Delivering energy for what’s NEXT July 2026 Q2 2026 Investor Update
Page 2
1 NextDecade Corporation 1000 Louisiana Street, Suite 3300 Houston, Texas 77002 USA Disclaimer Statement NASDAQ: NEXT This Presentation contains certain statements that are, or may be deemed to be, “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. All statements other than statements of historical fact contained in this presentation, including statements regarding the future results of operations and financial position of NextDecade Corporation and its subsidiaries (collectively, the “Company”), its strategy and plans, its expectations for future operations and transactions, environmental, regulatory and legislative matters and future demand and supply affecting liquefied natural gas (“LNG”) and general energy markets, are forward-looking statements. The words “anticipate,” “assume,” “budget,” “contemplate,” “estimate,” “expect,” “forecast,” “guidance,” “project,” “potential,” “propose,” “plan,” “initial,” “intend,” “believe,” “may,” “might,” “will,” “would,” “could,” “should,” “can have,” “likely,” “continue,” “design,” “goal,” “target,” and other words and terms of similar expressions, are intended to identify forward-looking statements. The Company has based these forward-looking statements largely on its current expectations and projections about future events and trends that it believes may affect its financial condition, results of operations, strategy, short-term and long-term business operations, and objectives and financial needs. Although the Company believes that the expectations reflected in its forward-looking statements are reasonable, actual results could differ from those expressed in its forward-looking statements. The Company’s future financial position and results of operations as well as any forward-looking statements are subject to change and inherent risks and uncertainties. You should consider the Company’s forward-looking statements in light of a number of factors that may cause actual results to vary from its forward-looking statements including, but not limited to: our progress in the development of our natural gas liquefaction and liquefied natural gas (“LNG”) export project and the timing of that progress; the timing and cost of the development, construction and operation of the first five liquefaction trains and related common facilities of the multi-plant integrated natural gas liquefaction and LNG export facility located at the Port of Brownsville in southern Texas (the “Rio Grande LNG Facility”), the availability and frequency of cash distributions available to us from the joint ventures which own Phase 1 (Trains 1-3), Train 4 and Train 5 of the Rio Grande LNG Facility; the timing and cost of the development of subsequent liquefaction trains at the Rio Grande LNG Facility; the ability to generate sufficient cash flow to satisfy our and our subsidiaries' significant debt service obligations or to refinance such obligations ahead of their maturity; restrictions imposed by debt agreements that limit flexibility in operating our business; increases in interest rates increasing the cost of servicing indebtedness; our reliance on third parties to successfully complete the Rio Grande LNG Facility and related pipelines and other infrastructure; our ability to secure additional debt and equity financing in the future, including any refinancing of outstanding indebtedness, on commercially acceptable terms; the accuracy of estimated costs for the Rio Grande LNG Facility; our ability to achieve operational characteristics of the Rio Grande LNG Facility, when completed, including amounts of liquefaction capacities, and any differences in such operational characteristics from our expectations; the development risks, operational hazards and regulatory approvals applicable to the Rio Grande LNG Facility and our LNG, construction and operation activities and those of our third-party contractors and counterparties; the ability to obtain or maintain governmental approvals to construct or operate the Rio Grande LNG Facility; technological innovation which may lessen our anticipated competitive advantage or demand for our offerings; the global demand for and price of LNG; the availability of LNG vessels worldwide; changes in legislation and regulations relating to the LNG industry, including environmental laws and regulations that impose significant compliance costs and liabilities; global pandemics, the Russia-Ukraine conflict, conflicts in the Middle East, other sources of volatility in the energy markets and their impact on our business and operating results, including any disruptions in our operations or development of the Rio Grande LNG Facility and the health and safety of our employees, and on our customers, the global economy and the demand for LNG; risks related to doing business in and having counterparties in foreign countries, including as a result of tariffs; our ability to maintain the listing of our securities on the Nasdaq Capital Market or another securities exchange or quotation medium; changes adversely affecting the businesses in which we are engaged; management of growth; general economic conditions, including inflation and rising interest rates; our ability to generate cash; and the result of future financing efforts. Should one or more of the foregoing risks or uncertainties materialize in a way that negatively impacts the Company, or should its underlying assumptions prove incorrect, its actual results may vary materially from those anticipated in its forward-looking statements and, its business, financial condition and results of operations could be materially and adversely affected. You should not rely upon forward-looking statements as predictions of future events. In addition, neither the Company nor any other person assumes responsibility for the accuracy and completeness of any of these forward- looking statements. The Company cautions readers that the information contained in this presentation is only current as of the date of this presentation and, therefore, except as required by applicable law, the Company does not undertake any obligation to publicly correct or update any forward-looking statement. Financial projections, estimates, or other forward-looking financial information included in this presentation is meant for illustrative purposes only and does not purport to show estimates of actual future financial performance over any particular period. The information on such slides has not been reviewed by the Company’s independent auditor and the Company’s independent auditor expresses no opinion with respect to such information. The information on such slides assumes the completion of certain commercial, financing, and other transactions. Such transactions may not be completed on the terms we assume or at all. Actual commodity prices and the terms of commercial and financing arrangements may vary materially from those assumed for the purposes of the illustrative financial performance information. Please refer to slide “Key Assumptions and Details” in the appendix for more detail regarding forward-looking financial information. This Presentation contains projections of Rio Grande LNG Project-Level Adjusted EBITDA, Rio Grande LNG Project-Level Distributable Cash Flow, NextDecade Share of Rio Grande LNG Project-Level Distributable Cash Flow, and NextDecade Distributable Cash Flow, which are non-GAAP measures. Please refer to slide “Non-GAAP Measures” in the appendix for a definition of these metrics and additional information regarding non-GAAP measures.
Page 3
2 Recent Developments and Key Highlights Filed application with FERC for Train 6; FERC scheduled to issue final Environmental Impact Statement June 25, 2027 Refinanced a Significant Portion of Rio Grande LNG, LLC (Phase 1) Bank Debt Advancing toward first LNG production in 1H 2027 Safely energized main substation with 138kV power in May 2026 Seconded >100 operational employees to Bechtel as part of preparations for commissioning and start-up Over 6,000 workers on site daily $1.0 billion term loan at Rio Grande LNG Intermediate HoldCo Borrower, LLC $3.5 billion senior secured notes in 144A offering at Rio Grande LNG, LLC Net proceeds used to reduce Rio Grande LNG, LLC bank debt by ~$4.6 billion1 1 Includes reduction in Rio Grande LNG, LLC bank facility balances related to ~$109 million settlement received from the unwind of a portion of Rio Grande LNG, LLC’s interest rate swaps.
