Slides
Page 1
Q2 2025 earnings call August 1, 2025
Page 2
Important note for investors 2 This presentation contains certain forward -looking statements within the meaning of the Private Securities Litigation Reform Act of 1995 regarding Dominion Energy. The statements relate to, among other things, expectations, estimates and projections concerning the business and operations of Dominion Energy. We have used the words “path”, "anticipa te", "believe", "could", "estimate", "expect", "intend", "may", "plan", “outlook”, "predict", "project", “should”, “strategy”, “target”, "will“, “potential” and similar terms and phrases to identify forward -looking statements in this presentation. Such forward -looking statements, including operating earnings per share information and guidance, projected dividends, projected debt and equity issuances, projected cash flow, capital expenditures, operating expe nses and debt information, shareholder return, and long -term growth or value, are subject to various risks and uncertainties. As outlined in our SEC filings, factors that could cause actual results to differ include, but are not lim ited to: unusual weather conditions and their effect on energy sales to customers and energy commodity prices; extreme weather events and other natural disasters; extraordinary external events, such as the pandemic health event resultin g from COVID-19; federal, state and local legislative and regulatory developments; changes in or interpretations of federal and state tax laws and regulations; changes to regulated rates collected by Dominion Energy; risks associated with entities in which Dominion Energy shares ownership with third parties, such as a 50% noncontrolling interest in the Coastal Virginia Offshore Wind (CVOW) Commercial Project, including risks that result from lac k of sole decision making authority, disputes that may arise between Dominion Energy and third party participants and difficulties in exiting these arrangements; timing and receipt of regulatory approvals necessary for planned construction or expansion projects and compliance with conditions associated with such regulatory approvals; the inability to complete planned construction projects within time frames initially anticipated; risks and uncertainties tha t may impact the ability to construct the CVOW Commercial Project within the currently proposed timeline, or at all, and consistent with current cost estimates along with the ability to recover such costs from customers; risks and uncert ainties associated with the timely receipt of future capital contributions, including optional capital contributions, if any, from the noncontrolling financing partner associated with the construction of the CVOW Commercial Project; changes to federal, state, and local environmental laws and regulations, including those related to climate change; cost of environmental strategy and compliance, including cost related to climate change; changes in implementation and enforc ement practices of regulators relating to environmental standards and litigation exposure for remedial activities; changes in operating, maintenance and construction costs; the availability of nuclear fuel, natural gas, purchase d power or other materials utilized by Dominion Energy to provide electric generation, transmission and distribution and/or gas distribution services; additional competition in Dominion Energy’s industries; changes in demand for Dominion Energy’s services; risks and uncertainties associated with increased energy demand or significant accelerated growth in demand due to new data centers, including the concentration of data centers primarily in Loudoun County , Va., and the ability to obtain regulatory approvals, environmental and other permits to construct new facilities in a timely manner; the technological and economic feasibility of large -scale battery storage, carbon capture and sto rage, small modular reactors, hydrogen and/or other clean energy technologies; receipt of approvals for, and timing of, closing dates for acquisitions and divestitures; impacts of acquisitions, divestitures, transfers of assets by Dom inion Energy to joint ventures, and retirements of assets based on asset portfolio reviews; adverse outcomes in litigation matters or regulatory proceedings; fluctuations in interest rates; changes in rating agency requirements or credit ratings and their effect on availability and cost of capital; and capital market conditions, including the availability of credit and the ability to obtain financing on reasonable terms; political and economic conditions, including tariffs, inflation and deflation. Other risk factors are detailed from time to time in Dominion Energy’s quarterly reports on Form 10-Q and most recent annual report on Form 10 -K filed with the U.S. Securities and Exchange Commission. The information in this presentation was prepared as of August 1, 2025. Dominion Energy undertakes no obligation to update an y forward-looking information statement to reflect developments after the statement is made. Projections or forecasts shown in this document are based on the assumptions listed in this document and are subject to change at any tim e. This presentation shall not constitute an offer to sell or the solicitation of an offer to buy securities. Any offers to sell or solicitations of offers to buy securities will be made in accordance with the requirements of the Securities Act of 1933, as amended. This presentation has been prepared primarily for security analysts and investors in the hope that it will serve as a convenient and useful reference document. The format of this document may change in the future as we continue to try to meet the needs of security analysts and investors. This document is not intended for use in connection with any sale, offer to sell or solicitation of any offer to buy securities. This presentation includes certain financial measures that have not been prepared in accordance with U.S. generally accepted accounting principles (GAAP). A listing of such non-GAAP measures with their GAAP equivalents are as follows: Operating earnings per share (non -GAAP) which has a GAAP equivalent of reported net income per share. Reconciliations of such non -GAAP measures to their GAAP equivalents have been made available to the extent possible in the Secon d Quarter 2025 Earnings Release Kit on our investor relations website. With regards to projections, estimates or guidance included in this presentation related to such non -GAAP measures, reconciliations of such projected or esti mated non-GAAP measures to applicable GAAP measures are not provided, because the company cannot, without unreasonable effort, estimate or predict with certainty various components of net income. Please continue to regularly check Dominion Energy’s website at http://investors.dominionenergy.com/.
