Page 2
A G E N D A 2 PART 01 Summary PART 02 Sales results and revenue perspective PART 03 Financial results PART 04 Plans of ROBYG Group PART 06 Appendices
Page 3
S u m m a r y 1 Q 2 0 2 6 P A R T 01 3
Page 4
Revenues 316 mln PLN Operating cash flow 99 mln PLN (excl. purchases of new plots) 268 mln PLN 01. Summary 1Q 2026 Financial Results 1Q 2026 * Including amounts kept on individual escrow accounts. 4 Strong cash position*
Page 5
01. Summary 1Q 2026 Units presold: app. 620* (net after cancellations) 5 * Incl. 82 agreements in jointly controlled projects ** Incl. 1073 units under construction, which are not on offer and 1 315 units under construction for other entities within TAG Rent Poland. *** Net debt = interest bearing liabilities + derivatives + guarantees granted – intercompany loans – cash and cash equivalents – amounts kept on individual escrow accounts Units on offer: app. 1 850 (out of which 3% finished goods) Developer and preliminary agreementssigned: app. 650* (net after cancellations) Numberof units recognised in revenues: app. 290 Numberof units under construction: app. 7 110** Total land bank units: app. 17 820 Net debt ratio: 0,25 (Net Debt*** / Equity)
Page 6
01. Summary 1Q 2026 * Vantage Development (incl . jointly controlled projects ) and TAG Residential ( directly owned by TAG) General contractor services Number of units completed as of 31.03.2026 : General contractor services Number of units under construction as of 31.03.2026: 6 ROBYG Group’s activitiesfor other entities within TAG Rent Poland* 443 app. 1 315 Revenue from services provided to TAG Rent Poland in 1Q 2026: 82 mln PLN
Page 7
NEW PLOTS approx. 215 mln PLN ROBYG Group – material acquisitions Wroclaw Gdynia Warsaw Total expected potential for construction of ca. 104k sqm of usable area. 01. Summary 1Q 2026 7 Area of plots [ha] Type of contracts Locations 1,2 Final Warsaw, Targowek 2,2 Final Krakow, Pradnik Bialy 0,01 Final Gdansk, Wrzeszcz 4,7 Final Iwiny, near Wroclaw 10,9 Preliminary Piaseczno, near Warsaw Total: 19,0 Wroclaw Warsaw Gdansk Krakow *Agreements marked in green were signed in 2Q 2026
Page 8
Sales results & revenue perspective P A R T 02 8
Page 9
02. Sales results & revenue perspective 13% POZNAN 78 UNITS 13% WARSAW 241 UNITS 39% WROC LAW 45 UNITS 7% GDANSK & GDYNIA 244 UNITS 39% 7% 39% 39% GDANSK &GDYNIA WARSAW POZNAN WROC LAW Pre-sold units in 1Q 2026: 620* * Incl . 82 agreementsin jointlycontrolledprojects. 10 2% LODZ LODZ 12 UNITS 2%
Page 10
R O B Y G G r o u p– u n i t so n o f f e r * I n c l . 443 u n i t s o n o f f e r i n j o i n t l y c o n t r o l l e d p r o j e c t s . . 11 N u m b e rof u n i t so n offer 1540 39 3Q 2024 Un its u n d e r construction* Un its c o m p l e t e dU n i t su n d e rc o n s t r u c t i o n U n i t sc o m p l e t e d 1719** 58 1777 4 Q 2024 1 7 1 9 1579 58 1719** 58 1949 F I N I S H E D G O O D S O N O F F E R: 3% 1 9 2 6 23 1 Q 202 5 1719** 58 1948 1 8 7 3 75 2 Q 202 5 1981 79 2060 3 Q 202 5 2 202 112 2314 4 Q 202 5 02.Sales results & revenue perspective 1 787 60 1847* 1 Q 202 6
Page 11
R O B Y G G r o u p – r e v e n u er e c o g n i t i o n( a s at March 31st, 2026) Rec o gn itio n p o te n tial of u n its in reven u es : U n i t sn o t p r e s o l da n d n o t r e c o g n i z e d*: 1 847 Completed : 60 U n d e r c o n s t r u c t i o n*** : 1 787 T o t a l 2024: 2 331 U n i t sp r e s o l da n d n o t r e c o g n i z e d**: 3 182 Completed : 227 U n d e r c o n s t r u c t i o n: 2 934 W h i c h c o n s t r u c t i o n h a s n o t s t a r t e d y e t, b u t i n c l u d e di n p r e- s a l e sp r o c e s s: 21 N u m b e rof u n i t sr e c o g n i z e di n r e v e n u e s( q u a r t e r l y) 12 T o t a l 2023: 3 361 * I n c l . 443 units not presold in jointly controlled projects . ** I n c l . 615 units presold in jointly controlled projects . ***Not incl . 1073 units under construction , which are not on offer . 2071 687 412 208 4Q 2023 1Q 2024 2Q 2024 3Q 2024 4 Q 2024 1024 185 1 Q 2025 283 2 Q 2025 332 3 Q 2025 4 Q 202 5 895 T o t a l 202 5: 1 695 02.Sales results & revenue perspective 285 1 Q 2026
Page 12
Q2 2026 Growth H1 2026 Growth Contracted units c. 660 27% c. 1,280 25% Developer and preliminary agreements c. 600 6% c. 1,250 31% Handovers c. 335 18% c. 620 33% Number of contracted units in Q2 2026, on an LTM basis: c. 2,800 Value in line with the short-term strategic target 02.Sales results & revenue perspective R O B Y G G r o u p – H1 2026 S a l e s R e s u l t s