Page 4
3 9.4% 15.5% 50.4% 74.0% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Train 5 Train 4 Train 3 Trains 1 and 2 Overall Engineering Procurement Construction Commissioning Construction Continues Safely, on Budget, and Ahead of Schedule Phase 1 progress continues to track ahead of guaranteed schedule, first LNG expected 1H 2027 • Safely energized main substation with 138kV power in May • Seconded >100 operational employees to Bechtel in June in preparation for commissioning and start-up • Train 1 electrical commissioning continues to progress • Train 2 equipment installation underway, second compressor string and turbine set in July • Train 3 equipment installation started, including first compressor string • Train 4 soil stabilization complete and foundation pours began, Train 5 soil stabilization began in July • Inner wall welding progressing for Tanks 1 and 2, Tank 1 pipe installation underway, Tank 3 piling in progress • Construction of permanent buildings nearing completion, Bay Runner remains on track for 3Q 2026 in-service, hot tap to Valley Crossing Pipeline completed Recent Construction Highlights Construction Progress as of June 2026
Page 5
4 Train 6 Development Advancing • Filed formal application with FERC for Train 6 in May 2026 • FERC issued the schedule of environmental review in July • Final Environmental Impact Statement expected June 25, 2027 • Filed DOE application for Train 6 LNG export authorizations in June 2026 • Advancing commercial discussions with potential long-term LNG SPA counterparties • Strong indications of demand from creditworthy potential customers • Expect Train 6 to be highly contracted 1 Achieving a positive FID on expansion capacity is subject to, among other things, obtaining all necessary permits and obtaining appropriate commercial support and financing. Target finalizing EPC contract, commercialization, and financing to enable a positive final investment decision (FID) on Train 6 in 2H 20271
Page 6
5 Middle East Conflict Has Dramatically Altered “Third Wave” Dynamic Uncertain timing of return of existing Middle East LNG supply and delays to expansion projects have removed material amounts of LNG supply from the global market through 2030+ Source: Company analysis based on Wood Mackenzie data adjusted for projected impacts of Middle East conflict on global LNG production through 2030, including projects currently operating or under construction. Lower supply outlook drives need for additional LNG and supports near-term prices U.S., and specifically NextDecade, excellently positioned to provide secure, reliable, affordable incremental LNG supplies 350 400 450 500 550 600 650 2023 2024 2025 2026E 2027E 2028E 2029E 2030E (MTPA) Historical and Projected LNG Supply Prior to Middle East conflict, market concerned about “third wave” of LNG leading to supply overhang Historical supply Projected supply prior to conflict (4Q25) Continued growth at 20-year CAGR Projected supply with near-term resolution (top) or long-term disruption (bottom) Range of outcomes, including near- term resolution, point to LNG supply growth through 2030 in line with or below the market’s 20-year average growth rate
Page 7
6 Recent Financial Transactions • Termed out a significant portion of outstanding Rio Grande LNG, LLC (Phase 1) bank facility debt in June and July 2026, diversifying debt maturities and freeing up bank capacity for future expansions • Rio Grande LNG Intermediate HoldCo Borrower, LLC (Phase 1 HoldCo Borrower) entered into a credit agreement for a $1.0 billion term loan at 7.05% interest in June 2026, maturing in June 2033 • Interest payable in cash or in-kind at the Company’s election until the first interest payment date after June 2029 • Enabled access to investment grade market for subsequent 144A transaction • Rio Grande LNG, LLC issued $3.5 billion total principal of investment-grade rated1 senior secured notes in a 144A offering in July 2026 in four tranches: $1.0 billion of 5.25% senior secured notes due June 2031 $500 million of 5.50% senior secured notes due January 2034 $1.25 billion of 5.75% senior secured notes due June 2036 $750 million of 6.15% senior secured notes due June 2041 • Unwound a portion of Phase 1 interest rate swaps, received ~$109 million settlement in July 2026 • Total net proceeds used to reduce Rio Grande LNG, LLC bank facility debt by ~$4.6 billion 1 Notes rated BBB- by S&P and Fitch as of July 30, 2026.
Page 8
7 2Q 2026 Financials • Two vessel charters began in 2Q, additional charters to begin throughout 2026 • Vessel charters accounted for as finance leases – leased vessels recorded as assets and lease liabilities on balance sheet, included primarily in depreciation and amortization expense and interest expense on income statement • Subchartered certain capacity to match capacity with needs – subcharter income included as an offset to operating and maintenance expense • Began breaking out operating and maintenance expense in 2Q 2026 due to approaching first LNG production • Operating and maintenance expense includes site and pre- operational readiness related costs; YTD 2026 primarily consists of labor, property taxes, and site lease • General and administrative expense includes corporate management, support, and costs not directly applicable to operating assets or activities; consolidated financials include both corporate and project-level costs • Expense break out applied retrospectively to financials Clean Texas
Page 9
8 NextDecade Investment Highlights
Page 10
9 Providing the World Access to Lower-Carbon Energy Maximizing shareholder value by safely and efficiently delivering lower-carbon energy through LNG infrastructure NextDecade is developing and constructing the Rio Grande LNG Facility, a natural gas liquefaction and export facility near Brownsville, Texas, with approximately 48 million tonnes per annum (MTPA) of potential liquefaction capacity currently under construction or in development. Trains 1-5 are under construction, and Trains 6-8 are in development and advancing the permitting process. Sufficient space exists at the site for development of up to 10 liquefaction trains. The Rio Grande LNG Facility site location is advantaged due to proximity to abundant natural gas resources in the Permian Basin and Eagle Ford shale, historically fewer and less severe weather events than other U.S. Gulf Coast areas, access to an uncongested waterway, access to a large pool of skilled local labor, and strong geotechnical conditions. First LNG is expected in the first half of 2027. Rio Grande LNG Facility
Page 11
10 NextDecade Key Investor Highlights Strong Asset Development Platform at Rio Grande LNG Site1 Valuable Relationships with High-Quality Counterparties Across the Value Chain Growth Momentum Supported by Robust Market Fundamentals Strong Commitment to Sustainability and Social Responsibility 2 3 4
Page 12
11 Strong Organic Growth Platform at Rio Grande LNG Site Phase 1 (Trains 1–3) tracking ahead of guaranteed schedule, first LNG from Train 1 expected in 1H 2027 Developing and advancing permitting process for Trains 6-8, and sufficient space at site for up to 10 trains in total Site location benefits from access to prolific available gas supply resources in Permian Basin and Eagle Ford shale, historically fewer and less severe weather events than other areas of U.S. Gulf Coast, an uncongested port, a large pool of skilled local labor, and strong geotechnical conditions Construction of Trains 1-5 progressing safely and on budget, guaranteed completion dates range from 2027 – 1H 2031 NextDecade Key Investor Highlights 1
Page 13