Page 3
3 ¹ See Second Quarter 2025 Earnings Release Kit for supporting information and a reconciliation to GAAP 2 Dividend declarations are subject to customary Board approval Metric Amount Commentary Q2 2025: Actual ($ per share)¹ $0.75 Reflects $0.02 of RNG 45Z income and $0.01 of favorable weather impact 2025 guidance midpoint ($ per share) $3.40 Includes ~10 cents/share of RNG 45Z income No change 2025 guidance ($ per share) $3.28—$3.52 Includes ~10 cents/share of RNG 45Z income No change Long-term operating EPS growth rate 5%—7% off 2025 operating EPS excluding RNG 45Z income ($3.30) No change 2025 dividend ($ per share)² $2.67 No change 2025—2029 capital investment plan ~$50B To be updated on Q4 call Operating earnings per share (non-GAAP) and long-term financial guidance Reaffirmed all earnings, credit and dividend guidance from Q4 2024 update Dominion Energy Financial results and guidance
Page 4
4 ¹ Excludes short-term debt activity, potential opportunistic financings including liability management, as well as certain tax -free re-marketings; figures may not sum due to rounding ² Excludes dividend reinvestment issuance range of ~$0.2B 3 Issued under forward settlement sales under existing ATM program Dominion Energy Capital raising activities (updated) Common equity activities ($B)² 2025 expected fixed income activities ($B)¹ Guidance (no change) Issued YTD (updated)3 Remaining 2025 At-the-market (ATM) $1.0 $1.0 — 2026 At-the-market (ATM) $0.6 $0.6 — Guidance (no change) Issued YTD (updated) Remaining Dominion Energy Virginia $2.0—$2.5 $1.3 $0.7—$1.2 Dominion Energy South Carolina 0.5 0.5 — Contracted Energy — — — DEI hybrid 1.0—2.0 — 1.0—2.0 DEI other fixed income 2.0—3.0 2.5 — Consolidated $5.5—$8.0 $4.3 $1.7—$3.2 Will look to opportunistically de-risk financings during remainder of 2025
Page 5
¹ Number of recordables per 100 employees each work year; data is pro forma for SCANA ² 2025 YTD through June ³ Average per B ureau of Labor Statistics 2023 industry data for electric power generation, transmission, and distribution (NAICS code 2211) OSHA recordable incident rate¹ 5 Dominion Energy Employee safety 0.96 0.52 0.45 0.42 0.28 1.70 2006-2021 average 2022 2023 2024 2025 YTD² Industry average³ 84% below average
Page 6
Coastal Virginia Offshore Wind (CVOW) CVOW well-aligned with focus on American energy dominance 6 ▪ The Coastal Virginia Offshore Wind project: ✓ Is now ~60% complete, months away from first delivery of electricity to customers (early 2026) and remains on schedule for full completion at the end of 2026 ✓ Represents the fastest and most economical way to deliver nearly 3GW to Virginia's grid to support America’s AI and cyber, shipbuilding, and military + defense preeminence ✓ Has the robust bipartisan support of Virginia’s government and congressional leaders ✓ Has strong support from local communities, military and defense interests, the commercial marine industry, as well as civic, educational, environmental, labor and community partners ✓ Has created ~2,000 direct and indirect American jobs and generated ~$2B in American economic activity ✓ Is fully state and federally permitted ✓ Plays a critical part of a comprehensive “all of the above” energy strategy
Page 7