Page 13
9 D e v e l o p e r a n d p r e l i m i n a r ya g r e e m e n t ss i g n e d i n 1 H 2026 : 1250* 1019 1113 1731 2118 2333 2957 3471 2520 2156 4308 2144 2809 1 891 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 9% 56% 22% 10% 27% -27% 2% 2 5 69 -16% 100 % -50% 31% 17% -33 % Note: The data presented on this slide covers the total number of signed reservation and preliminary agreements through 2020. Starting in 2021, the figure shown represents the total number of signed development and preliminary agreements. * Incl . 82 agreements in jointly controlled projects 2 50733% 02.Sales results & revenue perspective c.1250 1H 2026
Page 14
N u m b e r o f u n i t s t o b e c o m p l e t e d i n 2 0 26 - 202 7 a n d a l s o( c o n t r a c t e d ) u n t i l M a r c h 3 1 s t 202 6 13 2026 202 7 T o t a l & c o n t r a c t e d 202 6+202 7 T o t a l units C o n t r a c t e d T o t a l units C o n t r a c t e d T o t a l units C o n t r a c t e d R y t m M o k o t o w a, W e n d y, A p a r t a m e n t y K r a k o w s k a (JV Projects ) – W a r s a w & Gdynia & Wroclaw 606 (414) 446 (201) 1 052 (615 ) M o d e r n C i t y , M e t r o L i f e A p a r t a m e n t y – W a r s a w 638 (611) 212 (173) 850 (784) S a d y U r s y n o w – W a r s a w 96 (86) - - 96 (86 ) P o r t o , K o b i e l i , L e s z c z y n s k i c h, N a d m o t l a w i e, N o w a W a l o w a – G da ns k 431 (252) 692 (342 ) 1 123 (594 ) Szumilas , Foresteria , Rosa Residence , Lawendowe Wzgorze – G da ns k & G dy ni a 586 (471) 373 (132) 959 (603 ) P o c z a t e kP i a t k o w o, E l e k t r o vn i aG a r b a r y – P o z n a n 235 (215) 232 (30 ) 467 (245 ) Li r a H o u s e A p a r t a m e n t y – L o d z - - 197 (25 ) 197 (25 ) 2 592 (2 049) 2 152 (903) 4 744 (2 952 ) - - +1 423** (10) 1 423** (10) 2 592 (2 049) 3 575 (913) 6 167 (2 962 ) +550* (+493) +397 - +947 (+493) P o t e n t i alof h a n d o v e r s 3 142 (2 542 ) 3 972 (913) 7 1 1 4 (3 455 ) 81% 23% 49% H a n d o v e r s ( e s t i m a t ed) 2 745 (2 542 ) 3 182 (913) 5 9 2 7 (3 455 ) 93% 29 % 58 % * Units completed in prior years to be recognised. ** Units planned to be completed in 2027, which sale has not started as at 31.03.2026. 02.Sales results & revenue perspective
Page 15
N u m b e ro f u n i t st o b e c o m p l e t e di n 202 6 G d ansk & Gdynia War saw Wr oc law & P ozna n 14T O T A L: 2 592 * Jointly controlled project. 02.Sales results & revenue perspective Project Total no. of units to be completed in 2026 Nadmotławie 235 Szumilas 351 Leszczyńskich 137 Rosa Residence 108 Kobieli 59 Foresteria 127 TOTAL 1 017 Project Total no. of units to be completed in 2026 Modern City 459 Rytm Mokotowa* 420 Sady Ursynów 96 Metro Life Apartamenty 179 TOTAL 1 152 Project Total no. of units to be completed in 2026 Początek Piątkowo 235 Apartamenty Krakowska* 186 TOTAL 421
Page 16
N u m b e ro f u n i t st o b e c o m p l e t e di n 202 7 G d ansk & Gdynia War saw Wr oclaw & P ozna n 15T O T A L: 3 575** * Jointly controlled project. ** Including 1423 units planned to be completed in 2027, which sale has not started as at 31.03.2026. Project Total no. of units to be completed in 2027 Lawendowe Wzgorze 53 Nadmotlawie 212 Porto 155 Szumilas 170 Wendy* 281 Nowa Walowa 325 Foresteria 150 Other** 348 TOTAL 1 694 Project Total no. of units to be completed in 2027 Metro Life Apartamenty 212 Other** 943 TOTAL 1 155 Project Total no. of units to be completed in 2027 Elektrovnia Garbary 232 Apartamenty Krakowska* 165 Other** 132 TOTAL 529 Project Total no. of units to be completed in 2027 Apartamenty Lira House 197 TOTAL 197 Lo dz 02.Sales results & revenue perspective
Page 17
F i n a n c i a l r e s u l t s P A R T 03 16
Page 18