12 2 Established, reliable counterparties for gas transportation, gas supply, maintenance, and other services Commercial offtake agreements (LNG SPAs) with creditworthy, leading players in the global LNG market Project design utilizes established, proven technology and equipment providers EPC partner has unmatched track record of liquefaction project deliverability on time and on budget NextDecade Key Investor Highlights Prominent infrastructure-focused equity partners across Trains 1-5 at Rio Grande LNG Valuable Relationships with High-Quality Counterparties Across the Value Chain
Page 14
13 Growth Momentum Supported by Robust Market Fundamentals 3 NextDecade Key Investor Highlights Demand for incremental LNG expected to continue to grow in coming years due to strong global growth in total gas demand, combined with constraints in natural gas and LNG production and transportation in various parts of the world Filed formal application with FERC for Train 6 and third berth in 2Q 2026, goal to leverage commercial momentum and commercialize Train 6 during the permitting process Signed over 7 MTPA of 20-year LNG SPAs in 2025 with creditworthy counterparties Aramco, TotalEnergies, JERA, EQT, and ConocoPhillips for Trains 4 and 5 at Rio Grande LNG Expect to advance development of Trains 7 and 8 in 2026
Page 15
14 Strong Commitment to Sustainability and Social Responsibility 4 Commitment to conserve over 4,000 acres of wetland and wildlife habitat area near Rio Grande LNG NextDecade seeks to deliver secure, affordable, and cleaner energy through the safe and efficient development and operation of liquefaction capacity at Rio Grande LNG Committed to supporting the Rio Grande Valley community by creating thousands of jobs, investing millions into the local supply chain, supporting education systems, and regularly engaging with residents and local stakeholders NextDecade Key Investor Highlights LNG displaces coal and other solid fuels in developing countries, providing environmental benefits worldwide
Page 16
15 2026 Priorities
Page 17
16 Progress on Key 2026 Priorities Finalize preparation for commissioning activities, first LNG, and transition to operations Progress construction of Trains 1-5 safely, on budget, and ahead of schedule Manage near-term exposure to LNG market margins through sales of early volumes Advance development and permitting of Trains 6-8 to support goal of doubling capacity to 60 MTPA Note: MTPA – million tonnes per annum, FOB – free-on-board. FERC – Federal Energy Regulatory Commission. EIS – Environmental Impact Statement. 1 Estimated margin calculated as FOB LNG sales price less expected costs of natural gas feedstock and fuel. Phase 1 continues to track ahead of guaranteed schedule, within budget, and safely Electrical commissioning of Train 1 progressing, site safely energized in May 2026 NextDecade 2026 Priorities Year-to-Date Progress Advancing hiring, system implementations, and process development ahead of first gas Seconded >100 operations personnel to Bechtel in June 2026 ahead of commissioning and start-up YTD sold over 175 TBtu of portfolio volumes on FOB basis at fixed liquefaction fee with estimated margin 1 over $3.00/MMBtu Potential additional sales late 2026 – early 2027 Filed formal application with FERC for Train 6 in May 2026, FERC issued schedule of environmental review in July, final EIS expected June 25, 2027 Train 6 commercial discussions progressing
Page 18
17 2. Evaluate potential Train 6 financing options • Target high level of long-term SPAs to allow debt maximization at project level • Explore options to fund equity commitments • Target retaining a high economic interest in Train 6 and maximizing accretion to NextDecade Distributable Cash Flow on a per share basis • Expect additional FinCo bank capacity available for a portion of NextDecade equity commitments Progress on 2026 Financial Priorities 1. Opportunistically term out a portion of project-level credit facility balances in debt capital markets • Manage and diversify debt maturities • Manage split between bullet and amortizing maturities Reduced Phase 1 bank facility balances by ~$4.6 billion in June and July 2026 Entered into $1.0 billion term loan at Rio Grande LNG Intermediate HoldCo Borrower, LLC in June Issued $3.5 billion senior secured notes in 144A offering at Rio Grande LNG, LLC in July Net proceeds used to reduce Rio Grande LNG, LLC bank facility balances by ~$4.6 billion 1 Actively evaluating potential equity financing options with focus on maximizing value accretion Seeking to finance full equity commitments for Train 6 to retain 100% economic interest Commercialization of Train 6 underway with goal to maximize project-level debt supported by long-term contracts 1 Includes reduction in Rio Grande LNG, LLC bank facility balances related to ~$109 million settlement received from the unwind of a portion of Rio Grande LNG, LLC’s interest rate swaps.
Page 19
18 LNG Market Dynamics
Page 20
19 Robust Global Gas Demand Growth Calls for Incremental LNG Supply Source: Rystad Energy, Wood Mackenzie, IGU and Company analysis. 2026-2040 forecast global gas demand is based on an expected 1.8% growth rate. bcm • Expect growth in global gas demand to remain strong into 2030s and beyond - Economic growth and electrification driving demand in developing countries - Increased focus on energy security across geographies and economies - Incremental AI-driven power demand fueled preferentially by natural gas for baseload reliability • Expect LNG’s share of global gas demand to double from 2015 to 2030, with LNG continuing to grow at a faster rate than global gas demand - Customers demand secure, reliable, affordable energy sources - Expect incremental LNG to supply more than 40% of incremental global gas demand growth 0 1,000 2,000 3,000 4,000 5,000 6,000 2015 2020 2025 2030E 2035E 2040E LNG Pipeline Gas 2025-30 In Construction 2030-40 Potential Call on LNG Incremental LNG ~175 MTPA ~300 MTPA Total LNG Market ~600 MTPA ~900 MTPA
Page 21
20 $- $5 $10 $15 $20 $25 $30 2021 2022 2023 2024 2025 2026 JKM US LNG SPA Delivered Price Recent Events Underscore Attractiveness of Long-Term U.S. LNG Supplies Stable Henry-Hub linked pricing serves as buffer against market price shocks and tight market conditions Recent geopolitical events underscore price stability, reliability, and security of long-term U.S. LNG supplies Average 2021-Present Average 2023-Present U.S. LNG SPA Delivered $8.84 $8.03 JKM $17.63 $13.80 Short-Term LNG Market Price vs. Estimated U.S. LNG SPA Delivered Price to Asia1 2021 – Present Source: Platts, Nymex as of July 2026. JKM shown as short-term LNG market price for comparative purposes with estimated U.S. LNG SPA delivered price. 1 Estimated U.S. LNG SPA delivered price to Asia calculated as 115% of Henry Hub plus $2.50 per MMBtu fixed fee and $2.00 per MMBtu shipping cost. Estimated average U.S. LNG SPA delivered price to Asia ~50% lower than average short-term LNG price from 2021-present ~$5.75/MMBtu lower than short- term LNG price 2023-present
Page 22
21 © Australian Bureau of Statistics, GeoNames, Microsoft, Navinfo, Open Places, OpenStreetMap, Overture Maps Fundation, TomTom,Zenrin Powered by Bing Existing Regas Capacity Can Accommodate Substantial LNG Supply Growth Operational regas capacity is expected to accommodate ~1,350 MTPA of LNG by 2030, supporting significant additional LNG supply capacity • ~50 countries around the globe have operational regas infrastructure • Robust existing global regas infrastructure can accommodate a significant increase in LNG supply, and substantial additional potential capacity is under construction or in development • Regas infrastructure is not expected to become a bottleneck as LNG is expected to grow as a proportion of total global natural gas supply Source: Wood Mackenzie regas capacity data as of July 22, 2026, including regas capacity currently in operation or under construction.