DW export cable Onshore Monopiles Interarray cable Offshore substations Transition pieces Turbine towers 7 Note: Awaiting installation includes components that are completely fabricated and awaiting transport or en route presently to Virginia Coastal Virginia Offshore Wind (CVOW) Project remains on schedule, end of 2026 completion Significant progress reduces project risk: ~60% complete % installed or awaiting installation Project scope: 176 monopiles Installed: 134 Awaiting installation: +26 Fabrication complete ~93% % complete ~77% Project scope: 9 deepwater cables Installed: 9 Project scope: 176 TPs Installed: 59 Awaiting install: +64 Completed final assembly: 148 % installed or awaiting installation ~70% % installed 100% All activities remain on track % installed ~91% Project scope: 3 OSS OSS #1: Installed on March 10th OSS #2/#3: Expected to arrive by YE2025 % fabricated ~88% Project scope: 260 miles % towers fabricated or in fabrication ~44% Project scope: 176 WTG Towers: 58 fabricated, 12 received at PMT Nacelles: 97 fabricated, 12 received at PMT Blade sets: 14 fabricated, 5 received at PMT Expected completion: Oct. 2025 Expected completion: Early 2026 Expected delivery: YE 2025 Expected final delivery: Q4 2025 Installation complete
Page 8
8 Component staging at Portsmouth Marine Terminal (July 2025) Coastal Virginia Offshore Wind (CVOW) Achieving major construction milestones
Page 9
9 Charybdis with completed sea fasteners for transporting turbines (July 2025) Charybdis (Jones Act compliant installation vessel) Final commissioning underway, on schedule for turbine installation
Page 10
10 Charybdis (Jones Act compliant installation vessel) Status and next steps detail (updated) Commissioning Sea trials Delivery and transport Testing completed: ✓ Leg jack-up testing: Complete ✓ Crane load testing: Complete ✓ Thrusters at 100% testing: Complete ✓ All engines and generators including emergency generators testing: Complete ✓ Ship blackout and recovery testing: Complete ▪ Testing remaining: Full fire detection and suppression testing, emergency lighting testing, cable conduit watertighting (as systems are successfully tested), captain mustering and emergency evacuation drills Expected start: Week of August 4th Expected duration: 8 to 14 days ▪ Repeat ship blackout and recovery testing ▪ Repeat thrusters at 100% testing ▪ Dynamic positioning testing ▪ Navigation system testing ▪ Delivery (which begins charter): Will take place in Brownsville upon completion of sea trials ▪ Transport to Virginia: Expected duration of ~10 days ▪ On schedule to support CVOW turbine installation in September as planned (no change) Costs ▪ Total project costs (including financing costs): $715M (no change)
Page 11
Coastal Virginia Offshore Wind (CVOW) Tariff impacts (updated) 11 ▪ Current tariff rates (as of July 31, 2025) ― Mexico and Canada: 25% (no stacking of tariff if already subject to steel or aluminum tariff) ― Steel: 50% (material value only) ― European Union: 10% (no stacking on portion of costs subject to steel or aluminum tariff) Overview ¹ Represents actual to date plus forecast project cost impact from offshore and direct onshore categories if current tariff rates and policy is extended through the illustrative timeframes indicated in the table 2 Accounting for VA SCC settlement and Stonepeak partnership 3 LCOE represents 2027 dollars and includes REC value of $29/MWh, after accounting for cost sharing 4 Represents estimated project lifetime average monthly bill attributable to CVOW for a typical residential customer using 1,000 kWh per month, after accounting for cost sharing 5 Reflects 10% baseline universal tariff to Europe and other applicable countries 6 Second quarter reported earnings reflect the project budget increase for Mexico, Canada & steel through 9/30/25 7 Assumes Stonepeak funds capital at 33% level above $11.3B Impact to project costs at 100% ownership As filed 5/1 Actuals Illustrative impacts Timeframe Through 6/30/25 Through 6/30/25 Through 9/30/256 Through 12/31/25 Through 12/31/26 Through 12/31/267 Impact of tariffs ($M)¹: Mexico + Canada $10 $0 $7 $14 $34 $34 (+) Impact of tariffs ($M)¹: Steel 83 63 99 119 164 151 (+) Impact of tariffs ($M)¹: European Union5 30 10 87 157 308 455 (=) Impact of tariffs ($M)¹: Total $123 $73 $193 $290 $506 $640 Amount borne by D ($M)2 $31 $18 $48 $73 $127 $186 Total project cost ($B) (including contingency) $10.8 $10.8 $10.9 $11.0 $11.2 $11.3 Est. LCOE including REC ($/MWh)3 $62 $62 $63 $63 $64 $65 Est. net res. bill impact attributable to CVOW4 ($0.97) ($0.97) ($0.94) ($0.91) ($0.85) ($0.82) = Illustrative EU 15% and Mexico 30% tariffs = Updated project cost included in SCC filing
