Techno Electric & Engineering Company Limited Investor Presentation Quarter Ended June 2025
Page 4
Q1FY26Analysing Quarterly Financials Revenue (in million INR) EBIDTA Margin (%) EBIDTA (in Million INR) Interest Cost (in Million INR) Other Income (in Million INR) PAT (in Million INR) Q1FY26Q1FY25 4137.413460.72 Q1FY26Q1FY25 Q1FY26Q1FY25 Q1FY26Q1FY25 Q1FY26Q1FY25 Q1FY26Q1FY25 6759 3657 5153 4137 804 565 15.60% 13.66% 578 232 991 556 121 21
Page 5
FY 24-25Analysing Yearly Financials Revenue (in million INR) EBIDTA Margin (%) EBIDTA (in Million INR) Interest Cost (in Million INR) Other Income (in Million INR) PAT (in Million INR) FY25FY24 4137.413460.72 FY25FY24 FY25FY24 13.66%FY25FY24 FY25FY24 FY25 FY24 24017 16808 3280 2269 101 164 13.66% 13.50% 4281 2697 1755 1314
Page 6
TEECL Financials over the Years (EPC)Credible partner with healthy financials and strong liquidity position; project finance expertise Revenue (in million INR) EBIDTA (in Million INR) PBT (in Million INR) FY 23-24FY 22-23FY 21-22FY 20-21 FY 24-25 24,01716,8089,5939,9247,917 3,2802,2691,1291,5341,436 48573,3451,0221,4711,372 FY 23-24FY 22-23FY 21-22FY 20-21 FY 24-25 FY 23-24FY 22-23FY 21-22FY 20-21 FY 24-25
Page 7
With Balance SheetAnnual Financials (in Millions INR) FY-2025FY-2024FY-2023Shareholders' Funds 376702191719580Security Deposits 550000Deferred Tax Liabilities849698724Other Liabilities and Provisions28493571843Total 468682297322147 (in Millions INR) FY-2025FY-2024FY-2023Net Fixed Assets 389442492Investments (in subsidiaries)64811623617Loan and Advances 4186401146Cash and Bank Balance252061163614230Current Assets 196551452012483Current Liabilities 904856495820Net Current Assets 1060788716662Total 468682297322147 Sources of Funds Application of Funds
Page 8
Segment-wise order book for the quarter ended 30th June 2025EPC Order BookShare (%)Client NameAmount(Millions)22.08%Power Grid Corporation of India Ltd.22,983 9.86%Rajasthan Rajya Vidyut Prasaran Nigam Ltd. 10,266 9.57%Adani Energy Solutions Limited9,962 7.85%Smart meter from J&K DISCOM 8,167 7.35%Indigrid (Ishanagar and Dhule)7,650 7.27%Nepal MCA7,566 4.98%Assam Electricity Grid Corporation Limited5,181 4.69%Smart meter from Ranchi DISCOM 4,886 4.27%NERES XVI, POWER TRANSMISSION LTD, GOGAMUKH 4,443 22.08%Others 22,978100%Total1,04,080 Generation(FGD)10,266 MnINR Transmission71,272 MnINR DistributionDistribution1,043 Million INRSmart Meter (DBFOT/TOTEX)20,875 Million INR21,918 MnINR Data Center624 MnINR EPC64,395 Million INR TBCB Asset68,77 Million INR *Note: We are L1 in orders worth Rs 711 crores as on 30th June 2025.