Page 23
22 Rio Grande LNG Facility
Page 24
23 Rio Grande LNG Site in Great Location for Liquefaction Development Rio Grande LNG Site Access to uncongested port and waterway Area historically subject to fewer named storms than other areas of U.S. Gulf Coast Access to large, skilled local labor force Strong geotechnical conditions requiring less piling Proximity to prolific natural gas resources in Permian and Eagle Ford expected to create sustained gas supply advantage
Page 25
24 0 10 20 30 40 50 60 Potential to Be One of World’s Largest LNG Production and Export Sites Significant advantages of developing up to 10 trains on single, contiguous Rio Grande LNG site All trains expected to use same established technologies and proven design Strong geotechnical conditions are more advantageous than other areas on U.S. Gulf Coast Known construction conditions, and labor and equipment can easily shift across site to additional trains Extensive waterfront on site facilitates additional berth space and vessel capacity Site supports space for infrastructure for efficient production, including storage tanks and berths ~48 MTPA currently under construction or in development MTPA Trains 1-5 under construction Trains 6-8 in development Total potential capacity at Rio Grande LNG site ~60 MTPA Potential incremental capacity ~18 MTPA ~30 MTPA ~12 MTPA
Page 26
25 Rio Grande LNG Facility Site Plan Trains 1–5 World class ~1,000-acre site in south Texas with 15,000 feet of frontage on the Brownsville Ship Channel, advantaged by proximity to abundant Permian and Eagle Ford gas resources and uncongested port Two jetty berthing structures Levee around site Warehouses, administrative, operations control room and maintenance buildings Deepwater port access and supporting marine infrastructure 180,000m3 full containment LNG storage tanks Material offloading facility and laydown site during Phase 1 construction T1T2T3 Totally enclosed ground flares Texas State Highway 48 Trains 1-5 have expected LNG production capacity of ~30 MTPA Pipeline interconnects T4T5
Page 27
26 Equity Partners Valuable Relationships with High-Quality Counterparties Across Value Chain Technology EPC LNG Customers Pipeline
Page 28
27 • 5 liquefaction trains with expected production capacity of ~30 MTPA • 4 x 180,000m3 LNG storage tanks • 2 loading jetties designed to load LNG carriers up to 216,000m3 • Associated site infrastructure and common facilities construction including: - Full site preparation and levee around site - Common infrastructure including ground flares and material offloading facility Partnering with Preeminent Global LNG EPC Contractor Bechtel • EPC Contracts are fully-wrapped, date-certain, lump-sum, and turnkey (extensive wrap includes civil works) • Bechtel is responsible for engineering, procurement, construction, commissioning, and startup of LNG trains and associated infrastructure • Guarantee standards cover production, ship loading, power consumption, air emissions, and additional matters including noise pollution With over 125 years of experience, Bechtel stands as a premier engineering and construction company, boasting an unparalleled 60-year track record in executing LNG projects with excellence. Bechtel has designed and built approximately 30% of the world’s and 50% of the U.S. Gulf Coast’s onshore LNG capacity, successfully completing 18 mid-to-large scale liquefaction trains in the last decade, all of which produce at or above nameplate capacity. Construction of the Rio Grande LNG Facility is de-risked by Bechtel’s track record of successful LNG completions and by fully-wrapped, lump-sum, turnkey EPC contracts Project Scope Trains 1-5 EPC Contracts Provide NextDecade Strong Coverage
Page 29
28 Phase 1 Construction Progress UpdateRio Grande LNG Facility Guaranteed Construction Schedule Guaranteed Construction Timeline Guaranteed Substantial Completion Date 2023 2024 202720262025 2028 2029 2030 2031 Train 1 Train 3 Train 2 Train 4 Train 5 4Q 2027 3Q 2028 1Q 2029 3Q 2030 2Q 2031
Page 30
29 Phase 1 Construction Progress UpdateRio Grande LNG Facility Construction Progress Train 1, June 2026 Train 3, June 2026Train 2, June 2026
Page 31
30 Phase 1 Construction Progress UpdateRio Grande LNG Facility Construction Progress Train 4, June 2026 Train 5, June 2026
Page 32
31 Rio Grande LNG Facility Feed Gas Sourcing and Transportation Strategy Source: Wood Mackenzie. Executing a diversified gas sourcing and transportation strategy to capitalize on proximity to sources that are expected to produce significant quantities of low-cost natural gas for decades Agua Dulce TEXAS LOUISIANA Rio Grande LNG Henry Hub Permian ~550 Tcf 3 2 Eagle Ford ~100 Tcf ~650 Tcf of natural gas resources in Permian Basin and Eagle Ford Shale combined Texas offers one of the deepest inventories of economic natural gas resources in the world • Executing substantial and diversified feed gas sourcing strategy to spread risk exposure across multiple contracts, suppliers, and pricing hubs, with in-house risk management capabilities to mitigate supply disruptions and weather-induced volatility in pricing and secure reliable, low-cost feed gas supply • Agreements in place for firm and interruptible gas transportation to support commissioning and operations and provide ability to purchase gas at Agua Dulce and other physical access points, with access to prolific resources from the Permian Basin and Eagle Ford Shale and significant flexibility to obtain economically advantaged feed gas • Senior commercial team of experienced leaders with extensive commercial and trading experience in gas and LNG markets, supported by growing team including traders, schedulers, originators, analysts, mid- and back-office support, and commercial operations professionals
Page 33