Page 12
Coastal Virginia Offshore Wind (CVOW) Project cost (updated) 12 Selected cost updates ▪ Current capital budget: $10.9B (includes $193M of est. tariffs) including contingency ( updated) ▪ Project-to-date investment (as of 6/30/2025): ~$7.5B ▪ Remaining project costs: ~$3.4B ▪ % to be funded by Stonepeak via non-controlling equity financing: 50% ▪ Remaining amount to be funded by Dominion Energy: ~$1.7B ▪ Current unused contingency (no change): ▪ $222M (~7% of remaining project costs) ▪ Cost-sharing settlement (no change): ▪ 50% of incurred project cost up to $11.3B deemed recoverable from customers (subject to prudency determination) ▪ Current unfixed costs: ▪ Assignment of network upgrades by PJM (updated): Delayed by PJM until late September at earliest, no change to cost expectations ▪ Fuel for transport/installation ▪ Certain project oversight costs
Page 13
13 DEV ✓ CPCN for LNG production/storage at Brunswick + Greensville power stations approved in February ✓ RPS development plan and CE-5 rider approved in April ✓ Rider SNA (nuclear subsequent license renewal) phase II approved on July 1st ✓ 2024 VA integrated resource plan approved on July 15th ✓ Rider SMR approved on July 29th ✓ Chesterfield Energy Reliability Center ▪ Gas-fired electric generating facility, part of “all of the above” approach to energy supply ▪ If approved, ~1 GW project expected to cost ~$1.5B and be placed in service in 2029 ▪ Attorney General’s office testimony supports project ▪ Staff testimony due on August 19th, hearing scheduled for September 23 rd ✓ 2025 VA Biennial review – intervenor and staff testimony filed ▪ Company rebuttal – August 13th ▪ Evidentiary hearing – September 2nd ▪ Final order – by the end of November 2025 Dominion Energy Selected business updates DESC ✓ SC Energy Security Act passed and signed into law in May ▪ Addresses future generation needs, permitting reform, and regulated investment recovery ✓ NRC approved V.C. Summer subsequent license renewal for additional 20 years through 2062
Page 14
14 ✓ Ongoing emphasis on key priorities ✓ Consistently achieving our financial commitments; strong first half of 2025 ✓ Continued on-time achievement of major construction milestones for the Coastal Virginia Offshore Wind project ✓ Achieving constructive regulatory outcomes that demonstrate our ability to work cooperatively with regulators and stakeholders to deliver results that benefit both customers and shareholders ✓ Continue to see opportunities for investment in support of our customers ✓ 100% focused on execution Dominion Energy Summary
Page 15
Appendix 15
Page 16
16 Q3 drivers (YoY) Q4 drivers (YoY) ¹ Regulated investment is net of CVOW NCI. Q3 2024 results did not reflect any CVOW NCI impact. Additionally, regulated inves tment levels may be subject to seasonal fluctuations ² Inclusive of the electric rate cases completed by DESC in Q3 2024 and DENC in Q4 2024, respectively 3 A Millstone planned refueling outage occurred in Q4 2024 Consolidated guidance 2025 operating earnings per share (excluding RNG 45Z) ▲ Regulated investment¹ ▲ Millstone absence of planned outage³ ▲ Contracted Energy margins ▲ Sales ▼ DD&A ▼ Financing costs ▼ Share dilution ▼ Electric capacity ▼ Nuclear PTC ▼ Other/tax timing ▲ Regulated investment¹ ▲ Contracted Energy margins ▲ Electric rate cases² ▲ Sales ▼ DD&A ▼ Financing costs ▼ Share dilution ▼ Electric capacity ▼ Nuclear PTC ▼ Other/tax timing
