiness is: Hemerdon Mine Drakelands Plympton Devon PL7 5BS United Kingdom 39 Accounting policies Basis of preparation The Company financial statements have been prepared in accordance with FRS 101 Reduced Disclosure Framework ('FRS 101'). No profit and loss account is presented for Tungsten West plc, as permitted by section 408 of the Companies Act 2006. The financial statements are presented in Sterling, which is the functional currency of the Company. Reduced disclosures applied In preparing the Company financial statements the Company has applied the following disclosure exemptions allowed under FRS 101, therefore the following are omitted: · A Company statement of cash flows as required by IAS 1 and IAS 7. · Financial instruments disclosures under IFRS 7. · Fair value disclosure under IFRS 13. · Related party disclosures with wholly owned subsidiaries of the Group. · Reconciliations of share capital movements required by IAS 1. · Comparative information for property, plant and equipment. · Disclosing information on leases required by IFRS 16 in a single note. The Group's financial statements are included within this document. Going concern The Company financial statements have been prepared on a going concern basis, which the Directors consider to be appropriate for the reasons set out below, having given careful consideration to the Company's financial position, funding arrangements and future cash flow forecasts, covering a period of at least twelve months from the date of approval of these financial statements. The Company's principal asset is its investment in, and amounts due from, its subsidiary Drakelands Restoration Limited, which operates the Hemerdon Mine (also known as Drakelands Mine). During the year ended 31 March 2026, Drakelands Restoration Limited was a developer with low levels of production. A phased restart of commissioning commenced from July 2026 and will ramp up through the remainder of the calendar year and into 2027. During the year, the Company significantly strengthened its funding position. In February 2026, the Company completed an equity fundraise of approximately £43 million (gross). Separately, the Company's outstanding Convertible Loan Notes converted into equity during the year and were accordingly extinguished, removing the
Page 37
Company's prior reliance on convertible loan note financing and associated short-term bridging finance. Following the year end, the Company secured further funding from National Wealth Fund Limited ("NWF"), comprising an equity raise of approximately £36 million and a new 366-day £25 million loan facility, with a £10 million uncommitted accordion. Together, these transactions secured the funding required for the remaining project capital expenditure at Hemerdon. The Directors have prepared detailed cash flow forecasts covering the going concern assessment period, based on the production, cost and pricing assumptions underpinning the Feasibility Study for the Hemerdon Mine, updated to reflect the phased restart plan, and the funding secured as described above. These forecasts have been sensitised for a range of downside scenarios, consistent with the sensitivity analysis performed as part of the Feasibility Study and the value in use assessment described in note 2, including delays to the production ramp-up schedule, lower than forecast metal prices and recoveries, and unfavourable movements in foreign exchange rates. The Directors have also modelled a downside scenario addressing the risk of delay to completion of the front-end crushing circuit. Under this scenario, Drakelands Restoration Limited would fall back on its existing mobile front-end crushing and in-pit crushing arrangements with a contractor - the process route already in use earlier in the year - pushing back the ramp-up of the permanent front-end by three months. This fallback route carries a higher per- tonne processing cost than the planned front-end/ore sorter route, increasing operating costs over the delay period by approximately £3 million. A corresponding pause to waste mining over the same period has also been modelled, reducing drill and blast costs but offset by increased haulage costs to the more distant processing facility under the fallback route; these two effects have been assessed as broadly offsetting. Under each of the scenarios modelled, the Company retains sufficient liquidity throughout the going concern assessment period, taking into account the £25 million NWF loan facility (with its £10 million accordion) and the Company's cash resources. The Directors have also considered the maturity of the NWF loan facility, which is repayable 366 days from drawdown, and have concluded that the Company's forecast operating cash flows, together with the accordion facility and the Company's ongoing relationship with NWF, provide a reasonable basis to expect that the facility can be refinanced or repaid as it falls due. Having considered the matters set out above, the Directors have a reasonable expectation that the Company has adequate resources to continue in operational existence for the going concern assessment period. Accordingly, the Directors continue to adopt the going concern basis in preparing these financial statements. This represents a change from the prior year, in which a material uncertainty relating to going concern was disclosed pending completion of the Company's longer-term funding arrangements. Summary of significant accounting policies and key accounting estimates The principal accounting policies applied in the preparation of these financial statements are set out below and are consistent with those of the Group, as set out in note 2 to the consolidated financial statements, except as set out below. These policies have been consistently applied to all years presented, unless otherwise stated. Investments Interests in subsidiaries are initially measured at cost and subsequently measured at cost less any accumulated impairment losses. The investments are assessed for impairment at each reporting date and any impairment losses or reversals of impairment losses are recognised immediately in profit or loss. Expected credit losses on inter-company loans The Company has extended loans to its subsidiaries (inter-company loans) and calculates expected credit losses on these loans in accordance with IFRS 9 Financial Instruments. The expected credit losses for inter-company loans are measured based on a forward-looking assessment of credit risk, taking into consideration both historical data and reasonable and supportable information about future events. The Company classifies inter-company loans and measures the corresponding expected credit losses using the following stages: Stage 1 - loans with no significant increase in credit risk since initial recognition: a loss allowance equal to 12-month expected credit losses is recognised. Stage 2 - loans with a significant increase in credit risk since initial recognition: a loss allowance equal to lifetime expected credit losses is recognised. Stage 3 - loans that are credit-impaired, where there is evidence of a measurable decrease in estimated future cash flows since initial recognition: a loss allowance equal to lifetime expected credit losses is recognised. The determination of expected credit losses involves assessing a range of possible outcomes and their respective probabilities, incorporating historical data, economic conditions, industry-specific information, and forward-looking information. Key sources of estimation uncertainty - probability estimates in calculating expected credit losses The calculation of expected credit losses involves the incorporation of probability estimates to reflect the likelihood of different credit events occurring. The most significant economic risk to the Company is lenders' appetite to invest long term in the Company. Management estimates the chance of success at 85%.
Page 38
The expected credit loss provision at year-end is £25,085,361 (2025: £25,085,361), representing a 32% (2025: 41%) effective provision rate. This rate is higher than would be expected based on the overall probability of recovery estimate of 72%, due to the 100% provision held against the loan to Tungsten West Services Limited, as that company is not expected to generate future profits to repay the inter-company loan. Sensitivity analysis The Company has performed a sensitivity analysis to assess the impact of changes in the probability estimate on the expected credit loss provision. A 10% increase in the probability estimate would reduce the expected credit loss by £6.1 million (2025: £6.1 million). A 10% decrease would increase the expected credit loss by £6.1 million (2025: £6.1 million). Based on this analysis, management believes the loss allowance recognised is appropriate given the current economic environment and the specific characteristics of the inter-company loans. Significant