32 Phase 1 Train 4 Train 5 Counterparties SPA Type 93% FOB 7% DES 100% FOB 100% FOB Average Term 19.2 years 20 years 20 years Index 91% HH 9% Brent 100% HH 100% HH SPA volume (MTPA)1 16.2 4.6 4.5 % Capacity Contracted ~90%2 ~77% ~75% Long-Term LNG Sale and Purchase Agreements Overview Note: FOB – free-on-board. DES – delivered ex-ship. Percentage capacity contracted shown as a percentage of expected LNG production capacity of ~18 MTPA for Trains 1-3. 1 SPA volumes are rounded. 2 Percentage based on volume loaded onto vessel. ~85% of five-train LNG production capacity contracted with a diverse mix of creditworthy customers
Page 34
33 ~$32 billion of liquefaction infrastructure fully funded Rio Grande LNG Trains 1-5 Funding Summary Note: Reflects refinancings through July 30, 2026. 1 Inclusive of NextDecade’s ~$125 million of pre-FID capital investments into Phase 1. 2 Equity contributed in June 2026 funded by $1.0 billion senior secured term loan at Rio Grande LNG Intermediate HoldCo Borrower, LLC (RGLNG HoldCo Borrower). 3 $350 million issued and outstanding as of July 30, 2026, remaining balance to be issued in October 2026. Total projected annual LNG production volumes 1,540 TBtu Rio Grande LNG Project-Level Adjusted EBITDA $3.7 billion Post-Flip NextDecade Distributable Cash Flow $0.8 billion Phase 1 construction continues to progress safely, ahead of schedule, and on budget • Tank 2 roof raise completed • Structural steel work progressing rapidly • Setting major equipment for Trains 1 and 2 • First compressor string and turbine for Train 1 delivered Phase 1 $18.0 billion estimated total project cost • Financed ~66% debt / ~34% equity at FID • $6.2 billion total equity commitments1 from NextDecade, Global Infrastructure Partners (GIP), GIC, Mubadala, and TotalEnergies • $1.0 billion equity from RGLNG HoldCo Borrower2 • $4.8 billion construction term loan facilities • $6.1 billion senior secured notes and loans Train 4 $6.7 billion estimated total project cost • Financed ~58% debt / ~42% equity at FID • $2.8 billion total equity commitments from NextDecade, GIP , GIC, Mubadala, and TotalEnergies • $3.8 billion construction term loan facilities Train 5 $6.7 billion estimated total project cost • Financed ~61% debt / ~39% equity at FID • $2.6 billion total equity commitments from NextDecade, GIP , GIC, and Mubadala • $3.6 billion construction term loan facilities • $500 million senior secured notes3
Page 35
34 Rio Grande LNG Facility Equity Partners Total Commitments $2.7 Billion • Phase 1 - ~$0.3 billion commitment completed - Up to 20.8% economic interest • Train 4 - ~$1.1 billion commitment fully funded - Initial economic interest of 40%, which will increase to 60% when Financial Investors achieve certain returns • Train 5 - ~$1.3 billion commitment fully funded - Initial economic interest of 50%, which will increase to 70% when Financial Investors achieve certain returns Financial Investors Total Commitments $7.5 Billion • Phase 1 - ~$4.8 billion total commitments - Minimum 62.5% economic interest • Train 4 - ~$1.4 billion total commitments - Initial economic interest of 60%, which will decrease to 40% when certain returns are achieved • Train 5 - ~$1.3 billion total commitments - Initial economic interest of 50%, which will decrease to 30% when certain returns are achieved Total Commitments $1.3 Billion • Phase 1 - ~$1.0 billion commitment - 16.7% economic interest • Train 4 - ~$0.3 billion commitment - 10% economic interest NextDecade aggregate equity commitments funded with ~20% cash and ~80% term loans
Page 36
35 NextDecade’s Train 4 and 5 Equity Commitments Fully Funded with No Material Impact to Equity Term loans, expected to have an attractive all-in cost of ~9%, provide a flexible bridge to a simplified capital structure during steady state operations $1.2 Billion Term Loan (“SuperFinCo Loan”) • Bears interest at 13.0%, with interest payable in kind until one year after Train 4/Train 5 completion1 • Callable at par beginning in September 2030 Note: Expected all-in cost represents projected average cost of term loans over the life of the instruments. 1. Interest on $600MM payable in-kind until 1 year after Train 4 completion. Interest on remaining $600MM payable in-kind until 1 year after Train 5 completion. • Delayed draw bank term loan facility, with projected use of LCs instead of drawn loans for first ~2-3 years after FID for Train 4 and ~4 years for Train 5 • Bears interest at SOFR + 350 basis points, only 150 basis points above margin on project-level bank facility • Commitments cancellable, can be prepaid without penalty ~$1.5 Billion Term Loan Facility (“FinCo Loan”) ~$0.2 Billion Cash • Cash committed from balance sheet at FID of Train 5 Train 4 and 5 equity funding commitments of ~$2.4 billion fully funded utilizing approach with lowest estimated cost of capital and highest impact to cash flow per share
Page 37
36 ~18 MTPA incremental liquefaction capacity potentially available to satisfy demand for incremental LNG in early 2030s+ Developing and Advancing Trains 6-8 on the Path to Doubling Capacity Train 6 • Submitted formal FERC application for Train 6 and a third berth in 2Q 2026 • FERC issued schedule of environmental review in July, final Environmental Impact Statement expected June 25, 2027 • Progressing discussions with potential LNG counterparties to commercially underpin Train 6 with long-term contracts • Target finalizing EPC, commercialization, and financing to enable a positive final investment decision (FID) in 2H 2027 1 Trains 7-8 • Working to finalize location on site • Advancing development and determining required supporting infrastructure • Goal to permit under current administration and commercialize during permitting process Expansion trains expected to offer significant accretion to future NEXT cash flows T6 Third berth 1 Achieving a positive final investment decision (FID) on expansion capacity is subject to, among other things, obtaining all necessary permits and obtaining appropriate commercial support and financing.