Page 9
Leveraging Opportunities in Transmission and Distribution TransmissionMarket of3,56,853Crores Techno is targeting forRs 2000 - 2500 crores annually.CurrentOrder Book isRs 7127 Crores Techno is targeting forRs 1500 - 2000 croresannually.CurrentOrder Book isRs 2087 CroresSmart MeterMarket of80,347Crores
Page 10
Leveraging Opportunities in Power Generation FGDMarket of79,530 Crores 42,847 Crores 36,683 Crores Techno is targeting forRs 500 crores everyyear in this segmentCurrentOrder Book isRs 1027 Crores Bids openedUnder various stagesBefore bidding
Page 11
Techno Chennai DC Techno Kolkata DC Aligned to the Big PictureOur Data Center Vision Visakhapatnam Amaravati Patna Chandigarh Ahmedabad Vadodara Gurugram Faridabad Bengaluru Bhopal Indore MumbaiPune Nagpur Bhubaneshwar Jaipur Coimbatore Hyderabad Lucknow We have secured a concession from RailTel to build a hyperscale Data Center of 18 MW in Noida. The construction work for the same is going on and we expect a partial commissioning in H2FY26. Additionally, the map highlights the Hyperscale facilities of Chennai and Kolkata Data Centers, which are set to act as the Central Data Center hub for all the Edge locations. The Map shows the 102 cities of EDGEData Centers across India Techno Data Center in Chennai is commissioning soon Techno Data Center in Kolkata will be commissioning in 2027 The Edge Data Centers will be developed in phases, with 20 edge data centers planned for each phase. The locations of the first phase are marked on the map with RED pins. First Phase 20 Edge Locations Other Phases Edge Locations Hyperscale Data Centers Noida DC
Page 12
ØAll civil work has been completed, and MEP work is currently underway. ØThe data center is scheduled to be commissioned at the end of August 2025. ØThe construction will be completed in phases, with the first phase of 5.6 MW currently under development. ØOnce the first phase is commissioned, each subsequent phase will be completed within six months, depending on customer acquisition. Chennai Data Center Status Work in ProgressChennai Data Center
Page 13
4-acre Land acquired Set up Data center in Kolkata with Capacity of 13 MW Site already in Possession of TEECL Topographic survey is done The schematic design is completed, and construction work has started. The Plot is surrounded by multiple Data center companies like NTT, STT, CTRLs, Digital Reality, & Adani Connex.LocationDistance from TEECL SiteHighway (Belghoria Expressway)5 kmArterial Route (Biswa Bangla Sarani)225 metersKolkata International Airport1.5 km In construction phaseKolkata Data Center
Page 14
Techno Data Center Roadmap vInitial surveys are now underway, assessing each site’s potential to bring data infrastructure closer to key markets and communities, paving the way for enhanced connectivity and efficiency across the country. Gurugram EDC was commissioned in July 2025 and is now LIVE. Gurugram Work started and will be completed by the end of October 2025. Mumbai The first phase of the 5.6 MW IT load capacity is planned for commissioning at the end of August 2025. Chennai Work started and will be commissioned by the end of June 2027. Noida Followed by 12 high-potential sites across India, marking the first phase of this ambitious nationwide initiative, targeting a vast network of 102 cities across India. 12 Locations
Page 16
Electricity demand projection and Installed Generation CapacityPower Sector 230144244565260118277201294716313098334811350670366393 2023-242024-252025-262026-272027-282028-292029-302030-312031-32Peak Electricity Demand (MW) 5200 74461300013080 13500248245244692992 206146235133 52007446130013080 8680248245244672896 185566235133 Sma ll HydroPSPBi omassNu clearBESSGasHydroWindSolarCoal NEP Volume-1 GenerationTransmission Planning Electricity demand projection for the year 2023-24 to 2031-32 Installed Generation Capacity (MW) likely by 2026-27 for the purpose of transmission planning and NEP (Volume 1) Generation 5.98% CAGR2023-2032 **Source: cea.nic.in
Page 17
