MAZAGON DOCK SHIPBUILDERS LIMITED INVESTOR PRESENTATION FOR THE FY 2024-25 SHIP & SUBMARINE BUILDERS TO THE NATION
Page 3
‘Navratna’ Only Shipyard to be conferred Navratna Status Tri-Commissioning 15th January,2025 was the Landmark day in Indian history as Indian Navy Commissioned three frontline combatants i.e INS Nilgiri, INS Surat & INS Vaghsheer. Kalvari Class Submarines Project Delivered all 6 Submarines between 2017-2025 Only India’s only shipyard to have built Destroyers, conventional Submarines for the Indian Navy & manufactured Corvettes in India Destroyer Project All 4 Destroyers are delivered ahead of schedule Frigate Project MDL is the lead shipyard for building 4 of the Nilgiri Class Stealth Frigates, first ship was delivered on December 20,2024 805 Vessels Delivered from 1960: 30 Warships from advanced Destroyer to Missile Boats, & 8 Submarines MDL IN SNAPSHOT We are proud to celebrate 250 years of excellence, dedication, and service to the nation. Since 1774, Mazagon Dock Shipbuilders Limited has played a vital role in building India’s maritime strength. Our journey reflects growth, innovation, and commitment to the nation.
Page 4
Journey started with a Small Dry Dock 1774 Incorporated as a private company 1934 Acquired by the Government of India 1960 1972 Delivered the 1st Frigate, INS Nilgiri 1984 Starts Constructing submarines 1992 Commissioned 1st Indian built Submarine, INS Shalki 1997 Commissioned 1st Destroyer, INS Delhi 2006 Awarded Mini Ratna Category – I status 2015 Signs an agreement to build four frigates 2017 Delivery of 1st Scorpene Class Submarine, INS Kalvari 2020 Listing of MDL Shares on BSE & NSE - Oversubscribed by 157 Times 2021 Delivered 2 Submarines and 1 Destroyer in a single Calendar Year2022 For the first time, launched a frigate and a destroyer on the same day 2023 • 4th Stealth Frigate Project 17A Mahendragiri Launched on 1st September • Commissioned INS Imphal a Third Destroyer on 26th December 2024 2025 • Awarded Navratna status by the Department of Public Enterprises • Delivery of INS Surat & INS Nilgiri on 20th Dec, 2024 • Tri-Commissioning 15th January,2025 was the Landmark day in India’s history as Indian Navy Commissioned three frontline combatants i.e. INS Nilgiri, INS Surat & INS Vaghsheer.
Page 5
• Only Public Sector Defence Shipyard Constructing Destroyers & Submarines • World Class Infrastructure • Capacity of building 11 Submarines & 10 War Ships concurrently • Strategically Located • Healthy Order Book • Indigenization of Warships • Despite Covid Pandemic & associated shortage of oxygen , global shortage of chips, delivered 5 Scorpene Submarine to Indian Navy between 2017 to 2022. • Delivered 7 Destroyers between 2014 to 2025 i.e, One Destroyer every 18 Months • 3rd Destroyer of P15B delivered 5 Months ahead of Schedule • 4th Destroyer of P15B delivered 2 Months ahead of Schedule • Consistent Profitability since more than 20 years • Consistent Dividend • Zero Debt 1 3 4 5 6 2
Page 6
3 Dry Docks, 3 Wet Basins, 3 Big Slipways, 6 Small Slipways Production, Assembly & Electrical Shops 300 Tonne Goliath Crane Shore Integration Facility Machine and Fitting, Instrumentation Shop Fabrication Shops Sub-section Assembly & Section formation Shops Cradle Assembly Shop for equipment outfitting Submarine Dry Dock Shore Integration Facility WORLD - CLASS INFRASTRUCTURE Submarine Division: Shipbuilding Division:
Page 7
A DIVERSE AND DISTINGUISHED MARITIME PROFILE Naval Platforms Destroyers Conventional Submarines Frigates Corvettes Missile Boat Offshore Patrol vessels Floating Border Outposts Oil Sector Offshore Platforms Jack-up rigs Merchant Ships General Cargo Vessel Multipurpose Support Vessel Offshore Supply vessel Tugs Dredgers Passenger cum Cargo Vessel Water tankers Barges Trawlers Windmill towers Pontoons
Page 9
10 YEARS AT A GLANCE Particulars 2024-25 2023-24 2022-23 2021-22 2020-21 2019-20 2018-19 2017-18 2016-17 2015-16 Equity Share Capital 201.69 201.69 201.69 201.69 201.69 201.69 224.10 224.10 249.00 199.20 Other Equity 6979.15 5368.99 3975.87 3119.67 2717.37 2389.24 2581.79 2198.30 2359.78 2647.03 Net Worth 7180.84 5570.68 4177.56 3321.36 2919.06 2590.93 2805.89 2422.40 2608.78 2846.23 Gross Block 2091.00 1354.70 1493.57 1363.62 1140.39 1113.00 919.12 763.35 844.54 594.20 Net Fixed Assets (Net Block) 1465.72 837.94 1024.33 964.62 806.85 848.35 753.96 646.37 546.27 344.59 Capital Employed 7180.84 5570.68 4177.56 3321.36 2919.06 2590.93 2805.89 2422.40 2608.78 2846.23 Working Capital 4890.78 3169.46 1945.34 1345.50 1301.47 1627.49 1907.17 1937.32 2522.63 2188.39 Revenue from Operations 11431.88 9466.58 7827.18 5733.28 4047.82 4977.65 4649.15 4409.59 3529.74 4141.83 Gross Margin (EBITDA) 3228.80 2549.63 1511.28 868.33 824.07 856.96 892.20 750.43 891.01 925.42 Gross Profit (EBIT) 3113.60 2466.50 1435.70 793.82 764.42 788.27 830.78 700.22 851.62 893.92 Profit before tax and exceptional items 3109.20 2461.38 1429.33 786.66 756.06 779.01 826.68 696.37 847.72 925.59 Profit for the year 2324.88 1845.43 1072.72 586.47 479.57 415.02 519.40 439.80 533.49 637.82 Revenue from Operations /Gross Block 5.467 6.988 5.241 4.204 3.550 4.472 5.058 5.777 4.179 6.970 Current Ratio 1.247 1.139 1.081 1.053 1.063 1.099 1.118 1.125 1.169 1.072 (₹ in Cr) Note: Figures are based on the published financial statement
Page 10
MDL has signed a district level MoU with Satara Zilla Parishad, through their CSR implementation partner – Jivika Foundation to vaccinate 2,800 school girls against cervical cancer. Semi-rigid thoraco-videoscope machine funded by MDL to Nair Hospital in Mumbai for Pulmonary/Respiratory Medicine Department. CORPORATE SOCIAL RESPONSIBILITY CSR isn’t a particular programme, it’s what we do everyday, maximising positive impact and minimising negative impact. 69% 20% 2% 9% Sectorwise CSR Expenditure in FY 2024-25 (in %) Heath & Nutrition Education Research and Innovation
Page 11
SHAREHOLDING PATTERN AS ON 31.03.2025 Category Wise Shareholding Pattern Sl. Category Number of shares held % of total share holding 1 Promoters 34,21,81,966 84.83 2 Mutual funds 53,91,508 1.34 3 Alternate investment funds 3,76,869 0.09 4 Insurance companies 10,65,451 0.26 5 NBFC's registered with RBI 5,008 0 6 Foreign portfolio investments category 1 68,09,306 1.69 7 Foreign portfolio investments category 2 23,01,330 0.57 8 Shareholding by Companies or Bodies Corporate where Central / State Government is a promoter 14 0 9 Resident Individuals holding nominal share capital up to 2 lakhs 3,77,13,517 9.35 10 Resident Individuals holding nominal share capital excess of 2 lakhs 8,54,535 