Page 17
0% 25% 50% 75% 100% Dec-22 Dec-23 Dec-24 Dec-25 Dec-26 ~60% complete First turbine installed Last monopile installed Last transition piece installed First delivery of electricity (early 2026) Coastal Virginia Offshore Wind (CVOW) Project remains on schedule, end of 2026 completion 17 Last turbine installed / project COD
Page 18
2.1% 2.5% 2024 LTM Q2 '25 Regulated electric sales growth DEV and DESC combined 18 ¹ LTM refers to the timeframe of the immediately preceding 12 months as noted ² DEV and DESC combined, excluding DESC lost wh olesale customer ³ 2025 YTD through June 0.3% 5.6% 0.5% -1.3% 2.5% Residential Commercial Industrial Govt/Other Total LTM¹ Q2 ’25 YoY weather normal sales growth² Annual & LTM¹ weather normal sales growth² 1.0% 1.3% DEV DESC YTD YoY electric customer growth³ ✓ Robust commercial load growth driven by Data Centers ✓ Attractive customer growth across our Virginia and South Carolina service areas ✓ Industrial load accounts for <10% of regulated sales Regulated electric sales trends
Page 19
DE Virginia 2.8M 68% DE South Carolina 1.3M 32% Three months ended June 30 ‘23-’25 CAGR Average customers Q2 2025 (M) DE Virginia 1.1% 2.8 DE South Carolina 2.4% 1.3 Electric 1.9% 0.8 Gas 3.3% 0.5 Total utility customers 1.5% 4.1 4.1M State utility customers Customers State-regulated utilities 19 Segment summary Q2 2025 State summary Note: Customer growth calculation methodology reflects average customers in the quarter; figures may not sum due to rounding
Page 20
Weather Degree days 20 Note: Figures may not sum due to rounding Quarter ended 6/30 Six months ended 6/30 2025 2024 2025 2024 Actual 176 179 2,118 1,838 Normal 248 260 2,143 2,200 Actual 612 648 632 652 Normal 570 546 575 550 Actual 10 20 853 640 Normal 24 25 767 793 Actual 269 281 269 281 Normal 251 248 252 248 Actual 10 20 853 640 Normal 24 25 767 793 Electric Dominion Energy South Carolina Gas Heating Cooling Dominion Energy Virginia Dominion Energy South Carolina Heating Cooling Heating
Page 21
$13 $4 — — $17 15 6 — — 21 $28 $10 — — $38 $54 ($12) — — $42 20 (3) — — 17 $74 ($15) — — $59 Dominion Energy Virginia2 Dominion Energy South Carolina3 ¹ The effects on earnings from differences in weather compared to normal and compared to prior periods are measured using bas e rate revenue. This schedule does not reflect the O&M expenditures for restoring service associated with outages caused by major storms 2 Dominion Energy Virginia electric utility operations 3 Dominion Energy South Carolina electric and gas utility operations. Figures may not sum due to rounding Total Q1 Versus normal¹Versus prior year¹ Q2 Q3 Q4 2025 YTD Q1 Q2 Q3 Q4 2025 YTD 21 Dominion Energy Virginia2 Dominion Energy South Carolina3 Total Weather After-tax impacts ($M)
Page 22
22 Dominion Energy, Inc. Moody’s S&P Fitch Corporate/Issuer Baa2 BBB+ BBB+ Senior Unsecured Debt Securities Baa2 BBB BBB+ Junior Subordinated Notes Baa3 BBB- BBB- Preferred Stock Ba1 BBB- BBB- Short-Term/Commercial Paper P-2 A-2 F2 Outlook Negative Stable Stable VEPCO Moody’s S&P Fitch Corporate/Issuer A3 BBB+ A- Senior Unsecured Debt Securities A3 BBB+ A Short-Term/Commercial Paper P-2 A-2 F2 Outlook Stable Stable Stable DESC Moody’s S&P Fitch Corporate/Issuer Baa1 BBB+ A- First Mortgage Bonds A2 A A+ Short-Term/Commercial Paper P-2 A-2 F2 Outlook Stable Stable Stable Fixed income Credit ratings as of June 30, 2025
Page 23