03. F i n a n c i a l r e s u l t s 17 * Includingrevaluationof investment propertiesto fair value (PLNk) 1Q 2026 1Q 2025 Change 2025 Revenues 316 070 171 902 83,87% 1 546 114 Sales of residential and commercial units 203 800 99 725 104,36% 1 100 345 Revenues from sales to related parties 108 895 68 566 58,82% 405 104 Other revenues 3 375 3 611 (6,54%) 40 665 Cost of sales (246 847) (136 072) 81,41% (1 167 643) Cost of units sold (139 266) (67 585) 106,06% (754 745) Costs related to services provided to related parties (103 076) (63 522) 62,27% (381 027) Other costs (4 505) (4 965) (9,26%) (31 871) Gross profit on sales 69 223 35 830 93,20% 378 471 Selling and marketing expenses (9 667) (7 604) 27,13% (36 880) Administrative expenses (17 191) (17 250) (0,34%) (70 076) Other* 2 799 7 319 (61,76%) 139 459 Operating profit 45 164 18 295 146,87% 410 974 Finance income 5 066 6 149 (17,61%) 22 059 Finance costs (4 554) (4 505) 1,09% (20 892) Profit before tax 45 676 19 939 129,08% 412 141 Income tax expense (9 039) (4 476) 101,94% (80 945) Net profit 36 637 15 463 136,94% 331 196 Net profit attributable to equity holders of the parent 35 894 15 670 129,07% 317 778 Gross profit margin on sales 21,9% 20,8% N/A 24,5% Margin on sales of residential and commercial units 64 534 32 140 100,79% 345 600 Margin on sales of residential and commercial units (%) 31,7% 32,2% N/A 31,4% Net profit margin 11,6% 9,0% N/A 21,4%
Page 19
F i n a n c i a l c o n d i t i o n 03. F i n a n c i a l r e s u l t s 18 (PLNk) 1Q 2026 2025 Change Total assets, including: 4 436 713 4 317 708 2,76% Non-current assets, including: 1 248 927 1 208 784 3,32% Investment properties and investment properties under construction 933 430 902 635 3,41% Loans granted to related parties 118 928 117 086 1,57% Inventories 2 586 567 2 466 365 4,87% Trade and other receivables 263 647 278 349 (5,28%) Amounts kept on individual escrow accounts 150 540 167 942 (10,36%) Cash and cash equivalents 117 307 139 441 (15,87%) Equity: 2 133 616 2 096 979 1,75% Total liabilities, including: 2 303 097 2 220 729 3,71% LT interest bearing liabilities 819 785 740 457 10,71% Current interest bearing liabilities 139 696 188 322 (25,82%) Current trade and other payables 310 303 335 624 (7,54%) Advances received from clients 580 149 497 143 16,70%
Page 20
S t a t e m e n t o f c a s h f l o w 03. F i n a n c i a l r e s u l t s 19 (PLNk) Q1 2026 Q1 2025 2025 Net cash flows from operating activities, including: 3 998 (46 138) (146 354) Expenditures for the purchase of new plots (94 692) 0 (408 847) Net cash flows from investing activities, including: (26 787) (159 448) (139 671) Purchase of investment properties and costs incurred in connection with them (2 008) (176 766) (180 516) Loans granted to joint ventures 0 0 (10 000) Net cash flows from financing activities, including: 655 125 914 214 708 Proceeds from bank loans and borrowings 480 290 157 956 1 283 413 Proceeds from bonds issuance 0 250 000 475 000 Repayment of bank loans and borrowings (450 889) (294 197) (1 440 569) Repayment of bonds 0 0 (61 800) Interest and commissions paid (13 693) (7 467) (55 534) Dividend Payments 0 0 0 Net change in cash and cash equivalents (22 134) (79 672) (71 317)
Page 21
D E B T - A g i n g D e b t f i n a n c i n g N o m i n a l v a l u e a n d m a t u r i t y o f b a n k c r e d i t f a c i l i t i e s a n d b o n d s a s a t M a r c h31 s t 202 6 (P L N m). 03. F i n a n c i a l r e s u l t s 20 <1 year 1-2 years 2-3 years 3-4 years Over 4 years Total BANK CREDIT FACILITIES 0 196 0 0 0 196 BANK CREDIT FACILITIES - JV Projects 0 49 29 0 0 78 BONDS 88 0 250 225 0 563 TOTAL 88 245 279 225 0 837
Page 22
L e v e r a g e a n d c o l l e c t i o n s a s a t M a r c h 31st 202 6 N e t d e b t r a t i o: ** including funds from jointly controlled projects N e t D e b t * / E q u i t y = 0,25 A m o u n t c o l l e c t e d f r o m c l i e n t s a n d s o l d p l o t si n 1 Q 202 6 * * = PLN 312 m i l l i o n A m o u n t t o b e c o l l e c t e d f r o m c l i e n t s* * = P L N 1 5 2 4 m i l l i o n based on the signed agreements with clients 21 03. F i n a n c i a l r e s u l t s * Net debt = interest bearing liabilities + derivatives + guarantees granted – intercompany loans – cash and cash equivalents – amounts kept on individual escrow accounts N e t d e b t * / ( E q u i t y + N e t D e b t* ) = 0,20
Page 23
Plan s o f R O B Y G G r o u p P A R T 04 23
Page 24
04. Plans of ROBYG Group Strategic goals 24 Realisationof the ESG strategy Maintaining of the land banklevel Residentialsales in 2026 at the level of approx. 2.8-3.0k units*. Progressively scale annual pre-sales to reach a target of approx. 4.5-5k units* in the mid term Expansion of operations in major Polish cities, including Krakow Maintainingof margins * Incl. units in jointly controlled projects.