Air Quality Control Solution: FGD Status of FGD Implementation in India in MW As per, Gazette notification (GOI) all Thermal Power Plants need to limit their sulphur emission. Total Target is 211.52 GW vOf these, around 19.43 GW is already installed, and bids for 102 GW are already awarded.vBids for 43.98 GW has been opened vAround 36.68 GW are around various stages before being awarded. We have already commissioned a 500 MW project from DVC (Rs 3190 million) and are executing an order worth Rs 14550 million from Rajasthan Rajya Vidyut Nigam Ltd. We have tenders worth Rs 1000 crores under bidding in the pipeline. **Source: https://pib.gov.in/PressReleaseIframePage.aspx?PRID=2040090#:~:text=Posted%20On:%2001%20AUG%202024,about%2044%20to%2048%20months. Under various stages before biddingBids OpenedBids AwardedFGD Installed 36,683 43,987102,040 19,430
Page 19
Transmission System augmentation required during the period 2022-27Power Sector 0100000200000300000400000500000600000700000 76 5 kV40 0 kV23 0/2 20 kVFY-2017 EndFY-2022 EndFY-2027 End Sub-stations (in MVA) Total Sub-stations (in MVA) 721265 1070950 1781890FY 2017 endFY 2022 endFY 2027 end •14,625 ckm of transmission lines and 75,902 MVA of transformation capacity has been commissioned during 2022-23. •7,026 ckm of transmission lines and 29,521 MVA of transformation capacity has been commissioned (October 2023). 050001000015000200002500030000350004000045000 BI-POLE LINK CAPACITYFY-2017 EndFY-2022 EndFY-2027 End HVDC (in MW) Total HVDC (in MW) 19500 33500 45500FY 2017 endFY 2022 endFY 2027 end
Page 20
Opportunities in Power Transmission for TEECL Increased Volume of Substation work for TEECL Transmission LineSubstation Transmission LineSubstation 80% Pre 2023 Post 2023 60%40%20% Higher Capex coupled with higher Substation proportion will bring larger volumes for Substation work Opportunity from Increased participation of Private Sector in Power Transmission in India Number of Transmission schemes under Implementation 20 21 H - Resurgent Power Transmission LimitedG - Indi Grid LimitedF - GR Infra Projects LimitedE - Megha Engineering and Infra D - Apraava Energy Private LimitedC - ReNew Transmission Ventures Pvt. Ltd.B - Adani Transmission LimitedA - Sterlite Power Limited 111 223 4 7 POWERGRID PowerGrid 49% Other Private Players 51% ** Data as on 31st December 2023 FH EDC B A G
Page 21
Advancing with Experience and Expertise : Smart Metering Number of Smart Meters deployed by various Nodal Agencies Total Sanctioned Smart Meters by Government Schemes Total SanctionedSmart Meters Total InstalledSmart MetersTotal AwardedSmart Meters Overview Report on Smart Meter Deployment in India 22,37,56,9903,68,79,46314,34,10,333 **Source: nsgm.gov.in Total Awarded Smart Meters Total Installed Smart MetersTotal Sanctioned Smart Meters
Page 22
Techno AMI Projects vLocation: Tripura, AgartalavTotal No. of Smart Meters to be Installed: 4,27,013vDuration: June 2024 to June 2034vProject Implementation Agency: TSECL Tripura State Electricity Corporation Limited vLocation: Ranchi, JharkhandvTotal No. of Smart Meters to be Installed: 5,33,733vDuration: June 2024 to June 2034vProject Implementation Agency: JBVNL Jharkhand Bijli Vitran Nigam Limited vLocation: KashmirvTotal No. of Smart Meters to be Installed: 7,27,584vDuration: June 2024 to June 2034vProject Implementation Agency: RECPDCL Jammu & Kashmir Project 3 vIn Phase 1 in EPC, Techno has installed 1,27,000 smart meters in J&K.vIn Phase 2 Techno has installed 1,16,040 smart meters in Srinagar and 1,16,171 smart meters in Jammu.vUnder RDSS in Indore, Techno has installed 4,13,324 smart meters. TEECL has been awarded the following 4 AMI contracts to Install and Operate 2.24 million units worth INR 2612 Crores. vLocation: Indore, Madhya PradeshvTotal No. of Smart Meters to be Installed: 5,53,013vDuration: December 2023 to December 2033vProject Implementation Agency: MPPKVVCL M.P. Paschim Kshetra Vidhut Vitran Co. Ltd. vUnder RDSS in Kashmir, Techno has installed 1,08,766 smart meters.vUnder RDSS in Tripura, Techno has installed 97,495 smart meters.vUnder RDSS in Jharkhand, Techno has installed 1,85,538 smart meters. **Note: Data as on 18th August 2025
Page 24