Page 38
37 Capital Structure and Financial Guidance
Page 39
38 $1.20 billion1 13.0% senior secured loans due 20332 $1.46 billion senior secured loan facility due 2030 $3.85 billion senior secured credit facility due 2032 $1.0 billion 5.25% senior secured notes due 2031 $700 million 6.67% senior secured notes due 2033 $356 million 6.72% senior secured loans due 2033 $500 million 5.50% senior secured notes due 2034 $1.25 billion 5.75% senior secured notes due 2036 $750 million 6.15% senior secured notes due 2041 $190 million 6.85% senior secured notes due 2047 $1.115 billion 6.58% senior secured notes due 2047 $251 million 7.11% senior secured loans due 2047 $4.8 billion senior secured credit facilities due 2030 $250 million working capital facility due 2030 NextDecade Summary Capital Structure NextDecade Corporation (NASDAQ: NEXT) Rio Grande LNG Phase 1 Super FinCo, LLC Rio Grande LNG Train 4, LLC Rio Grande LNG Phase 2 FinCo, LLC Rio Grande LNG, LLC $175 million1 13.50% senior secured loans due 2030 $100 million1 8.00% senior secured exchangeable loans due 2030 Note: Organizational chart is intended for illustrative purposes only and is not a full organizational chart of NextDecade Corporation. 1 Initial principal balance shown before impact of any paid in kind interest. 2 Maturity date will be the earlier of September 9, 2033, or the 85th day prior to the maturity date of the $1.46 billion senior secured loan facility due 2030, as extended or refinanced. 3 $350 million issued and outstanding as of July 30, 2026, remaining balance to be issued in October 2026. Rio Grande LNG Super Holdings, LLC Rio Grande LNG Phase 1 FinCo, LLC $3.59 billion senior secured credit facility due 2032 $500 million3 6.56% senior secured notes due 2050 Rio Grande LNG Train 5, LLC Rio Grande LNG Phase 2 Super FinCo, LLC NextDecade LNG, LLC Rio Grande LNG Intermediate HoldCo Borrower, LLC $1.0 billion 7.05% senior secured term loans due 2033
Page 40
39 1,000 TBtu 1,675 TBtu 1,125 TBtu 3,800 TBtu 450 1,275 800 2,525 175 175 375 400 325 1,100 - 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 Train 1 Start-Up to Train 3 DFCD (~2027-1Q 2029) Train 3 DFCD to Train 4 DFCD (~1Q 2029-3Q 2030) Train 4 DFCD to Train 5 DFCD (~3Q 2030-2Q 2031) Cumulative Train 1 Start-Up to Train 5 DFCD (~2027-2Q 2031) Uncontracted Volumes Additional Contracted Volumes Long-Term Contracted Volumes ~$1.2 Billion at $3.00/MMBtu margin on uncontracted volumes +~0.8 Billion incremental at $5.00/MMBtu margin on uncontracted volumes $- $0.25 $0.50 $0.75 $1.00 $1.25 $1.50 $1.75 $2.00 $2.25 1 Guidance from Train 1 Start-Up to Train 5 Completion: Robust Cash Flow Projected Across Range of Market Margins Note: DFCD – Date of First Commercial Delivery, DCF – Distributable Cash Flow. Portfolio volumes include early volumes prior to DCFD of the respective Train’s SPAs and operational LNG volumes produced in excess of SPA volumes. See slides “Key Assumptions and Details” and “Non-GAAP Measures” in the appendix for additional information regarding assumptions underlying projected guidance and important information regarding non-GAAP measures. 1 Date of First Commercial Delivery (DFCD) is the expected commencement date of sales of LNG under the long-term SPAs for each train. NextDecade expects to use its share of projected cash flows from Train 1 start-up to Train 5 DFCD to reduce FinCo and SuperFinCo Loan balances and optimize capital structure $ Billions Projected LNG Production Volumes Train 1 Start-Up to Train 5 DFCD1 (Early Volumes ~2027 – 2Q 2031)TBtu TBtu Projected NextDecade Share of Rio Grande LNG Project-Level DCF (~2027 – 2Q 2031) ~$2.0 Billion YTD sold 33% of uncontracted Phase 1 volumes before Train 3 DFCD
Page 41
40 Early Cash Flows Bridge to Strong, Optimized Balance Sheet • Balance sheet optimization and strength paramount for long-term success • Target 3.0– to -3.5x debt to Adjusted EBITDA at NextDecade level1 following Train 5 DFCD • Visible paths to optimize balance sheet and achieve target leverage • Expect to utilize cash flows from early volumes (~2027–2Q 2031) to pay down FinCo and Super FinCo term loan balances, reducing debt, and refinance remaining balances via opportunistic capital markets transactions • If early volumes sold at average margins consistent with $5.00/MMBtu pricing sensitivity, NextDecade level debt projected to be within target range • If early volumes sold at average margins consistent with $3.00/MMBtu pricing sensitivity, expect additional balance sheet optimization to reduce NextDecade level debt to within target range • Estimate additional ~2 MTPA of long-term SPAs across Trains 4 and 5, bringing 5-Train portfolio to over 90% contracted, would enable debt maximization at project levels, reduce equity requirements for Trains 4 and 5, and reduce projected amount of FinCo Loans NextDecade expects to draw to fund equity, reducing projected NextDecade level debt to within target range • Delayed draw FinCo Loan for Train 4 and 5 equity provides flexibility in timing and approach • First draw on FinCo Loan not expected for multiple years for Train 4 and Train 5 • Provides time to evaluate market and assess optimal approach while continuing to sell uncontracted volumes and reduce near-term market exposure • Continue to see strong short-term and long-term LNG sales opportunities in market 1 NextDecade level debt excludes debt at project levels and for the purpose of calculating leverage has been compared to NextDecade’s share of Adjusted EBITDA.
Page 42
41 Steady State Annual Financial Guidance Pricing Sensitivities: Robust Cash Flow Expected Across Range of Market Margins Note: Numbers may not foot due to rounding. Steady state operations reflect the period in which respective trains have been c ompleted, placed in operation, and deliveries under the respective trains’ LNG SPAs have commenced. Projected guidance for Train 1-5 at DFCD of Train 5 reflects NextDecade economic interest of up to 20.8% in Phase 1, 40% in Train 4, and 50% in Train 5. Projected guidance for the Post-Flip period reflects NextDecade economic interest of up to 20.8% in Phase 1, 60% in Train 4, and 70% in Train 5. Th e timing of the economic interest flip for each of Trains 4 and 5 will be dependent upon the final cost of each project, the timing of equity funding for each project, revenues earned during commissioning, revenues earned in the periods prior to DFCD under the LNG SPAs for each train, including the value of uncontracted volumes sold into the market, and the amount of LNG produced by each train. NextDecade fi ve-train projected interest expense assumes cumulative NextDecade Share of Rio Grande LNG Project-Level Distributable Cash Flow from Train 1 start-up to Train 5 DFCD will be utilized to reduce outstanding debt related to financing NextDecade’s equity funding for Trains 4 and 5, and remaining balances will be refinanced in the debt capital markets at interest rates in line with current market rates. Additional pricing sensitivity assumes approximately 2 MTPA of additional long-term contracting is completed across Trains 4 and 5 at prices materially consistent with existing SPAs for Trains 4 and 5 and debt is maximized at the project -level for those trains, resulting in reduced equity requirements for those trains. Rio Grande LNG Project-Level Adjusted EBITDA, Rio Grande LNG Project-Level Distributable Cash Flow, NextDecade Share of Rio Grande LNG Project-Level Distributable Cash Flow, and NextDecade Distributable Cash Flow are non-GAAP measures. A definition of and additional information regarding these non-GAAP measures is included in the appendix. The projected values set forth herein have been based on internal projections developed by management of the Company and assume that the Company will achieve its financial project ions in all material respects. Such financial projections reflect the Company’s best currently available estimates and reflect its good f aith judgments and assumptions it considers reasonable. Events and conditions subsequent to this date as well as other