accounting estimates and judgements The preparation of the Company financial statements requires management to make estimates and judgements that affect the reported amounts of certain assets and liabilities. The use of estimates and judgements in the Company financial statements is principally limited to the following two areas: Significant accounting judgements Investments in subsidiary undertakings Investments in subsidiary undertakings are carried at cost less accumulated impairment losses. At each reporting date, management assesses whether there are indicators of impairment, having regard to the trading performance, net asset position and future funding requirements of each subsidiary, in particular Drakelands Restoration Limited given the Group's continued pre-production status and reliance on external financing to complete the MPF rebuild. The recoverable amount of the investment is assessed by reference to the value in use of the Hemerdon Mine cash-generating unit, as determined in note 2 to the consolidated financial statements, on the basis that the underlying value of the subsidiary is derived from that asset. Management has concluded that the carrying value of the Company's investment in subsidiaries of £4,190,460 (2025: £4,190,460) continues to be supported and that no impairment is required in the year (2025: £nil). Key sources of estimation uncertainty Recoverability of intercompany receivables The Company has extended loans to its subsidiaries and assesses expected credit losses on these balances in accordance with IFRS 9. This requires management to estimate the probability of the Company's subsidiaries generating sufficient future profits, and of the Group securing the financing required to complete the mine restart, to enable repayment of the intercompany balances. The most significant economic risk affecting recoverability is lenders' appetite to invest long term in the Company. Management estimates the chance of success at 85%. The Company has recognised a loss allowance against its intercompany loans as follows: Stage 1 (12-month expected credit losses): £nil Stage 2 (lifetime expected credit losses): £0.1 million Stage 3 (lifetime expected credit losses): £13.1 million The total loss allowance for intercompany loans as of the reporting date is £13.2 million (2025: £25.1 million), representing an effective provision rate of 17% (2025: 41%). The reduction in the year reflects the significant progress made in securing funding, advancing the mine permitting process, and moving closer to sustained revenue generation, which has strengthened management's assessment of the recoverability of balances due from the majority of the Company's subsidiaries. Substantially the whole of the remaining provision relates to the loan to Tungsten West Services Limited, which is not expected to generate future profits to repay the intercompany loan, and against which a 100% provision continues to be held. 40 Company staff costs The aggregate payroll costs (including Directors' remuneration) were as follows: 2026£ 2025£ Wages and salaries 255,998 112,000 Social security costs 36,020 12,140 Share based payments (92,527) 60,583
Page 39
199,491 184,723 The average number of persons employed by the Company (including Directors) during the year, analysed by category was as follows: 2026No. 2025No. Management 5 5 Total 5 5 Remuneration of the Directors is disclosed in note 11 to the Consolidated Financial Statements. 41 Tangible fixed assets Furniture, fittings and equipment £ Other property, plant and equipment £ Total £ Cost At 1 April 2025 2,048 36,983 39,031 At 31 March 2026 2,048 36,983 39,031 Depreciation At 1 April 2025 1,947 8,149 10,096 Charge for the year 101 1,849 1,950 At 31 March 2026 2,048 9,998 12,046 Carrying amount At 31 March 2026 - 26,985 26,985 At 31 March 2025 101 28,834 28,935 42 Investment in subsidiary undertakings Summary of the Company investments 31 March2026£ 31 March2025£ Investments in subsidiaries 4,190,460 4,190,460 Subsidiaries Cost Opening cost 4,558,310 4,555,646 Additions - 2,664 Closing cost 4,558,310 4,558,310 Provision Opening provision (367,850) (367,850) Closing provision (367,850) (367,850) Valuation Opening Valuation 4,190,460 4,187,796 Carrying value as at 31 March 2025 4,190,460 4,190,460 Additions in the current year relate to further investment in subsidiaries as a result of share options in the Company granted to employees of those subsidiaries.