DC Supply and Demand in IndiaData Center Industry Overview Total Area inSquare feet **Source: CBRE report and JLL report on India DC Outlook in 2024 covering markets of Mumbai, Chennai, Bangalore, Pune, Kolkata, Delhi NCR and Hyderabad only. 19 MillionTotal Area inSquare feet 29 Million Total ITCapacity 1255 MW Total ITCapacity 1628 MW Existing DC Stock(As of Oct 2024) Future DC Stock(As of Dec 2026)
Page 25
The increased usage of OTT platforms, social media, gaming and the advent of AI has spurred demand for the DC industry in India. Data Center Industry Market Enablers As most industries adopt AI, the need for computing resources to store huge volume of data will only get bigger hereon **Source: Anarock, JLL, TRAI, Economic Survey, IBEF, Nokia Broadband Index 2022, Cable.co.uk 2023, BCG Nasscom Report on AI-powered tech services
Page 26
TECHNO’s End-to-End Solutions for DATA CENTER Design &EngineeringCommission
Page 27
Commissioning soonChennai Data Center CONSULTANTS PARTNERS
Page 28
INFRASTRUCTURESupply, install, and commission both Non-IT and IT infrastructure for the Edge Data Centers – Modular Infrastructure Solution to be deployed BUSINESS MODEL1.Sale of offered Data center solutions and manage the Business operation2.Revenue sharing with RailTel EDGE Data Centers Blueprint
Page 29
EDGE Data Centers Competitive Advantage Statement (CAS) All EDC sites will be connected to RailTel's extensive optic fiber network, which spans 70,000+ km and runs parallel to the railways track covering the length and breadth of India. RCIL exclusively provides the option for connection via dark fiber. Additionally, all EDCs will be inter-connected to the Chennai and Kolkata data center using dark fiber. Access to prime locations in cities that are in high demand and difficult to acquire. Examples of such locations include Mahalaxmi, South Bombay and Sector 44, Gurugram, which is only ~3 km away from Golf Course Road, Gurgaon. For the first time in the industry, almost 60% of these EDCs will be powered by renewable energy at the most competitive rates of INR 7.5-9 per unit, in contrast to the INR 9-12 per unit available through DISCOMS at 11 or 33 kV. FIBER LAND POWER
Page 30
Techno combined solutions with Chennai, Kolkata and Edge Data CentersThe Hybrid Infrastructure of Chennai (36 MW Load) and Kolkata (20 MW load) Data Center combines Centralized Processing Power with the Low-latency Benefits of our edge data centers across 102 locations, enabling businesses to process data closer to the source while leveraging the Chennai and Kolkata Data Center’s Computational Resources.Centralized management and monitoring tools shall provide visibility across all our data centers, enabling vProactive managementvPerformance optimizationvRapid response to issues across the entire infrastructure CentralizedManagement Set up and manage a central NOC and SOC, equipped with comprehensive IT tools, including a CRM system that features billing capabilities and a business portal. This robust network of Edge Data Centers will be seamlessly interconnected with hyperscale data centers, ensuring that cloud services and other IT-managed services are delivered closer to the end customer. ManagedServicesRoadmap A unified operational framework will be implemented across the Chennai and Kolkata data centers and all edge locations, ensuringvOperational policiesvFaster speed of executionvRegulatory compliance UnifiedOperationalFramework The integration of Chennai and Kolkata data centers with Edge Data Centers is a testament to our commitment to a Secure, Adaptable, and Efficient Data Management Solution, ready to meet the demands of the evolving Digital World. We aim to operate a network of hyperscale and edge data centers with industry's Least Latency in the country.
Page 32
completed since inception 450+ Projects 574 Professionalsin team (engineering, commercial, graduates, Post-graduates ) 40+ YearsRich experience in the power sector BSE,NSE ListedHas a market cap of US $2.17 Billion as on 30th June 2025Debt FreeCompanyZero debt on books AA Long TermStable credit rating TEECL is one of the most attractive company in Electro-mechanical works in IndiaAbout Techno Electric & Engineering Co. Ltd.
Page 33
Key MilestonesAbout Techno Electric & Engineering Co. Ltd.
Page 34
Techno’s 360-Degree Presence in Power SectorAbout Techno Electric & Engineering Co. Ltd.