Page 25
Ne w co -o pe r a t ion sche m e 25 A r e a s R O B Y G G r o u p V a n t a g eD e v e l o p m e n t G r o u p L e g a ls t r u c t u r e s S e p a r a t ec a p i t a lg r o u p s B u s i n e s s s e g m e n t C o n s t r u c t i o n a n d s a l e o f r e s i d e n t i a l a n d c o m m e r c i a l u n i t s P R S ( p r i v a t e r e n t e d s e c t o r) – f l a t s f o r r e n t F i n a n c i n g Own funds and external financing Activities funded by TAG and external financing M a n a g e m e n t s t r u c t u r e P a r t i a l l y s h a r e d m a n a g e m e n t t e a m s w i t h c l e a r l y d e f i n e d r e s p o n s i b i l i t i e s a n d d e c i s i o n- m a k i n g a u t h o r i t y f o r e a c h b u s i n e s s l i n e , s u p p o r t e d b y f o r m a l i z e d c o r p o r a t e g o v e r n a n c e a n d r e p o r t i n g f r a m e w o r k s. T r a n s a c t i o n sb e t w e e n g r o u p s P r o v i d e do n m a r k e t t e r m s. Strategy for the operational and business activities of the ROBYG Group agreed with TAG Immobilien AG (hereinafter: "TAG") for all TAG activities on the Polish residential market, i.e. for the activities of the ROBYG Group and Vantage Development S .A. 04. Plans of ROBYG Group
Page 26
04. Plans of ROBYG Group 26 Planned changes regarding Landbank Landbank units to be sold to VANTAGE 2 905 Units to be purchased from VANTAGE 1 407 Total number of units to be completed by ROBYG 17 824 Landbank units ROBYG TOTAL 19 322
Page 27
04. Plans of ROBYG Group * Preliminary land purchase agreements. ** Units for which presale has already begun (as at 31.03.2026) not included. On which 1 352 units in jointly controlled projects. Total land bank 17 824** units + 1 847 units on offer = 19 671 units Gdansk&Gdynia Warsaw Krakow Poznan TOTAL**: Gdansk & Gdynia + Warsaw + Wroclaw + Poznan + Lodz + Krakow = 17 824 units 27 Lodz District Number of units % Srodmiescie 182 31% Other* 413 69% TOTAL: 595 units - 3% Wroclaw District Number of units % Pradnik Bialy 265 100% TOTAL: 265 units - 1% District Number of units % Piatkowo 442 18% Ostrow Tumski 1 054 42% Rataje 670 26% Other* 355 14% TOTAL: 2 521 units - 14% District Number of units % Zaspa 431 11% Srodmiescie 1 131 29% Kowale 420 11% Wielki Kack 607 15% Oliwa 491 13% Obluze 128 3% Olszynka 238 6% Other* 480 12% TOTAL: 3 926 units - 22% District Number of units % Wilanow 586 7% Ochota 516 6% Bialoleka 1 160 13% Bemowo 235 3% Ursus 175 2% Tarchomin 12 <1% Wlochy 430 5% Targowek 344 4% Mokotow 499 6% Other* 4 569 54% TOTAL: 8 526 units - 48% District Number of units % Krzyki 249 12% Stare Miasto 295 15% Fabryczna 676 34% Iwiny 132 7% Other* 639 32% TOTAL: 1 991 units - 11%
Page 28
04. Plans of ROBYG Group Commercial potential = 71 500 sqm of usable area TOTAL: 71 500 sqm WROCLAW 24 000 28 WARSAW 17 500* GDANSK 30 000* * Usable area to be sold to Vantage Group.