0.21 11 Foreign nationals 586 0 12 NRI 15,59,273 0.39 13 Bodies corporate 35,28,236 0.87 14 Any other 15,92,401 0.39 Total 40,33,80,000 100 1 Promoters, 84.83% 2 Mutual funds, 1.34% 3 Alternate investment funds, 0.09% 4 Insurance companies, 0.26% 5 NBFC's registered with RBI, 0.00% 6 Foreign portfolio investments category 1, 1.69 7 Foreign portfolio investments category 2, 0.57% 8 Shareholding by Companies or Bodies Corporate where Central / State Government is a promoter, 0.00% 9 Resident Individuals holding nominal share capital up to 2 lakhs, 9.35% 10 Resident Individuals holding nominal share capital excess of 2 lakhs, 0.21% 11 Foreign nationals, 0.00% 12 NRI, 0.39% 13 Bodies corporate, 0.87% 14 Any other, 0.39%
Page 12
REVENUE FROM OPERATION Rs. 11,431.88 CR PROFIT AFTER TAX Rs.2,324.88 CR
Page 13
QUARTERLY PERFORMANCE (STANDALONE) Q4 OF FY 2024-25 2000 2200 2400 2600 2800 3000 3200 3,174 3,144 3,104 Revenue from Operation (₹ in Cr) Q4 2024-2025 Q3 2024-2025 Q4 2023-2024 2000 2500 3000 3500 4000 3,520 3,430 3,480 Total Income (₹ in Cr) Q4 2024-2025 Q3 2024-2025 Q4 2023-2024 0 400 800 1200 436 1,104 900 EBITDA (₹ in Cr) Q4 2024-2025 Q3 2024-2025 Q4 2023-2024 0 200 400 600 800 1000 1200 406 1,063 876 PBT (₹ in Cr) Q4 2024-2025 Q3 2024-2025 Q4 2023-2024 - 200 400 600 800 327 768 654 PAT (₹ in Cr) Q4 2024-2025 Q3 2024-2025 Q4 2023-2024
Page 14
YEARLY PERFORMANCE (STANDALONE) FY 2024-25 0 2000 4000 6000 8000 10000 12000 11,432 9,467 Revenue from Operation (₹ in Cr) Q4 2024-2025 Q4 2023-2024 9000 12000 15000 12,601 10,605 Total Income (₹ in Cr) Q4 2024-2025 Q4 2023-2024 0 800 1600 2400 3200 4000 3,229 2,550 EBITDA (₹ in Cr) Q4 2024-2025 Q4 2023-2024 0 500 1000 1500 2000 2500 3000 3500 3109 2,461 PBT (₹ in Cr) Q4 2024-2025 Q4 2023-2024 0 500 1000 1500 2000 2500 2,325 1,845 PAT (₹ in Cr) Q4 2024-2025 Q4 2023-2024 0% 5% 10% 15% 20% 17% 14% Operating Margin (in %) Q4 2024-2025 Q4 2023-2024
Page 15
QUARTERLY PERFORMANCE (CONSOLIDATED) Q4 OF FY 2024-25 500 1500 2500 3500 3174 3144 3104 Revenue from Operation (₹ in Cr) Q4 2024-2025 Q3 2024-2025 Q4 2023-2024 1500 2000 2500 3000 3500 3484 3430 3452 Total Income (₹ in Cr) Q4 2024-2025 Q3 2024-2025 Q4 2023-2024 100 400 700 1000 1300 400 1104 873 EBITDA (₹ in Cr) Q4 2024-2025 Q3 2024-2025 Q4 2023-2024 0 300 600 900 1200 370 1063 849 PBT (₹ in Cr) Q4 2024-2025 Q3 2024-2025 Q4 2023-2024 0 300 600 900 325 807 663 PAT (₹ in Cr) Q4 2024-2025 Q3 2024-2025 Q4 2023-2024
Page 16
YEARLY PERFORMANCE (CONSOLIDATED) FY 2024-25 0 3000 6000 9000 12000 11432 9,467 Revenue from Operation (₹ in Cr) Q4 2024-2025 Q4 2023-2024 0 3000 6000 9000 12000 15000 12553 10,568 Total Income (₹ in Cr) Q4 2024-2025 Q4 2023-2024 0 1000 2000 3000 4000 3181 2,513 EBITDA (₹ in Cr) Q4 2024-2025 Q4 2023-2024 0 500 1000 1500 2000 2500 2414 1,937 PAT (₹ in Cr) Q4 2024-2025 Q4 2023-2024 0 600 1200 1800 2400 3000 3600 3062 2,425 PBT (₹ in Cr) Q4 2024-2025 Q4 2023-2024 0% 5% 10% 15% 20% 17% 14% Operating Margin (₹ in Cr) Q4 2024-2025 Q4 2023-2024
Page 17