Page 35
Business Verticals – 360 Degree Presence in Power & Related Infrastructure Opportunities EPC Business►Transmission Projects►Specializing in EHV Substation up to 765 kV.►Distribution Management system.►Flue Gas Desulphurization►Turnkey Solutions for Captive Power Plants.►Offsite works and power distribution systems for power intensive industries.►Plant Electrical and Illumination System (MV/LV). * BOOT- Build, own, operate and transfer# DBFOOT- Design Build Finance Own Operate and Transfer@ BOM- Build, Operate Maintain Smart Metering►Won the contract for implementation of Advanced Metering Infrastructure (AMI) Service Provider for Smart Prepaid Metering on DBFOOT# basis in 4 states.►Total Project Tenure is of 120 (27 +93) months.►4 projects are under various phases of Installation.►1 project has entered the implementation phase. Data Center►Currently, Company is building 2 own data centers of its own with total capacity of 40 MW (IT Load) in Chennai (24 MW) and Kolkata (16 MW).o5.6 Mw (IT load) of Chennai Data Center is LIVE now.►Won the contract for Edge Data Centers in 102 locations across India on BOM@ basis over the next 5 years.oContract shall be valid for period of 20 years including implementation time period. (extendable by 5 years)o1 Edge Data Center is commissioned in July 2025.►Plans to build and own 250 MW capacity Data Centers over the period of next 5 years of its own. ►Bidding for the Transmission Projects under TBCB Scheme of the government on BOOT* model.►Won 5 projects under the scheme.►3 projects have been commissioned and monetized.►2 projects are under development phase and shall be completed by FY27.oThe 2 projects will give a total revenue of ~2800 Cr yield a levelized tariff of ~10% .oProject tenure- 2+ 35 years►Strong pipeline in bidding matching with deployment of 500 GW of renewal power target of Govt. by 2030 TBCB BusinessEPC BusinessAsset Creation BusinessAsset Holding Business
Page 36
Journey So FarAbout Techno Electric & Engineering Co. Ltd.
Page 37
Business is rapidly growing and reaching a turning pointTechno’s Growth Journey
Page 38
Extensive experience of working with Govt, and reputed private customers in India The Company follows the operating philosophy of ‘Once a customer, always a customer’. * The above client names are based upon current order book. Asset Base and Customer Overview 1 TEECL has served CPSUs, State-run utilities in the following:- Building 50% of India’s national grid 2 Engaging with over 50% of power generating projects in various capacities 3 Experience in multi-year engagements with marquee Navratana CPSUs/State Utilities
Page 39
DisclaimerThis presentation may include statements that constitute forward-looking statements. All statements that address expectations or projections about the future, including, but not limited to, statements about the strategy for growth, business development, market position, expenditures, and financial results, are forward-looking statements. Forward-looking statements are based on certain assumptions and expectations of future events. The company cannot guarantee that these assumptions and expectations are accurate or will be realized. The actual results, performance or achievements could thus differ materially from those projected in any such forward-looking statements.The information contained in these materials has not been independently verified. None of the companies, its Directors, Promoters or affiliates, nor any of its or their respective employees, advisors or representatives or any other person accepts any responsibility or liability whatsoever, whether arising in tort, contract or otherwise, for any errors, omissions or inaccuracies in such information or opinions or for any loss, cost or damage suffered or incurred howsoever arising, directly or indirectly, from any use of this document or its contents or otherwise in connection with this document and makes no representation or warranty, express or implied for the contents of this document including its accuracy, fairness, completeness or verification or for any other statement made or purported to be made by any of them or on behalf of them and nothing in this document or at this presentation shall be relied upon as a promise or representation in this respect, whether as to the past or the future. The information and opinions contained in this presentation are current and, if not stated otherwise, as of the date of this presentation. The company undertakes no obligation to update or revise any information or the opinions expressed in this presentation as a result of new information, future events or otherwise. Any opinions or information expressed in this presentation are subject to change without notice.This presentation does not constitute or form part of any offer invitation or inducement to sell or issue, or any solicitation of any offer to purchase or subscribe for, any securities of Techno Electric and Engineering Company Limited (the “Company”), nor shall it, or any part of it or the fact of its distribution form the basis of, or be relied on in connection with, any contract or commitment therefore. Any person/party intending to provide finance/invest in the shares/business of the company should do so after seeking their own professional advice and after carrying out their own due diligence procedure to ensure that they are making an informed decision. This presentation is strictly confidential and may not be copied or disseminated, in whole or in part, and in any manner or for any purpose. No person is authorized to give any information or to make any representation not contained in or inconsistent with this presentation, and if given or made, such information or representation must not be relied upon as having been authorized by any person. Failure to comply with this restriction may constitute a violation of the applicable securities laws. The distribution of this document in certain jurisdictions may be restricted by law, and persons into whose possession this presentation comes should inform themselves about and observe any such restrictions. By participating in this presentation or by accepting any copy of the slides presented, you agree to be bound by the foregoing limitations.
Page 40