Page 29
A p p e n d i c e s P A R T 0 5 29
Page 30
Years at ROBYG: 17 ▪ CEO since 2022 ▪ COO 2009–2022 Eyal Keltsh President, Management Board, CEO Oscar Kazanelson Chairman of the Supervisory Board Years at ROBYG: 20+ ▪ Chairman of the Supervisory Board Years at ROBYG: 20+ ▪ CDO since 2019 ▪ CFO 2007–2019 Years at ROBYG: 15 Alex Goor Chairman of the Supervisory Board ROBYG Construction Years at ROBYG: 20 Rafal Michalski Director of the Technical Department, CEO, ROBYG Construction Years at ROBYG: 20 Joanna Chojecka Director of Sales and Marketing in Warsaw, Wroclaw, Lodz and Krakow Years at ROBYG: 13 Anna Wojciechowska Director of Sales and Marketing in Gdansk, Gdynia and Poznan Years at ROBYG: 16 Filip Cackowski Deputy CFO, CFO, ROBYG Construction Years at ROBYG: 11 ▪ CFO since 2021 Marta Hejak Deputy President, Management Board, CFO 05. Appendices ROBYG – Management Team Years at ROBYG: 20+ Wojciech Gruza Director of the Legal Department 30 Artur Ceglarz Deputy President, Management Board, Business Development
Page 31
05. Appendices Ownership Structure 31 Shareholder Number of Shares / Votes at the General Meeting Ownership Interest TAG Beteiligungs- und Immobilienverwaltungs 72,783,542 67.1% European Bank for Reconstruction and Development 6,000,000 5.5% Other 29,741,907 27.4% TOTAL 108,525,449 100.0% 67,1%5,5% 27,4% TAG Beteiligungs- European Bank for Reconstruction and Development Other
Page 32
05. Appendices T A G I m m o b i l i e n AG c o n s o l i d a t e df i n a n c i a l s( E U R m) F i n a n c i a l d a t a C r e d i tr a t i n g T A G Immob ilien AG – investor relations : w w w . t a g- ag. c o m / e n / in v e s t o r- r e latio n s A g e n cy S h o r t- t e r m R a t i n g L o n g- t e r m R a t i n g S t a n d a r d & Poor’s A - 3 BBB - , O u t l o o k P o s i t i v e Moody's P r i m e- 3 B a a 3, O u t l o o k P o s i t i v e (EURm) 1Q 2026 2025 2024 2023 2022 Assets 8 934,3 8 951,2 7 750,3 7 299,8 8 214,6 Equity 3 335,6 3 322,0 3 099,9 2 964,5 3 307,7 EBITDA (adjusted) rental business 64,3 247,6 238,5 236,4 233,5 EBITDA (adjusted) from sales business 16,0 85,5 76,6 100,6 80,8 EBITDA (adjusted) total 80,3 333,1 315,1 337,0 233,5 Consolidated net profit/(loss) 35,0 90,3 122,1 (410,9) 117,3 39
Page 33
05. Appendices Description of investments – under construction (1) Lawendowe Wzgorza / Stacja Nowy Gdansk City: Gdansk District: Jasien No. of stages: 37 Stages completed:36 Stages under construction: 1 No. of units: 3 750 units (completed: 3 697 units) Total sellable area: ca. 177.4k sqm Start of construction: Q3 2009 Planned completion date:Q3 2027 Osiedle Kameralne City: Warsaw District: Bemowo No. of stages: 7 Stages completed:6 No. of units: ca. 856 units (completed: 619 units) Total sellable area: ca. 46.2k sqm Start of construction: Q4 2010 Planned completion date: Q4 2027 33 City Sfera City: Warsaw District: Wlochy No. of stages: 14 Stages completed: 5 No. of units:1 590 units (completed: 789 units) Total sellable area: ca. 69,2k sqm Start of construction: Q3 2018 Planned completion date: Q4 2031
Page 34
Description of investments – under construction (2) Young City 2/ Metro Life Apartamenty City: Warsaw District: Bemowo No. of stages: 4 Stages completed:2 Stages under construction: 2 No. of units: ca. 537 units (completed: 146 units) Total sellable area: ca. 26,5k sqm Start of construction: Q3 2017 Planned completion date: Q3 2027 05. Appendices 34 Modern City City: Warsaw District: Bemowo No. of stages: 9 Stages completed:4 Stages under construction:5 No. of units: ca. 943 units completed: 484 units) Total sellable area: ca. 43.8k sqm Start of construction: Q4 2018 Planned completion date: Q4 2026 Osiedle Życzliwa Praga City: Warsaw District: Tarchomin No. of stages: 8 Stages completed: 7 No. of units: ca. 796 units (completed: 784 units) Total sellable area: ca. 37.9k sqm Start of construction: Q1 2019 Planned completion date: Q1 2027
Page 35
05. Appendices Description of investments – under construction (3) Nadmotlawie Estate City: Gdansk District: Srodmiescie No. of stages: 9 Stages completed: 4 Stages under construction: 2 No. of units: 1 462 units (completed: 682 units) Total sellable area: ca. 68.6k sqm Start of construction: Q1 2019 Planned completion date: Q1 2029 35 Szumilas City: Gdansk (Kowale) No. of stages: 9 Stages completed: 3 Stages under construction: 3 No. of units: 1 256 units (completed: 315 units) Total sellable area: ca. 60.6k sqm Start of construction: Q2 2021 Planned completion date: Q2 2031 Porto City: Gdansk District: Nowy Port No. of stages: 6 Stages completed: 5 Stages under construction: 1 No. of units: 908 units (completed: 753 units) Total sellable area: ca. 48.6k sqm Start of construction: Q1 2021 Planned completion date: Q2 2027