Shipbuilding P15B Destroyers P17A Stealth Frigates Others P75 Kalvari Submarines Medium Refit and Life Certification (MRLC) of Submarines Particulars Submarine and Heavy Engineering 32260Total Order Book as on, 31st March 2025 * Balance Order book is including pending work/supply of spares of delivered vessels Particulars Nos. (Contracted) Nos. (Pending to be delivered) Project Value (INR Cr) Balance (INR Cr) Client Shipbuilding Submarine & Heavy Engineering P17A Stealth Frigates P15B Destroyer P75 Kalvari Submarines Multipurpose Hybrid Powered Vessel ICGS (CTS,NGOPV,FPV) 28769 4 MOD 3716 0 27120 4 MOD 13493 3 2849 21 MOD 2829 21 715 6 MOD 690 6 29078 6 MOD 2493 0 2381 1 MOD 1711 1 6524 3 ONGC 5409 3 1758 1 MOD 1749 1 256 Other 169 ONGC (PRPP , DSF II & PRP 8 Grade A) AIP
Page 18
Financial Year Dividend (Declared Basis) Dividend (Paid Basis) Dividend declared for the year Dividend per share Dividend paid during the year Dividend per share 24-25 121.01 (Second Interim) 14.595 832.98 20.65467.72 (First Interim) 23-24 553.64 13.725 447.75 11.1 22-23 321.90 7.98 216.41 5.365 21-22 176.08 4.365 180.11 4.465 20-21 146.02 3.62 155.28 3.85 19-20 207.51 4.745 217.16 4.845 The last 5 years dividend distribution data on Declared and Paid basis is as under: MDL handed over Second Interim Dividend of Rs.98.29 Cr. for FY 2024-25 cheque to Hon’ble RM Shri Rajnath Singh. First Interim Dividend declared and paid by MDL for FY 2024-25; Rs.467.72 crore i.e. Rs.23.19 per share (on face value Rs.10), which is the highest ever. Second interim dividend for the FY 2024-25, amounting to Rs.121.02 crore this equates to a payout of Rs.3 per share (on face value Rs.5). 4.85 3.85 4.47 5.37 11.10 20.65 0.00 5.00 10.00 15.00 20.00 25.00 19-20 20-21 21-22 22-23 23-24 24-25 Dividend Paid Basis
Page 20
MDL Received Best Overall Financial Performance Award-2025
Page 21
MDL has won the 11th National Awards for Excellence in CSR & Sustainability in the field "Concern for Health" on 20th Sep 2024 at Bengaluru. MAJOR AWARDS MDL has received the Dun & Bradstreet Public Sector Excellence Award 2024 under "Defence Production (CPSU)" category.
Page 22
MAJOR AWARDS MDL Awarded Global Inclusion Award 2024 under “ DEI Power Champion”
Page 23
MDL Received CII Award for ‘’Top Industry Excelling in Women in STEM 2024’’ – 19.11.2024 MDL is honoured to receive the Pioneer in Technology Award for Driving Inclusive Transformative Impact through Tech-Enabled CSR at the Indian Institute of Technology, Madras.
Page 25
MAJOR EVENTS Mazagon Dock Shipbuilders has been conferred "Navratna" status by the Department of Public Enterprises. MDL is the 21st PSU, first amongst the government owned shipyards and 3rd amongst Defence PSU’s of the country having “Navratna” Status. NAVRATNA
Page 26
MAJOR EVENTS Defence Secretary Giridhar Aramane unveiled a commemorative coin of Face Value of Rs. 250 on the occasion of 250th anniversary of Mazagon Dock Shipbuilders Limited on May 14, 2024. Foundation Stone Laid by Defence Secretary of the additional Land acquired from MbPA admeasuring 58887.04 sq.mtrs on long term lease basis for a period of 29 years w.e.f 01/04/2024.
Page 27
MAJOR EVENTS Mazagon Dock Shipbuilders Limited (MDL) has signed individual Shipbuilding contracts with a European client for construction of an additional three (3) 7500, DWT Multi-Purpose Hybrid Powered Vessels (MPHPV),valued at approximately 43 million USD. With this company has secured an Export order for construction of total 6 Nos. MPHPVs, amounting to approximately 85 million USD. MDL received 2nd order for MRO of Helicopter from the Nepal Army.