Segment Financing Entity Description Maturity Weighted Avg. Coupon Current portion Long-term DE Virginia VEPCO Unsecured Senior Notes, fixed rates 2026-2055 4.47% $750 $18,935 DE Virginia VEPCO Tax-Exempt Financings, fixed rates 2032-2041 2.68% - 625 DE Virginia VPFS Senior Secured Deferred Fuel Cost Bonds, fixed rates 2029-2033 4.93% 167 969 DE SC DESC First Mortgage Bonds, fixed rates 2028-2065 5.24% - 4,584 DE SC DESC Tax-Exempt Financing, variable rate 2038 1.63% - 35 DE SC DESC Tax-Exempt Financings, fixed rates 2028-2033 3.90% - 54 DE SC DESC Other Long-term Debt, fixed rates 2027-2069 3.57% - 1 DE SC GENCO Tax-Exempt Financing, variable rate 2038 1.63% - 33 Corp & Other DEI Unsecured Senior Notes, fixed rates¹ 2025-2052 4.34% 1,313 11,963 Corp & Other DEI Unsecured Junior Subordinated Notes: Corp & Other DEI Payable to Affiliated Trust, fixed rate 2031 8.40% - 10 Corp & Other DEI Junior Subordinated Notes, fixed rates 2054-2055 6.82% - 3,250 Total Principal Amount $2,230 $40,459 Unamortized Discount, Premium and Debt Issuance Costs, net (1) (374) Finance Leases and Other Long-Term Debt 63 209 Total Debt $2,292 $40,294 23 Note: Figures may not sum due to rounding ¹ Includes debt previously issued by CNG Represents deferred fuel securitization bonds that are considered “off credit” by the credit rating agencies. The securitization bondholders have recourse solely with respect to the deferred fuel cost property owned by VPFS and no recourse to any other assets of Dominion Energy or Virgi nia Power. Fixed income Preliminary and unaudited schedule of long-term debt as of June 30, 2025 ($M)
Page 24
24 Fixed income Schedule of debt maturities as of June 30, 2025 ($M) Financing Due Date Entity DE Virginia DE SC Con Energy Corp & Other Total 2025 3.90% 2015 Series B Senior Notes 10/01/25 DEI - - - 750 750 5.088% Senior Secured Deferred Fuel Cost Bonds 11/01/25 VPFS 82 - - - 82 2025 Total 82 - - 750 832 2026 3.15% 2016 Series A Senior Notes 01/15/26 VEPCO 750 - - - 750 1.45% 2021 Series A Senior Notes 04/15/26 DEI - - - 564 564 2.85% 2016 Series D Senior Notes 08/15/26 DEI - - - 400 400 6.875% Debentures (former CNG subsidiary) 10/15/26 DEI - - - 6 6 2.95% 2016 Series B Senior Notes 11/15/26 VEPCO 400 - - - 400 5.088% Senior Secured Deferred Fuel Cost Bonds multiple VPFS 171 - - - 171 2026 Total 1,321 - - 970 2,291 Segment Note: Figures may not sum due to rounding
Page 25
25 Note: Figures may not sum due to rounding ¹ Excludes finance leases and other long -term debt Fixed income Schedule of debt maturities as of June 30, 2025 ($M) Financing Due Date Entity DE Virginia DE SC Con Energy Corp & Other Total 2027 3.60% 2020 Series B Senior Notes 03/15/27 DEI - - - 350 350 3.50% 2017 Series A Senior Notes 03/15/27 VEPCO 750 - - - 750 5.088% Senior Secured Deferred Fuel Cost Bonds 05/01/27 VPFS 40 - - - 40 3.75% 2022 Series B Senior Notes 05/15/27 VEPCO 600 - - - 600 6.80% Debentures (former CNG subsidiary) 12/15/27 DEI - - - 83 83 4.877% Senior Secured Deferred Fuel Cost Bonds multiple VPFS 140 - - - 140 2027 Total 1,530 - - 433 1,963 2028 4.00% 2013 Series SC JEDA Industrial Revenue Bonds 02/01/28 DESC - 39 - - 39 3.80% 2018 Series A Senior Notes 04/01/28 VEPCO 700 - - - 700 4.60% 2025 Series C Senior Notes 05/15/28 DEI - - - 1,000 1,000 4.25% 2018 Series B Senior Notes 06/01/28 DEI - - - 495 495 4.25% Series First Mortgage Bonds 08/15/28 DESC - 53 - - 53 4.877% Senior Secured Deferred Fuel Cost Bonds multiple VPFS 190 - - - 190 2028 Total 890 92 - 1,495 2,477 2029 2.875% 2019 Series A Senior Notes 07/15/29 VEPCO 500 - - - 500 4.877% Senior Secured Deferred Fuel Cost Bonds multiple VPFS 198 - - - 198 2029 Total 698 - - - 698 Total¹ 4,521$ 92$ -$ 3,648$ 8,261$ Segment