Page 36
05. Appendices Description of investments – under construction (4) 36 Poczatek Piatkowo City: Poznan District: Piatkowo No. of stages: 8 Stages completed: 5 Stages under construction:1 No. of units: 1 260 units (completed: 598 units) Total sellable area: ca. 61,6k sqm Start of construction: Q3 2021 Planned completion date: Q1 2029 Apartamenty Krakowska City: Wroclaw District: Krzyki No. of stages: 3 Stages under construction:2 No. of units: 599 units Total sellable area: ca. 31.0k sqm Start of construction: Q4 2024 Planned completion date: Q2 2028 Rosa Residence City: Gdansk District: Ujescisko No. of stages: 2 Stages under construction: 2 No. of units: 108 units Total sellable area: ca 5.6k sqm Start of construction : Q1 2024 Planned completion date: Q2 2026
Page 37
05. Appendices Description of investments – under construction (5) Sady Ursynow City: Warsaw District: Ursynow No. of stages: 3 Stages completed: 2 Stages under construction:1 No. of units: 343 units (completed: 247 units) Total sellable area: ca. 16.0k sqm Start of construction: Q2 2022 Planned completion date: Q3 2026 Rytm Mokotowa City: Warsaw District: Mokotow No. of stages: 4 Stages completed: 1 Stages under construction:2 No. of units: 747 units (completed: 169 units) Total sellable area: ca. 39.1k sqm Start of construction: Q2 2024 Planned completion date: Q4 2027 Apartamenty Lira House City: Lodz District: Srodmiescie No. of stages: 2 Stages under construction:2 No. of units: 379 units Total sellable area: ca. 15.6k sqm Start of construction: Q3 2025 Planned completion date: Q3 2028 37
Page 38
05. Appendices Description of investments – under construction (6) 38 City: Gdansk District: Brzezno No. of stages: 1 Stages under construction: 1 No. of units: 59 units Total sellable area: ca 3.5 k sqm Start of construction : Q4 2024 Planned completion date: Q3 2026 KobieliWendy City: Gdynia District: Srodmiescie No. of stages: 5 Stages under construction:3 No. of units: 806 units Total sellable area: ca. 39.2k sqm Start of construction: Q3 2024 Planned completion date: Q3 2030 Leszczynskich 2 City: Gdansk District: Ujescisko No. of stages: 1 Stages under construction: 1 No. of units: 137 units Total sellable area: ca 7.2k sqm Start of construction : Q1 2025 Planned completion date: Q4 2026
Page 39
05. Appendices Description of investments – under construction (7) 39 Foresteria City: Gdynia District: Wielki Kack No. of stages: 7 Stages under construction:3 No. of units: 881 units Total sellable area: ca. 41.6k sqm Start of construction: Q4 2024 Planned completion date: Q4 2030 Nowa Walowa City: Gdansk District: Srodmiescie No. of stages: 4 Stages under construction: 2 No. of units: 706 units Total sellable area: ca 39.1 k sqm Start of construction : Q2 2025 Planned completion date: Q3 2029 Elektrovnia Garbary City: Poznan District: Ostrow Tumski No. of stages: 12 Stages under construction: 1 No. of units: 1287 units Total sellable area: ca 79.3k sqm Start of construction : Q4 2025 Planned completion date: Q2 2032
Page 40
05. Appendices Description of investments – under construction (8) 40 Dobre Miejsce City: Gdynia District: Obluze No. of stages: 1 Stages under construction: 1 No. of units: 127 units Total sellable area: ca 6.4 k sqm Start of construction : Q1 2026 Planned completion date: Q1 2028
Page 41
05. Appendices Description of investments – completed (1) Szczesliwy Dom City: Warsaw District: Ochota No. of stages: 3 No. of units: 304 units Total sellable area: 18.1k sqm Start of construction: Q4 2005 Completion date: Q2 2008 Osiedle Zdrowa Nowa Rezydencja Krolowej Marysienki City: Warsaw District: Wilanow No. of stages: 5 No. of units: 865 units Total sellable area: 57.0k sqm Start of construction: Q1 2007 Completion date: Q1 2013 City: Warsaw District: Wilanow No. of stages: 10 No. of units: 1 350 units Total sellable area: 108.7k sqm Start of construction: Q4 2001 Completion date: Q2 2014 41
Page 42
05. Appendices Description of investments – completed (2) City Apartments City: Warsaw District:Żoliborz No. of stages: 6 No. of units: 1 190 units Total sellable area: 88.0k sqm Start of construction: Q1 2008 Completion date: Q3 2015 Osiedle Krolewskie Albatross Towers City: Warsaw District: Wilanow No. of stages: 6 No. of units: 640 units Total sellable area: 38.0k sqm Start of construction: Q2 2013 Completion date: Q4 2015 City: Gdansk District: Przymorze No. of stages: 5 No. of units: 860 units Total sellable area: 42.6k sqm Start of construction: Q2 2011 Completion date: Q3 2016 42