Page 28
MAJOR EVENTS MDL Launched SaurShakti, the nation’s fastest solar-electric boat developed through a ground breaking collaboration between Mazagon dock Shipbuilders Limited and M/s NavAlt (NavAlt solar electric boat Pvt Ltd.), this vessel represents a paradigm shift in eco-friendly Maritime Transportation. MDL launched 24 PAX Hydrogen fuel cell boat on May 14, 2024.
Page 29
MAJOR EVENTS Mazagon Dock Shipbuilders (MDL) has received a Notification of Award of Contract on 08 August 2024 from Oil & Natural Gas Corporation (ONGC) for Wellhead Platform and Associated Pipeline Project (DSF-II) on EPC reimbursable basis (OBE) at the ceiling price of Rs 4,676.32 crore. MDL received a work contract on 5th September,2024 from Oil and Natural Gas Corporation Ltd (ONGC) for the Pipeline Replacement Project 8 Group A (PRP 8 Group A) at the ceiling price of Rs 1486.40 Crores.
Page 30
MAJOR EVENTS MDL started production of First Multi-support Cargo Vessel for Navi Merchants, Denmark.
Page 31
MAJOR EVENTS MDL Took Over a Charge Certificate of MbPA land.
Page 32
OTHER EVENTS Tree Plantation at Anik Chembur “Ek Ped Maa Ke Naam”.
Page 33
MDL’s remarkable contribution ensures that India remains at the forefront of naval power, securing its waters with indigenously built world- class warships and submarines.
Page 34
On January 15, 2025,Prime Minister Narendra Modi commissioned three indigenously built naval vessels-INS Surat, INS Nigiri, and INS Vaghsheer- at the Naval Dockyard in Mumbai. This historic tri- commissioning, the first of it’s kind, underscores Mazagon Dock Shipbuilders Limited’s (MDL) advanced shipbuilding capabilities and India’s commitment to self- reliance in defense manufacturing. The addition of these state-of- the-art combatants significantly enhances India’s maritime security, reflecting the nation’s growing prowess in indigenous defense production
Page 35
Delivery of Fourth Destroyer of the P15B Class ‘SURAT’ to Indian Navy on 20th December 2024.
Page 36
Delivery of First Stealth Frigate of the P17A Class ‘NILGIRI’ to Indian Navy on 20th December 2024.
Page 37
Delivery of Six Scorpene Submarine “VAGHSHEER” of Project P-75 on 09th January 2025.
Page 38
MOD inks Rs 1,990 crore contract with MDL for construction of Air Independent Propulsion Plug for DRDO-AIP system & its integration into conventional submarines to enhance their endurance. The contract was signed in the presence of Defence Secretary Shri Rajesh Kumar Singh in New Delhi on December 30, 2024. MDL is proud to be a partner in this unique program and to significantly contribute towards the #Atmanirbharbharat initiative.
Page 39
MDL a Navratna DPSU, commenced the Production activity for the First Patrol Vessel (FPV) of 14 FPVs Project Along with this, plate cutting of 2nd Ship of Next Generation offshore Patrol Vessels (NGOPVs) for Indian Coast Guard (ICG) on 19th Dec’ 2024.
Page 40
2nd Edition Mazdock Mumbai 10K Run Marks Mazagon Dock Shipbuilders Limited 250th Anniversary Milestone on 15th December,2024.
Page 41
Keel Laying Ceremony 01 Training Ship (Yard -16101) for Indian Coast Guard.
Page 42
Commencement of Steel Cutting FPV2(Yard-16502), NGOPV3(Yard-16403) Project-14PVs & 06NGOPVs for Indian Coast Guard.
Page 43
Commencement of Steel Cutting FPV3(Yard-16503),FPV4(Yard-16504) Project-14PVs & 06NGOPVs for Indian Coast Guard.
Page 44
Mazagon Dock Shipbuilders Limited honored International Women’s Day with a grand celebration. The event featured the awe inspiring presence of Padmshri Arunima Sinha, the first female amputee to scale Mount Everest, who shared her remarkable journey and insights with the female workforce of the organization
Page 45
धन्यवाद Thank You