factors coul d have a substantial effect upon the projected values. Please see slide “Key Assumptions and Details” in the appendix for underlying assumptions a nd additional information. Projected NextDecade Annual Steady State Distributable Cash Flow (~2H 2031 - mid-2030s) (~mid-2030s+) (~2H 2031 - mid-to-late 2030s) (~mid-to-late 2030s+) Post-DFCD Post-Flip Post-DFCD Post-Flip Trains 1-5 Trains 1-5 Trains 1-5 Trains 1-5 (TBtu) Projected contracted volumes sold under third-party SPAs 1,325 1,325 1,430 1,430 Projected uncontracted volumes available for sale into market (portfolio volumes) 215 215 110 110 Total estimated annual LNG production volumes 1,540 1,540 1,540 1,540 ($ billions) Rio Grande LNG Project-Level Adjusted EBITDA 3.7 3.7 3.5 3.5 Project-level interest, debt amortization and maintenance capital (1.6) (1.6) (1.7) (1.7) Rio Grande LNG Project-Level Distributable Cash Flow (DCF) 2.1 2.1 1.8 1.8 Equity Partners' Share of Rio Grande LNG Project-Level Distributable Cash Flow (1.4) (1.2) (1.2) (1.0) NextDecade Share of Rio Grande LNG Project-Level Distributable Cash Flow 0.7 1.0 0.6 0.7 NextDecade Estimated Interest and G&A Expense (0.2) (0.2) (0.2) (0.2) NextDecade Distributable Cash Flow 0.5 0.8 0.4 0.5 Impact of $0.50/MMBtu Change in Margin to NextDecade Distributable Cash Flow ~$45 million ~$60 million ~$20 million ~$25 million $5.00/MMBtu Early Volumes and $5.00/MMBtu Steady State $3.00/MMBtu Early Volumes and $5.00/MMBtu Steady State Reaffirm Existing Guidance Additional Pricing Sensitivity (Assumes ~2 MTPA additional SPAs and maximization of project-level debt)
Page 43
42 NextDecade Capital Priorities 1. Protect safe and reliable operations by maintaining high-integrity assets 2. Maintain investment grade metrics for Rio Grande LNG Phase 1, Train 4, and Train 5 • Plan to term out project-level loans and stagger maturities via opportunistic debt capital markets transactions • Amortize / pay down debt as needed to maintain investment grade credit metrics 3. Target 3.0–3.5x debt to Adjusted EBITDA at NextDecade level1 following Train 5 DFCD • Expect to use cash flows from early volumes (~2027–2Q 2031) to pay down FinCo and Super FinCo term loan balances, and refinance remaining balances via opportunistic capital markets transactions • If early volumes sold at average margins consistent with $5.00/MMBtu, NextDecade level debt projected to be within target range; if early volumes sold with average margins consistent with $3.00/MMBtu, expect additional balance sheet optimization to reduce NextDecade level debt to within target range • Estimate additional ~2 MTPA of long-term SPAs across Trains 4 and 5, bringing 5-Train portfolio to over 90% contracted, would enable debt maximization at project levels, reduce equity requirements for Trains 4 and 5, and reduce projected amount of FinCo Loans drawn to fund equity, reducing projected NextDecade level debt to within target range 4. Return capital to shareholders post-DFCD of Train 5, including pre-flip and post-flip cash flows, after capital structure optimization • Balance capital returns with managing leverage and investing in accretive organic growth opportunities • Expect to provide additional information regarding long-term capital allocation and capital return plans after operations commence 1 NextDecade level debt excludes debt at project levels and for the purpose of calculating leverage has been compared to NextDecade’s share of Adjusted EBITDA.
Page 44
43 Empowering the Rio Grande Valley Community
Page 45
44 • Continuous engagement with local stakeholders to: - Obtain a greater understanding of community needs and identify areas where a positive impact can be made, such as education, poverty reduction, and philanthropy - Foster respectful and mutually beneficial relationships - Increase quality of engagement in decisions that impact life in the community • Involvement includes sponsorship of community events, community feedback system, and Community Advisory Board - Engagement through face-to-face meetings, LNG safety demonstrations, open houses, sponsored events, speaking engagements, private meetings, and participation in community events - Community Advisory Board with over 30 members, including school board members, firefighters, business owners, nonprofit organizations, medical professionals, indigenous leaders, and others NextDecade is Committed to the Rio Grande Valley Community Fostering a long-lasting partnership with local stakeholders to create value, provide opportunities, and contribute to a thriving community for all
Page 46
45 • NextDecade’s community engagement is founded on four core values: - Fostering local economic prosperity - Cultivating inclusivity - Nurturing leadership - Promoting sustainability • Community feedback frequently focuses on: - Current career opportunities and career paths for future jobs - Local business inquiries - Project updates NextDecade is Committed to the Rio Grande Valley Community Fostering a long-lasting partnership with local stakeholders to create value, provide opportunities, and contribute to a thriving community for all “The Rio Grande LNG project offers long-term benefits that will greatly enhance Cameron County’s future…this project will provide crucial funding for education, infrastructure, quality of life initiatives, and drainage improvements. These enhancements will improve living standards and attract further investments, creating a sustainable cycle of economic growth and development. ” – David A. Garza, Cameron County Commissioner, Precinct 3 “We fully endorse and advocate for the development of the Rio Grande LNG export facility, believing that it will bring significant benefits to the entire Rio Grande Valley, including the environmental justice community. ” – Bernard Barcena, Chairman, Lipan Apache Tribe of Texas
Page 47
46 Miradores Environmental Mitigation Project 350 Acres of wetlands created 21 Acres of existing wetlands improved 28,000 Plants added to the Mitigation site Restoration of the Miradores Mitigation Site near Brownsville, Texas, began in September 2023 and was completed in June 2025, placing more than 1,500 acres under a conservation easement “As a longtime steward of this land, it’s incredibly meaningful to see it restored and protected for future generations” – Ovi Atkinson, Miradores landowner
Page 48
47 Appendix
Page 49
48 Steady state period refers to the period beginning when respective trains have been completed and placed in operation and deliveries under each train’s LNG SPAs have commenced. Projected guidance assumes SPA contract price for all contracted volumes and a $3.00/MMBtu or $5.00/MMBtu cargo margin, as specified per sensitivity provided, for all uncontracted volumes, which represents sales prices less cost of gas, inclusive of basis differential impacts utilizing market curves, and less shipping costs. Projected guidance assumes annual net LNG production of approximately 6 MTPA per train during the steady state period and an MTPA to MMBtu conversion factor of approximately 52. Annual net production may vary depending on maintenance schedules each year, and projected production for the period from Train 1 start-up to Train 5 SPA deliveries is based on the Company’s current production plan. Projected guidance assumes existing Rio Grande LNG project-level senior loans and notes with amortization features are amortized according to their contractual schedules, project-level senior notes and loans without amortization features remain outstanding, and project-level term loan balances are 50% amortized and 50% refinanced at an interest rate of 6.50%. Projected guidance excludes potential impacts of production debottlenecking. The timing of the economic interest flip for each of Train 4 and Train 5 will be dependent upon the final cost of each project, the timing of equity funding for each project, revenues earned during commissioning, revenues earned prior to the commencement of deliveries under each train’s respective LNG SPAs, including the value of uncontracted volumes sold into the