Page 40
Management makes regular checks on internal and external impairment indicators in respect of the Company's investment in subsidiary undertakings. During the year ended 31 March 2026 and as of the date of this report, management did not identify any internal or external indicators triggering a detailed impairment review. The group commenced phased commissioning at the Hemerdon Mine in July 2026, in line with management's phased restart plan, and the Group secured the funding required to complete its remaining project capital expenditure through the National Wealth Fund agreement entered into following the year end. Management is confident that the carrying amount of the Company's investment in subsidiaries continues to be fully recoverable, with no impairment of any assets being deemed necessary. Information on the Company's subsidiary undertakings is disclosed in note 19 to the Consolidated Financial Statements. 43 Receivables 31 March2026£ 31 March2025£ Net receivables from subsidiaries 52,159,851 35,941,304 Prepayments 70,582 129,491 Other receivables 1,570,568 37,585 53,801,001 36,108,380 Less - amount due after more than one year (52,159,851) (35,941,304) Amounts due within one year 1,641,150 167,076 The full balance within net receivables from subsidiaries is due on demand. It is unlikely that recovery of this balance will be made within one year of the balance sheet date and therefore the balance has been presented in amounts due after more than one year. The average credit period on sales of goods is 30 days. No interest is charged on outstanding trade receivables. The carrying amount of trade and other receivables approximates the fair value. As the company is in the early phases of operations and making a few minor sales, credit losses are being considered on a customer-by-customer basis. No credit losses against trade receivables were identified as at year end. Loss allowance for inter-company loans Amounts due from group undertakings are unsecured, interest free, have no fixed date of repayment and are repayable on demand. As of the reporting date, the Company has assessed the expected credit losses on its inter-company loans and recognised a loss allowance as follows: Stage 1: £nil representing the 12-month expected credit losses Stage 2: £10.6 million representing the lifetime expected credit losses Stage 3: £14.5 million representing the lifetime expected credit losses The total loss allowance for inter-company loans as of the reporting date is £25.1 million (2025: 25.1m) The overall credit loss of 41% allows for factors including restructuring of the group and non-recoverable balances from subsidiaries for which income is now no longer planned due to corporate restructuring activities and other internal factors. 31 March2026£ At 1 April 2025 35,941,304 Increase during the year 16,218,547 Change in expected credit loss - At 31 March 2026 52,159,851 Gross receivables from subsidiaries 77,245,210 Overall credit loss (25,085,359)
Page 41
Net receivables from subsidiaries 52,159,851 44 Cash at bank and in hand 31 March2026£ 31 March2025£ Cash at bank 24,806,505 13,093 45 Trade and other payables 31 March 2026 £ 31 March 2025 £ Trade payables 748,801 700,669 Accrued expenses 103,071 189,548 Social security and other taxes 8,415 10,592 860,287 900,809 Trade payables and accruals comprise amounts outstanding for trade purchases and ongoing costs. The average credit period for trade purchases is 45 days (2025: 45 days). No interest is charged on overdue amounts. The carrying amount of trade and other payables approximates the fair value. 46 Convertible loan notes Please refer to group note 25. Movement in liability 31 March2026£ 31 March2025£ Brought forward 24,683,100 11,587,221 Cash received 5,205,000 6,751,000 Directly attributable costs incurred - (2,000) Fair value movement in year 167,324,341 6,346,879 Conversion (197,212,441) - Carried forward - 24,683,100 47 Share capital Please refer to group note 28. 48 Share-based payments Information on share-based payments is disclosed in note 30 to the Consolidated Financial Statements. 49 Reserves Share premium Share premium represents the excess of consideration received over the nominal value of shares issued, net of issue costs. Share option reserve The share option reserve represents the cumulative fair value of share options granted by the Group that have been recognised in accordance with IFRS 2. The reserve increases as the related expense is recognised over the vesting period and is transferred within equity upon exercise, lapse or expiry of the awards. Retained earnings
Page 42
Retained earnings represents cumulative profits and losses recognised in the consolidated income statement, less dividends paid and other distributions to shareholders. 50 Commitments During a previous financial year the Company signed a contract to pay £200,000 (2025: £200,000) compensation to a third party once mining operations commenced. Contingent liabilities As at 31 March 2025, the Company was liable for payment of any withholding tax arising on the convertible loan notes then in issue, and had estimated the contingent liability, based on interest accrued to that year-end, at £1,000,000, on the basis that it considered the likelihood of a withholding tax liability arising as unlikely and accordingly made no provision. During the year, the convertible loan notes converted into equity, and as at 31 March 2026 the Company has no outstanding convertible loan notes and therefore no contingent withholding tax liability in respect of them (2025: £1,000,000). 51 Related party transactions Information on related party transactions is disclosed in note 35 to the Consolidated Financial Statements. 52 Post balance sheet events Information on post balance sheet events is disclosed in note 36 to the Consolidated Financial Statements. This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authorityto act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this informationmay apply. For further information, please contact rns@lseg.com or visit www.rns.com. RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the informationcontained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. Forfurther information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy. END