Page 43
05. Appendices Description of investments – completed (3) Krolewski Park City: Warsaw District: Wilanow No. of stages: 6 No. of units: 528 units Total sellable area: 27.6k sqm Start of construction: Q3 2014 Completion date: Q3 2016 Park Wola Residence Modern Żoliborz City: Warsaw District: Wola No. of stages: 1 No. of units: 317 units Total sellable area: 16.9k sqm Start of construction: Q4 2014 Completion date: Q2 2016 City: Warsaw District:Żoliborz No. of stages: 1 No. of units: 138 units Total sellable area: 7.9k sqm Start of construction: Q1 2015 Completion date: Q2 2016 43
Page 44
05. Appendices Description of investments – completed (4) Young City City: Warsaw District: Bemowo No. of stages: 9 No. of units: 1 302 units Total sellable area: 65.2k sqm Start of construction: Q3 2012 Completion date: Q4 2016 Mlody Wilanow Mila Baltica City: Warsaw District: Wilanow No. of stages: 3 No. of units: 257 units Total sellable area: 12.8k sqm Start of construction: Q4 2014 Completion date: Q2 2017 City: Gdansk District: Zaspa No. of stages: 2 No. of units: 280 units Total sellable area: 14.9k sqm Start of construction: Q3 2015 Completion date: Q3 2017 44
Page 45
05. Appendices Description of investments – completed (5) Apartamenty Villa Nobile City: Warsaw District: Wilanow No. of stages: 3 No. of units: 637 units Total sellable area: 39.1k sqm Start of construction: Q1 2016 Completion date: Q4 2017 Sloneczna Morena MoreNova City: Gdansk District: Piecki-Migowo No. of stages: 22 No. of units: 1 983 units Total sellable area: 107.8k sqm Start of construction: Q4 2009 Completion date: Q4 2018 City: Gdansk District: Piecki-Migowo No. of stages: 3 No. of units: 518 units Total sellable area: 25.0k sqm Start of construction: Q2 2016 Completion date: Q2 2019 45
Page 46
05. Appendices Description of investments – completed (6) Ogrody Wilanow City: Warsaw District: Wilanow No. of stages: 3 No. of units: 221 units Total sellable area: ca. 11.8k sqm Start of construction: Q2 2018 Completion date: Q4 2019 Green Mokotow Stacja Nowy Ursus City: Warsaw District: Mokotow No. of stages: 9 No. of units: 673 units Total sellable area: ca. 42.6k sqm Start of construction: Q2 2016 Completion date: Q4 2019 City: Warsaw District: Ursus No. of stages: 5 No. of units: 1 238 units Total sellable area: ca. 60.6k sqm Start of construction: Q2 2016 Completion date: Q4 2019 46
Page 47
05. Appendices Description of investments – completed (7) Lesna Przystan City: Wroclaw District: Osobowice No. of stages: 1 No. of units: 30 units Total sellable area: ca. 3.8k sqm Start of construction: Q1 2019 Completion date: Q4 2020 Forum Wola City: Warsaw District: Wola No. of stages: 4 No. of units: 880 units Total sellable area: ca. 47.3k sqm Start of construction: Q3 2017 Completion date: Q4 2020 Praga Arte City: Warsaw District: Praga Poludnie No. of stages: 1 No. of units: 250 units Total sellable area: ca. 12.9k sqm Start of construction: Q3 2019 Completion date: Q4 2020 47
Page 48
05. Appendices Description of investments – completed (8) 48 Willa Nad Potokiem City: Wroclaw District: Fabryczna No. of stages: 1 No. of units: 13 units Total sellable area: ca. 0.7k sqm Start of construction: Q3 2019 Completion date: Q2 2021 City: Wroclaw District: Psie Pole No. of stages: 3 No. of units: 309 units Total sellable area: ca. 14.8k sqm Start of construction: Q1 2020 Completion date: Q4 2021 Uroczysko Zajezdnia Wrzeszcz City: Gdansk District: Wrzeszcz No. of stages: 14 No. of units: 1 615 units Total sellable area: ca. 84.6k sqm Start of construction: Q4 2016 Completion date: Q2 2022
Page 49
05. Appendices Description of investments – completed (9) 49 Park Poludnie City: Gdansk District: Lostowice No. of stages: 8 No. of units: 565 units Total sellable area: ca. 24.8k sqm Start of construction: Q2 2019 Completion date: Q4 2022 Apartamenty Krolewskie City: Warsaw District: Wilanow No. of stages: 2 No. of units: 147 units Total sellable area: ca. 8.6k sqm Start of construction: Q2 2019 Completion date: Q4 2022 Wiecej City: Gdansk District: Lostowice No. of stages: 2 No. of units: 378 units Total sellable area: ca. 16.2k sqm Start of construction: Q1 2020 Completion date: Q4 2022
Page 50
05. Appendices Description of investments – completed (10) 50 Wojszyckie Alejki City: Wroclaw District: Krzyki No. of stages: 2 No. of units: 210 units Total sellable area: ca. 11.1k sqm Start of construction: Q1 2020 Completion date: Q4 2022 Praga Deco City: Warsaw District: Praga Poludnie No. of stages: 1 No. of units: 192 units Total sellable area: ca. 9.3k sqm Start of construction: Q1 2021 Completion date: Q4 2022 Mlode Stogi City: Gdansk District: Stogi No. of stages: 1 No. of units: 160 units Total sellable area: ca. 7.9k sqm Start of construction: Q1 2021 Completion date: Q4 2022