market, and the amount of LNG produced by each train. NextDecade’s share of income from Rio Grande LNG is expected to be significantly shielded from tax through approximately the mid-2030s and subsequent NextDecade expected tax payments will be dependent upon NextDecade’s capital structure and deductions. Pursuant to the Phase 1 joint venture agreement, NextDecade is entitled to receive approximately 20.8% of distributions of available cash during operations, provided that a majority of the distributions to which NextDecade is otherwise entitled will be paid for any distribution period only after the Financial Investors receive an agreed distribution threshold in respect of such distribution period and certain other deficit payments from prior distribution periods, if any, are made. Any such shortfall in distributions that NextDecade would otherwise have been entitled to will accrue as an arrearage to be paid out in future periods until the applicable target distribution threshold for the Financial Investors has been achieved. Pursuant to the Train 4 joint venture agreement, NextDecade is entitled to receive an initial 40% of distributions of available cash during operations, which will increase to 60% when the Financial Investors receive certain returns on their investments in Train 4. Pursuant to the Train 5 joint venture agreement, NextDecade is entitled to receive an initial 50% of distributions of available cash during operations, which will increase to 70% when the Financial Investors receive certain returns on their investments in Train 5. NextDecade level debt is calculated as the total debt of NextDecade and its subsidiaries, excluding debt at project-level entities Rio Grande LNG, LLC, Rio Grande LNG Train 4, LLC, and Rio Grande LNG Train 5, LLC. Rio Grande LNG Project-Level Adjusted EBITDA, Rio Grande LNG Project-Level Distributable Cash Flow, NextDecade Share of Rio Grande LNG Project-Level Distributable Cash Flow, and NextDecade Distributable Cash Flow are non-GAAP measures. A definition of and additional information regarding these non-GAAP measures is included on slide “Non-GAAP Measures.” The projected values set forth herein have been based on internal projections developed by management of the Company and assume that the Company will achieve its financial projections in all material respects. Such financial projections reflect the Company’s best currently available estimates and reflect its good faith judgments and assumptions it considers reasonable. Events and conditions subsequent to this date as well as other factors could have a substantial effect upon the projected amounts. The Company gives no assurance that its projections will prove to be correct and does not undertake any duty to update them. Key Assumptions and Details
Page 50
49 Rio Grande LNG Project-Level Adjusted EBITDA, Rio Grande LNG Project-Level Distributable Cash Flow, NextDecade Share of Rio Grande LNG Project-Level Distributable Cash Flow, and NextDecade Distributable Cash Flow are non-GAAP financial measures that we use to assess operating performance. These non-GAAP measures should not be viewed as a substitute for our U.S. GAAP measures of performance and financial results prepared in accordance with U.S. GAAP. We believe Rio Grande LNG Project-Level Adjusted EBITDA provides investors and other users of our consolidated financial statements with useful supplemental information to evaluate the financial performance of our business without regard to financing methods, capital structures, or historical cost basis, to enable comparison of our operating performance across periods. Rio Grande LNG Project-Level Adjusted EBITDA also allows investors and other users of our financial statements to evaluate our operating performance in a manner that is consistent with management’s evaluation of financial and operating performance. We define Rio Grande LNG Project-Level Adjusted EBITDA as net income (loss), as determined in accordance with U.S. GAAP, adjusted to exclude net income (loss) attributable to non-controlling interests, net interest expense, income taxes, depreciation and amortization expense, and adjusting for the effects of certain non-cash items, other non-operating income or expense items, and other items not otherwise predictive or indicative on ongoing operating performance, including gain (loss) on financing transactions, impairment expense, gain or loss on disposal of assets, changes in the fair value of derivatives, and non-cash compensation expense. We define Rio Grande LNG Project-Level Distributable Cash Flow as Rio Grande LNG Project-Level Adjusted EBITDA less net project-level interest expense, income taxes, debt amortization, and maintenance capital expenditures. We define NextDecade Share of Rio Grande LNG Project-Level Distributable Cash Flow as Rio Grande LNG Project-Level Distributable Cash Flow less amounts that would be distributable to equity partners. Amounts that would be distributable to NextDecade and equity partners are calculated based on respective economic interests in each train. We define NextDecade Distributable Cash Flow as NextDecade Share of Rio Grande LNG Project-Level Distributable Cash Flow less NextDecade interest expense and general and administrative expenses. We believe NextDecade Share of Rio Grande LNG Project-Level Distributable Cash Flow and NextDecade Distributable Cash Flow provide investors and other users of our financial information with useful supplemental information to evaluate our performance and to measure our expected economic interest in the cash flows generated by the Rio Grande LNG Facility. Rio Grande LNG Project-Level Adjusted EBITDA and Rio Grande LNG Project-Level Distributable Cash Flow are not intended to represent net income (loss) or cash flows from operations as defined by U.S. GAAP and should be viewed as a supplement to and not a substitute for measures of performance, financial results and cash flow from operations calculated in accordance with U.S. GAAP. Other companies, including companies in our industry, may also calculate Adjusted EBITDA or Distributable Cash Flow differently, which may limit their usefulness as comparative measures. NextDecade Share of Rio Grande LNG Project-Level Distributable Cash Flow and NextDecade Distributable Cash Flow are not intended to represent cash flows from operations or net income as defined by U.S. GAAP and are not necessarily comparable to similarly titled measures reported by other companies. Rio Grande LNG Project-Level Distributable Cash Flow, NextDecade Share of Rio Grande LNG Project-Level Distributable Cash Flow, and NextDecade Distributable Cash Flow are not intended to suggest any particular amount of distributions or dividends for any particular period. Actual distributions may be restricted by financing agreements or other capital needs. The projected values set forth in this presentation have been based on internal estimates of projected cash flow developed by management of the Company and assume that the Company will achieve its financial projections in all material respects. Such financial projections reflect the Company’s best currently available estimates and reflect its good faith judgments and assumptions it considers reasonable. Events and conditions subsequent to this date as well as other factors could have a substantial effect upon the projected amounts. The Company gives no assurance that its projections will prove to be correct and does not undertake any duty to update them. Due to the high variability and difficulty in making accurate projections of Adjusted EBITDA and Distributable Cash Flow, together with some of the excluded information not being ascertainable or accessible, the Company is unable to quantify certain amounts that would be required to be included in the most directly comparable GAAP financial measure without unreasonable effort. Consequently, no disclosure of estimated comparable GAAP measure is included, and no reconciliation of the forward-looking non-GAAP financial measure is included. Non-GAAP Measures