Page 51
05. Appendices Description of investments – completed (11) 51 Kameralna Olszowka City: Wroclaw District: Krzyki No. of stages: 1 No. of units: 55 units Total sellable area: ca. 3.2k sqm Start of construction: Q2 2021 Completion date: Q4 2022 Wisniowa Aleja City: Gdansk District: Ujescisko No. of stages: 2 No. of units: 200 units Total sellable area: ca. 9.6k sqm Start of construction: Q1 2022 Completion date: Q4 2023 VISTA (Mysliwska) City: Gdansk District: Piecki-Migowo No. of stages: 1 No. of units: 87 units Total sellable area: ca. 4.4k sqm Start of construction: Q2 2022 Completion date: Q4 2023
Page 52
05. Appendices Description of investments – completed (12) 52 Dożynkowa 43 Osiedle nad Widawa City: Wroclaw District: Krzyki No. of stages: 1 No. of units: 11 units Total sellable area: ca. 1.3k sqm Start of construction: Q2 2022 Completion date: Q4 2023 City: Wroclaw District: Psie Pole No. of stages: 1 No. of units: 138 units Total sellable area: ca. 6.8k sqm Start of construction: Q2 2022 Completion date: Q4 2023 Sea Salt City: Gdansk District: Zaspa No. of stages: 1 No. of units: 118 units Total sellable area: ca. 6.1k sqm Start of construction: Q4 2022 Completion date: Q2 2024
Page 53
05. Appendices Description of investments – completed (13) 53 Lagom Nowa Letnica Moment City: Gdansk District: Ujescisko No. of stages: 2 No. of units: 207 units Total sellable area: ca. 10.8k sqm Start of construction: Q2 2019 Completion date: Q4 2023 City: Gdansk District: Ujescisko No. of stages: 1 No. of units: 41 units Total sellable area: ca. 5.7k sqm Start of construction: Q3 2020 Completion date: Q4 2023 City: Gdansk District: Letnica No. of stages: 9 No. of units: 2 197 units Total sellable area: ca. 113.8k sqm Start of construction: Q1 2017 Completion date: Q4 2023
Page 54
05. Appendices Description of investments – completed (14) 54 Moj Ursus City: Warsaw District: Ursus No. of stages: 8 No. of units: 2 293 units Total sellable area: ca. 110.7k sqm Start of construction: Q3 2019 Completion date: Q4 2024 Jutrzenki 92 City: Warsaw District: Wlochy No. of stages: 1 No. of units: 142 units Total sellable area: ca. 7.0k sqm Start of construction: Q2 2023 Completion date: Q4 2024 Praga Piano City: Warsaw District: Praga Poludnie No. of stages: 1 No. of units: 218 units Total sellable area: ca. 10.9k sqm Start of construction: Q1 2024 Completion date: Q3 2025
Page 55
05. Appendices Description of investments – completed (15) 55 Royal Residence City: Warsaw District: Wilanow No. of stages: 7 No. of units: 1 112 units Total sellable area: ca. 62,5k sqm Start of construction: Q4 2021 Completion date: Q4 2025 Jagodno City: Wroclaw District: Krzyki No. of stages: 11 No. of units: 854 units Total sellable area: ca. 48.9k sqm Start of construction: Q1 2019 Completion date: Q2 2025 Przystanek Tarnogaj City: Wroclaw District: Krzyki No. of stages : 1 No. of units: 129 units Total sellable area: ca 6.4 k sqm Start of construction : Q4 2023 Completion date: Q3 2025
Page 56
Disclaimer ROBYG S.A. endeavours to ensure that the information in the presentation is complete and up-to-date, however, we do not make any guarantees in this respect. ROBYG S.A. accepts no liability for the any errors and inaccuracies of this presentation. This presentation has been prepared solely for informational purposes. This document does not constitute or form part of any offer or invitation to sell or issue, or any solicitation of any offer to purchase or subscribe for any securities. The making of this presentation does not constitute any advice or recommendation regarding any securities. ROBYG S.A. does not undertake to publicly update or revise any forward looking statements that may be made herein, whether as a result of new information, future events or otherwise (except as required by law or regulation). ROBYG S.A. cannot accept responsibility for the consequences of using such information. 56
Page 57
Summary 1Q 2026 * Including amounts kept on individual escrow accounts. Please contact us: Investor Relations ROBYG S.A. ri@robyg.com.pl (22) 419 11 00 Units pre-sold: 620 (net after cancellations) Revenues: PLN 316 million Strong cash position*: PLN 268 million Operating cash flow: PLN 99 million (excl. purchase of new plots) Units on offer: 1 847 (out of which 3% are finished goods) 57 Number of units recognized in revenues: 285 Total land bank units: 17 824